{ "market" : {"NAME" : "U.S.", "ID" : "us_market", "TZ" : "ET", "TZOFFSET" : "-18000", "open" : "1259591416", "close" : "1259614816", "flags" : {}} , "STREAMER_SERVER" : "http://streamerapi.finance.yahoo.com","arrowAsChangeSign" : false,"throttleInterval": "1000"}
prnewswire

September 10 New Date for Full-Scale NASA and ATK Motor Test for Ares I Solid Rocket

ATK and NASA to Perform First Ground Test of the Ares I Five-Segment Solid Rocket Motor
Test is a Major Milestone for ATK, NASA on Ares I Program

  • Press Release
  • Source: ATK
  • On 5:08 pm EDT, Friday September 4, 2009

PROMONTORY, Utah, Sept. 4 /PRNewswire-FirstCall/ -- Alliant Techsystems (NYSE: ATK - News) Space Systems and NASA identified the issue that resulted in the scrub of last week's test. A component of the ground controller unit, which sends power to the system that moves the nozzle during the test, failed and has been replaced. The test has been rescheduled for Thursday, Sept. 10. Final testing of the ground system will continue over the weekend and early next week.

Related Quotes

SymbolPriceChange
ATK86.700.00
Chart for ALLIANT TECH SYS INC
{"s" : "atk","k" : "c10,l10,p20,t10","o" : "","j" : ""}

          What:  Horizontal ground test firing of Ares I first stage
          UPDATED date:  Thursday, September 10, 2009
          Time:   1 p.m. MDT
          Where:  ATK Space Systems facility in Promontory, Utah

Test Objectives/Background:

  • A total of 46 design objectives will be measured through 650 instrument channels
  • The Ares I design is based on the design of the space shuttle's four-segment booster
  • The addition of the fifth segment will increase the maximum thrust performance to approximately 3.6 million pounds
  • The first stage of Ares I has been under development since 2005. It measures 12 feet in diameter and 154 feet in length
  • The cases have all previously flown on the space shuttle, collectively launching on 48 missions--including STS-1
  • A public viewing area is available along State Road 83 North approximately 20 miles west of Corinne, Utah. For more information on the test call 1-866-318-4888.

For more information and to request a media pass, contact Trina Patterson at (801) 699-0943 or trina.patterson@atk.com.

    Media Contacts:
    Trina Patterson                             George Torres
    Cell: 801-699-0943                          Cell: 801-699-2637
    email: trina.patterson@atk.com              email: george.torres@atk.com

Sponsored Links

Copyright © 2009 PR Newswire. All rights reserved. Republication or redistribution of PRNewswire content is expressly prohibited without the prior written consent of PRNewswire. PRNewswire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.