Lydian Drilling Intersects 98 Meters at 1.9 g/t Gold Below Current Pit-Shell at Erato and 60 Meters at 1.4 g/t Gold 80 Meters Outside the Pit Shell at Arshak

Marketwired
Lydian Drilling Intersects 98 Meters at 1.9 g/t Gold Below Current Pit-Shell at Erato and 60 Meters at 1.4 g/t Gold 80 Meters Outside the Pit Shell at Arshak
Lydian International Ltd. Logo
View Comments (0)