Sat, Sep 20, 2014, 3:28 AM EDT - U.S. Markets closed

Recent

% | $
Quotes you view appear here for quick access.

iShares Silver Trust Message Board

sandspiderbm 3 posts  |  Last Activity: Oct 22, 2013 10:18 AM Member since: Jan 10, 2005
SortNewest  |  Oldest  |  Highest Rated Expand all messages
  • Reply to

    My Favorite PR Quote from Strathcona LMFAO

    by uncletizz Oct 22, 2013 10:16 AM
    sandspiderbm sandspiderbm Oct 22, 2013 10:18 AM Flag

    Did you read the press release fully? What about the fact that the Strathcona method (sample tower method) would have generated 96% less than what was recovered from milling?

    Preliminary figures from the processing of the 426585E cross-cut show the contained metal included 281 ounces of gold. It is the opinion of both Pretivm and Snowden that there is a significant difference in the contained gold estimated by the selective sampling of the 426585E cross-cut by the sample tower and the actual contained gold determined by milling the total 2,167 tonnes of material excavated from the 426585E cross-cut (there is 94% more gold produced from the mill than was estimated from the sample tower results for the same material). A related discussion on the sample tower component of the Program, Strathcona's stated reasons for withdrawing from the Program, and Snowden's response is set out below.

  • About 4.0 g/tonne gold and around 7.6 g / tonne silver, while the company expected 4.6 and 6.8 resspectively. It is detailed in the press release:

    The 426585E cross-cut excavation cuts through portions of three Feasibility Study stopes (the "426585E Stopes"). The tonnage processed and the grade of the gold and silver produced from the material excavated from the 426585E development going through these stopes was estimated to be 1,451 tonnes grading 4.6 grams per tonne gold and 6.8 grams per tonne silver, based on the preliminary mill results estimated for the 426585E Stopes. The value of the gold and silver produced from the 426585E Stopes was estimated to be $204.03/tonne at Feasibility Study base case metal prices providing an operating margin of $47.57/tonne over Feasibility Study operating costs.

    Investors need to remember that each of the bulk samples are NOT homogenous but heterogenous - so you cant just multiply the gold milled times 5 to get the expected amount for total milling. Different bulk samples have different expected recoveries.

    This may be a decent buying opportunity as investors misinterpret the results.
    Spider

  • Reply to

    11.33 g/tonne

    by lookahead22 Oct 9, 2013 9:24 AM
    sandspiderbm sandspiderbm Oct 9, 2013 10:02 AM Flag

    Whats strange is that Strathcona resigned but didnt report poor results. Why wouldn't they simply report poor results?

SLV
17.19-0.58(-3.26%)Sep 19 4:00 PMEDT

Trending Tickers

i
Trending Tickers features significant U.S. stocks showing the most dramatic increase in user interest in Yahoo Finance in the previous hour over historic norms. The list is limited to those equities which trade at least 100,000 shares on an average day and have a market cap of more than $300 million.
Oracle Corporation
NYSEFri, Sep 19, 2014 4:00 PM EDT
Pier 1 Imports, Inc.
NYSEFri, Sep 19, 2014 4:02 PM EDT