Recent

% | $
Quotes you view appear here for quick access.

Titan Machinery, Inc. Message Board

dkwilk 8328 posts  |  Last Activity: Jul 10, 2016 10:59 AM Member since: Dec 22, 1997
SortNewest  |  Oldest  |  Highest Rated Expand all messages
  • 26 years of Historical 10 yr treas rates. When the tide of interest rates changes dividend paying stock will be under pressure.. don

    .Jul 8, 2016 1.37%
    Jan 1, 2016 2.09%
    Jan 1, 2015 1.88%
    Jan 1, 2014 2.86%
    Jan 1, 2013 1.91%
    Jan 1, 2012 1.97%
    Jan 1, 2011 3.39%
    Jan 1, 2010 3.73%
    Jan 1, 2009 2.52%
    Jan 1, 2008 3.74%
    Jan 1, 2007 4.76%
    Jan 1, 2006 4.42%
    Jan 1, 2005 4.22%
    Jan 1, 2004 4.15%
    Jan 1, 2003 4.05%
    Jan 1, 2002 5.04%
    Jan 1, 2001 5.16%
    Jan 1, 2000 6.66%
    Jan 1, 1999 4.72%
    Jan 1, 1998 5.54%
    Jan 1, 1997 6.58%
    Jan 1, 1996 5.65%
    Jan 1, 1995 7.78%
    Jan 1, 1994 5.75%
    Jan 1, 1993 6.60%
    Jan 1, 1992 7.03%
    Jan 1, 1991 8.09%
    Jan 1, 1990 8.21%

  • dkwilk dkwilk Jul 7, 2016 5:35 PM Flag

    Jerry , Are you thinking of buying a ETF , Short on the 10 yr Treas..??
    when 10 yr treas go back to 3-3.5 % MDU could loose 25 %.. Treas rates have been gong down since 1984, .don

  • MEDORA—The organizers of the Davis Refinery project proposed for the Belfield area cleared an early but major hurdle Wednesday at the regular meeting of the Billings County Commission.

    After more than four hours of public questions, comments and informational presentations, including some remarks delivered by state health officials, commissioners agreed to rezone more than 715 acres of land from agricultural to industrial use to house the proposed $900 million, 55,000 bpd petroleum refinery planned by California-based Meridian Energy Group Inc

  • From today FT.article. don
    The US holds more oil reserves than Saudi Arabia and Russia, the first time it has surpassed those held by the world’s biggest exporting nations, according to a new study.

    Rystad Energy estimates recoverable oil in the US from existing fields, discoveries and yet undiscovered areas amounts to 264bn barrels. The figure surpasses Saudi Arabia’s 212bn and Russia’s 256bn in reserves.

    The analysis of 60,000 fields worldwide, conducted over a three-year period by the Oslo-based group, shows total global oil reserves at 2.1tn barrels. This is 70 times the current production rate of about 30bn barrels of crude oil a year, Rystad Energy said on Monday.

    Recoverable reserves — those barrels that are technologically and economically feasible to extract — are analysed by the energy industry to determine company valuations and the long-term health of an oil-producing nation’s economy.

    Conventional oil producers, such as Saudi Arabia, have traditionally used their huge resource riches to wield power globally, particularly among big consumer countries such as the US.

    This relationship has been disrupted in recent years by hydraulic fracturing and other new technologies that have helped the US unlock vast reserves and enabled it to become more energy independent.

  • is less then 200 days now.. and the world will be Rid of the Current USA Mis-management team..4 months from today is election day.. Like ML King said Free at last, free at last , Thank God we are free at last.. don

  • Dickinson press
    BELFIELD—The company trying to build an oil refinery just three miles from Theodore Roosevelt National Park in Billings County isn't slowing down its efforts, even after the Dakota Prairie Refinery sold at a loss earlier this week.
    Thomas Johnson, chief operating officer of California-based Meridian Energy Group, said Tuesday's sale of the Dickinson diesel refinery doesn't affect his company's goal of building the Davis Refinery, which would process 55,000 barrels of Bakken crude a day.

    "We did economic modeling, what our costs are going to be and concluded that we're going to make some profits there in the Bakken and the Belfield area," Johnson said.

