{ "market" : {"NAME" : "U.S.", "ID" : "us_market", "TZ" : "ET", "TZOFFSET" : "-18000", "open" : "", "close" : "", "flags" : {"h" : "Thanksgiving Day"}} , "STREAMER_SERVER" : "http://streamerapi.finance.yahoo.com","arrowAsChangeSign" : false,"throttleInterval": "1000"}
ap

Wisconsin regulators set wind farm hearings

Wis. regulators set hearings for wind farm with capacity to produce 207 megawatts of power

  • On 11:56 am EDT, Friday October 2, 2009

MADISON, Wis. (AP) -- Wisconsin regulators have scheduled 2 public hearings Nov. 4 on a proposal for a 90-turbine wind farm in Columbia County.

Wisconsin Electric Power Co., a subsidiary of Wisconsin Energy Corp., asked the state Public Service Commission in October 2008 for permission to build the Glacier Hills Wind Park. The 17,350-acre park would have the capacity to generate up to 207 megawatts of power and include access roads, an underground system to collect power from the turbines and a new substation to connect to the existing transmission system.

The PSC estimates the project could cost between $335 million and $413 million.

Sponsored Links

Copyright © 2009 The Associated Press. All rights reserved. The information contained in the AP News report may not be published, broadcast, rewritten, or redistributed without the prior written authority of The Associated Press.