    2011- Mount Weld ore

    Construction of the Concentration Plant is
    scheduled for completion for December 2010.
    The Operations team will then take ownership
    to commence the commissioning stage.
    Phase 1 production at the Concentration
    Plant is set to begin at the start of 2011.
    The stockpiled Mount Weld ore will be
    concentrated by flotation to produce a Rare
    Earths concentrate at a target grade of 40%
    Rare Earths Oxide (REO). The concentrate will
    be placed in two tonne bulker bags, loaded
    into sea containers at site and then trucked
    to the Western Australian Port of Fremantle.
    At the port the containers will be transferred
    to container ships and sea freighted to the
    port of Kuantan in Pahang, Malaysia. It is
    then a short 5km trip for delivery to the
    Lynas Advanced Materials Plant (LAMP) to
    be stockpiled ready for the LAMP start-up.

    SortNewest  |  Oldest  |  Most Replied Expand all replies
 
LYSCF
0.102-0.007(-6.76%)Sep 22 3:57 PMEDT

Trending Tickers

i
Trending Tickers features significant U.S. stocks showing the most dramatic increase in user interest in Yahoo Finance in the previous hour over historic norms. The list is limited to those equities which trade at least 100,000 shares on an average day and have a market cap of more than $300 million.