    Tesoro bought the Dakota Prairie Refinery from MDU Resources Group and Calumet Specialty Products, which broke ground on the refinery in 2013 and opened it in May 2015.
    Johnson pointed to the Davis Refinery's efforts to build a refinery that'll produce gasoline, jet fuel and ultra-low sulfur diesel fuel as the difference between its plans and the Dakota Prairie Refinery, which processed 20,000 barrels of oil into around 8,000 barrels of diesel fuel a day, along with a set of byproducts.

    MDU Resources spent $430 million on the refinery and reported that it lost $7.2 million in its first quarter of operations. The refinery's construction was plagued by cost overruns and construction delays.
    Johnson said he was involved in the building of PetroMax Refining, a 25,000-barrel-a-day refinery in Houston that opened last year, and said Meridian is using a similar business model with the Davis Refinery.
    "We were successful last year, so we fully anticipate being successful this time," Johnson said. "The key is not to get into a situation like Dakota Prairie. It's unfortunate what happened, but it is a good lesson to learn."
    In an effort to rally community support for the Davis Refinery, Meridian is hosting a public gathering at 5 p.m. Tuesday atop Buck Hill, the highest point in Theodore Roosevelt National

  • Reply to

    MDU a vote of NO confidence..

    by dkwilk Jun 29, 2016 11:44 AM
    dkwilk dkwilk Jun 29, 2016 3:26 PM Flag

    Skip . go back and look at last 2 yrs of the Titanic, ( I mean MDU ) forget the price of oil,, here are the decisions Management and BOD made.. Sold Good Bakken wells ( can you say in there home state ) bought the spent that same amount of Money on powder river Basin on BLM acerage and less production..Paid the E+P dud over $ 2 Million per yr , to hold down a chair, cause he did not know how to profitably find oil.. Stopped drilling in bakken of MT acreage, till they figured it out ( which they never did ) Hit 1 huge well in Utah, and could not get rest of picture together..
    Built a Refinery with a Partner ( who was supposed to Know how to manage/run refinerys) Sold ithis white elephant for pennies on the Dollar..
    Let OKE /oneok develop 6 or 7 NG processing plants right in back yard ( they own 50 % of the belfield plant) so they should know how to build and Run NG plants..
    I think they should have Kept E+P unit and ran it like Northern Oil and gas ( NOG ) let some one like Slawson or CLR,or hess,do the drilling and received a % of the oil as payment.. Then they could have let go of the $ 2 Million per yr E+P dude who could not find oil, get rid of CEO, and 50 % of Management staff..
    All I can say is Thank God for the MDU shareholders is that Elec and NG rates are guaranteed by PSC or they would give that Away..
    Now they want to spend over 1 Billion $$$$$ in next 5 years on what... ( buggy whips ) cause horse and buggies get better mileage then cars..who is going to guarantee a return for the share holders????
    if I missed anything please add.. don

  • I see the collective Target Price of MDU was lowered today to $23.50, after it had been raised to $ 24.00 on 6.12.16.. The announcement of the sale to Tesoro of the DPR yesterday , for the ridiculous price MDU received will /could trigger more Target price down grades..
    if the 10 Yr Treasury was trading at a historical interest instead of the 0bama depression rate MDU stock would be $ 15.00.. don

  • Reply to

    MDU Management Sucks

    by dkwilk Jun 28, 2016 11:02 AM
    dkwilk dkwilk Jun 28, 2016 12:56 PM Flag

    If MDU is in a 36 % federal Tax bracket that means it takes a $ 250 Million $$ pre tax loss to equal $ 160 Million in after tax write off.. I you were planning on a Dividend increase this year , DO NOT hold your breath..
    Jerry says a sale by Year end, possible , I wonder how much Bonus the Management will get for selling MDU,
    The only positive thing going is the temp in MT and ND is hot so they should sell Elec for the air conditioners...

