Rubicon Minerals provides initial results of 38,000-metre infil drilling program

theflyonthewall.com

Rubicon plans to complete 38,000 metres of infill drilling in 2014. The main purpose is to convert inferred mineral resource ounces to the drill indicated category. The area being concentrated on lies between surface and the 610 metre level. This drill program is being carried out on 25 metre spaced holes over the entire length of the F2 deposit. Many of these holes will be located at the extremities of the deposit, or in areas within the deposit that are presently believed to be outside the current mineral resource. Rubicon completed a total of 39 holes for 7,047 metres of drilling from this program as of May 31.

View Comments (0)