  • So MDU bought the other half of DPR from Calumet, then sold it to Tesoro and Guess what.. the refinery that cost $ 420 Million , had 4 quarters of losses was only worth $76 Million $$$$.. but Hurray for the Shareholder they get to Write off $ 160 Million, And the MDU execs get another Bonus...From the 8 K filed today. ( note that is AFTER TAX charge..) Yes $ 1.00 per share... Well I guess they can go to work for Hillary if she gets elected...don


    Item 2.06. Material Impairments.
    The Board of Directors of MDU met on June 24, 2016, to evaluate the potential sale of DPR to Tesoro. In connection with the board's decision to proceed with the sale, MDU concluded that the fair value of DPR based on the proposed sale transaction to Tesoro was less than the current recorded book value of DPR and that a material charge for impairment is required under generally accepted accounting principles. Coinciding with this process, management concluded that DPR's financial results qualified for presentation as assets held for sale and discontinued operations. MDU anticipates an after-tax impairment charge from these discontinued operations in the range of $150 million-$160 million, subject to customary closing adjustments, to be recorded in the second quarter. No ongoing future cash expenditures are expected in connection with the recording of this impairment charge.

  • AP is reporting. don
    CHEYENNE, Wyo. (AP) — A judge ruled Tuesday that federal regulators lack the authority to set rules for hydraulic fracturing, dealing another setback to the Obama administration's efforts to tighten how fossil fuels are mined.

    U.S. District Judge Scott Skavdahl said the Bureau of Land Management can't set the rules because Congress has not authorized it to do so. The judge, who was nominated by Obama in 2011, wrote that the court's role is not to decide whether hydraulic fracturing is good or bad for the environment, but to interpret whether Congress has given the Department of Interior legal authority to regulate the practice.

    "It has not," wrote Skavdahl, who last year blocked implementation of rules drafted by the agency.
    The states of Colorado, North Dakota, Utah and Wyoming oppose the rules involving hydraulic fracturing, which involves injecting substances including water, sand and chemicals underground to increase production from oil and gas wells
    The Bureau of Land Management and a coalition of environmental groups say the rules are necessary to protect the environment. The bureau's rules would have required petroleum developers to disclose to regulators the ingredients in the chemical products they use to improve the results of hydraulic fracturing, also known as fracking.
    Attempts to reach the Bureau of Land Management and Wyoming Attorney General Peter Michael for comment about the ruling late Tuesday were unsuccessful.

    Neal Kirby, a spokesman for the Independent Petroleum Association of America, said Tuesday he is pleased with Skavdahl's decision.
    "BLM did not have the authority to issue its rule in the first place," Kirby said. "Today's decision demonstrates BLM's efforts are not needed and that states are — and have for over 60 years been — in the best position to safely regulate hydraulic fracturing."
    Meanwhile, U.S. Rep. Cynthia Lummis of Wyoming called the ruling a victory for states' rights.
    "This rule undermined the

  • The Public Service Commission on Wednesday approved the contentious 87-turbine Brady Wind Energy Center I in northern Stark County near Dickinson.
    The $250 million project by NextEra Energy Resources, which will provide 150 megawatts of power for Basin Electric Power Cooperative, faced stiff opposition. It was the second attempt at the project in the county.

    The PSC voted unanimously to approve the project, as well as the corresponding 19-mile transmission line.

    The project involved the longest wind farm hearing in state history, with 15 hours of testimony on March 31.
    “We worked really hard on this project, and we listened,” said PSC Chairman Julie Fedorchak. “I’m happy to support this at this time.”

    NextEra expects construction to begin this month, with the project scheduled to be completed by the end of the year.
    “We are pleased with the PSC’s decision to permit the Brady I Wind Energy Center,” NextEra spokesman Bryan Garner said. “Today’s decision is a result of months of working in partnership with the local community to find a project that addresses both the needs of the community as well as the demand for clean, renewable energy.”

    The PSC’s decision ended 15 months of debate among Stark County landowners and public officials about the future of wind energ
    Tom Reichert, spokesman for the Concerned Citizens of Stark County, which opposed the project, said even though the group is disappointed in the PSC’s decision, it will continue to provide input to other citizens in other communities who are concerned about wind farms.
    He said that mostly there is a lot of frustration on the opposition's side.
    “We worked really hard, and we’re still frustrated that Stark County did such a poor job,” he said.

    Reichert added that the group is still actively seeking a lawsuit against Stark County with what they claim was a violation of open-meeting proto

  • Xcel Energy’s proposed electricity rate hike for its Minnesota customers – 9.8 percent over three years — is excessive and should be significantly reduced, two state agencies say.

    The Minnesota Commerce Department and Minnesota Attorney General’s Office made those claims in comments filed this week with the Minnesota Public Utilities Commission (PUC). Both agencies are tasked with looking out for the public interest in rate cases before the PUC.
    In November, Minneapolis-based Xcel filed for an electricity rate increase of $297 million over three years, the bulk of which — $195 million or 6.4 percent — would be realized in 2016.

    The Commerce Department is requesting that Xcel’s proposed $195 million increase for 2016 be reduced to $44 million.

    “The Commerce Department analysis finds that Xcel’s rate increase proposal overstates the company’s costs and understates its revenue while seeking higher profits than is justified in the current market,” the department said in a statement to the Star Tribune.
    The attorney general’s office said Xcel’s rate increase would “unreasonably shift tens of millions of dollars of cost responsibility onto residential and small business customers.”

    The attorney general also panned Xcel’s proposal to increase the residential basic rate — which customers pay regardless of how much electricity they use — from $8 to $10 per month. Xcel should be using a different methodology that would actually lower the basic rate, the AG’s office said. Xcel has said the $2 basic rate hike would bring it in line with the cost of service.

    Minnesota’s largest electric utility, Xcel has said that major drivers of the rate increase include upgrades to its power grid and nuclear power plants; and investments in cleaner energy.

    “The investment plan we proposed last year will result in cleaner air, a better environment and a more resilient, flexible energy system that will deliver value to our customers,” Laura McCarten, Xcel’s vice president for state a

  • A survey of utilities and independent power producers across the nation's central corridor shows a potential generation shortfall as soon as mid-2018 because of a wave of announced power plant shutdowns.

    The survey by the Carmel, Ind.-based Midcontinent Independent System Operator (MISO) and the Organization of MISO States Inc. shows the grid operator's 15-state footprint has a generation surplus of as much as 2.7 gigawatts next summer. But possible plant retirements could shrink the cushion to 900 megawatts. And even though MISO will have ample capacity, areas such as Michigan's Lower Peninsula will rely on capacity imports.

    The OMS-MISO survey provides a look forward at expected electricity demand and power plant availability over a five-year span. By comparison, MISO's annual capacity auction only looks out 12 months.

    This year's survey, the third iteration, was extended to independent power producers for the first time this year. The results were widely anticipated because of the ongoing transition of the generation fleet in MISO and running debates in states like Illinois and Michigan about how to ensure reliability and maintain competitive electric rates. All of this is occurring while U.S. EPA's Clean Power Plan -- expected to lead to even more coal retirements -- is awaiting court review .

  • Court arguments over the Clean Power Plan that were to be held today in the U.S. Court of Appeals for the D.C. Circuit have been delayed until Sept. 27.

    The climate-change plan will place coal-fired power plants in North Dakota under a 2030 deadline to reduce carbon dioxide emissions by 45 percent, with less than three years to detail a compliance plan. North Dakota has the third-highest reduction of all states, after Montana and Wyoming. Coal states pushed back against the plan, saying the Environmental Protection Agency lacks authority, and, in early February, the Supreme Court voted to freeze implementation while legal issues are resolved first by the appeals court.

    In May, the appeals court decided it would hear arguments in full bench rather than as a three-judge panel and delayed a hearing until fall. There are 11 judges on the appeals court and two have recused themselves from the Clean Power Plan case.

    In a statement to employees, Basin Electric Power Cooperative’s attorney Anine Lambert said full bench hearings are usually reserved for instances when a party petitions for one after a smaller panel hearing and only then in cases of exceptional importance.
    “In this case, I think the judges believe the Clean Power Plan is a matter of exceptional importance,” Lambert said.
    Basin operates two of North Dakota’s seven coal-fired plants, the Leland Olds Station at Stanton and the Antelope Valley Station north of Beulah.

  • can use as a value basis for MDU..donGreat Plains Energy Inc. agreed to buy Westar Energy Inc., the biggest utility in Kansas, for $8.6 billion as power companies across the U.S., facing weak demand and rising operational costs, look to consolidate.
    Great Plains will pay $51 per share in cash and $9 per share in stock, Westar said Tuesday in a statement. The company will also assume $3.6 billion in debt, according to the statement. Great Plains Chief Executive Officer Terry Bassham will become chairman and CEO of the combined company, while Mark Ruelle will remain at the company until the deal closes.

    The transaction comes amid a boom in utility mergers and acquisitions as customers using more energy-efficient appliances and resources such as rooftop solar flatten electricity demand. There were more than $52 billion worth of utility deals pending or completed across the U.S. last year, the most since 2011, data compiled by Bloomberg show.

    “The combination of our two companies is the best fit for meeting our region’s energy needs,” said Bassham. “By combining our two companies, we are keeping ownership local and management responsive to regulators, customers and regional needs.”
    Westar delivers power to about 700,000 customers in Kansas and owns power plants capable of producing about 7,000 megawatts, according to the company’s website. It operates in a single state so regulatory approvals may not be as complicated to obtain as they have been for utility deals involving several jurisdictions.
    Goldman Sachs Group Inc. will provide about $8 billion of debt financing for the deal, according to the statement.

  • dkwilk dkwilk May 24, 2016 4:02 PM Flag

    Idiots like this are Allowed to Vote...to bad the bear did not completely eat him.. don

  • Reply to

    New Bank in Watford city ND

    by dkwilk May 4, 2016 12:15 PM
    dkwilk dkwilk May 14, 2016 10:10 AM Flag

    ***********************************

    First International Bank -- Watford City -- Breaks Ground In Bismarck, ND

    First International Bank & Trust, a company that started 106 years ago and is headquartered in Watford City, broke ground Wednesday for a six-story building, its largest bank, in Bismarck.
    Gov. Jack Dalrymple and Attorney General Wayne Stenehjem were among the dignitaries attending the ceremony.
    The $40 million structure is set to open in fall 2017 and will be located across from the North Dakota Heritage Center near the intersection of State Street and Divide Avenue.
    More:

    First International Bank & Trust has 26 banks (sic) in Minnesota, Arizona and North Dakota, including five locations in Fargo.
    The newest bank in Bismarck will be by far the largest facility, Peter Stenehjem said.

    “We’re kind of across the whole state of North Dakota; it’s funny that we kept always skipping over Bismarck," Peter Stenehjem said.
    "It'll be a landmark building for all of our locations, frankly," he said.

  • This weeks Jobless Numbers on top of last weeks disappointing Numbers looks like the country is SO Close to Recession that the Current Inept administration in DC will not raise Interest Rates in Fiscal yr 2016 .
    This should allow MDU and other similar stocks a constant base , unless the screw something else up..
    don

  • todays Bismarck trib.. Bismarck get 202 Sunny days a year, near the US average of 205 sunny days. don

    Solar panels are not mentioned at all in city building code, according to land use planner Daniel Nairn. And if something is not mentioned in code, it’s assumed to be prohibited. So city staff drafted an ordinance to allow solar panels in all zoning districts — with some restrictions to protect neighborhood aesthetics.

    Bismarck Mayor Mike Seminary and other members of the Bismarck City Planning and Zoning Commission applauded city staff for getting ahead of the potential issue

    Seminary said he expects popularity of solar panels to increase within the next three to five years.
    City staff reached out to solar panel installers and the energy industry for advice when drafting the ordinance. For “building integrated systems” that are part of the home, such as a skylight, there are no restrictions. For roof- and wall-mounted panels, there are some restrictions on the angle in which they’re hung.

    The most restrictions are on free-standing panels, which may be no more than 12 feet in height and, in a residential area, may not span more than 800 square feet under the ordinance. Residential lots in rural areas may have panels spanning 200 square feet per acre, and commercial properties can have panels spanning half the footprint of their commercial structure. Accessory building setback requirements will apply.

    The issue came to city staff after Rick Geloff, a resident of north Bismarck, approached them with hopes of building a solar array in his backyard.
    Electricity rates in North Dakota are the second cheapest in the nation, according to the U.S. Energy Information Administration. In January, residential customers paid an average of 8.57 cents per kilowatt hour. Geloff also said he gets about 4.5 hours of sun each day on average.

    “To make the numbers work, this ordinance won’t help me,” he told the commission, as the allowable square footage is not enough.

TITN
10.40-0.11(-1.05%)Sep 30 4:00 PMEDT