Edited Transcript of EDR.TO earnings conference call or presentation 6-May-19 5:00pm GMT

Q1 2019 Endeavour Silver Corp Earnings Call

VANCOUVER May 14, 2019 (Thomson StreetEvents) -- Edited Transcript of Endeavour Silver Corp earnings conference call or presentation Monday, May 6, 2019 at 5:00:00pm GMT

TEXT version of Transcript

================================================================================

Corporate Participants

================================================================================

* Bradford James Cooke

Endeavour Silver Corp. - CEO & Director

* Daniel W. Dickson

Endeavour Silver Corp. - CFO

* Galina Meleger

Endeavour Silver Corp. - Director of IR

* Godfrey J. Walton

Endeavour Silver Corp. - President & COO

================================================================================

Conference Call Participants

================================================================================

* Chris Thompson

PI Financial Corp., Research Division - Head of Mining Research

* Joseph George Reagor

Roth Capital Partners, LLC, Research Division - MD & Senior Research Analyst

* Mark La France Reichman

NOBLE Capital Markets, Inc., Research Division - Senior Natural Resource Analyst

* Tyler Roger Bisset

H.C. Wainwright & Co, LLC, Research Division - Research Analyst

================================================================================

Presentation

--------------------------------------------------------------------------------

Operator [1]

--------------------------------------------------------------------------------

Thank you for standing by. This is the conference operator. Welcome to the Endeavour Silver first quarter financial conference call. (Operator Instructions)

I would now like to turn the conference over to Galina Meleger, Director of Investor Relations. Please go ahead.

--------------------------------------------------------------------------------

Galina Meleger, Endeavour Silver Corp. - Director of IR [2]

--------------------------------------------------------------------------------

Thank you, operator. Good morning, everyone, and welcome to the Endeavour Silver Corp. 2019 First Quarter Financial Results Conference Call.

With me on the line today, we have the company's CEO, Bradford Cooke; as well as our President and Chief Operating Officer, Godfrey Walton; and our Chief Financial Officer, Dan Dickson.

Before we get started, I'm required to remind you that certain statements on this call will contain forward-looking information within the meaning of applicable securities laws. These may include statements regarding Endeavour's anticipated performance in 2019 and future years, including revenue and cost forecasts, silver and gold production, grades and recoveries and the timing and expenditures required to develop new silver mines in mineralized zones. We do not intend to and do not assume any obligation to update such forward-looking information other than as required by applicable law.

With that and on behalf of Endeavour Silver, I'd like to thank you again for joining our call today. And I'll now turn it over to our CEO, Bradford Cooke.

--------------------------------------------------------------------------------

Bradford James Cooke, Endeavour Silver Corp. - CEO & Director [3]

--------------------------------------------------------------------------------

Thanks, Galina, and welcome everyone to this first quarter financial results conference call on Endeavour Silver. As you have already seen, we had a pretty tough quarter in Q1 2019. We got a very slow start to the year in our operations and that has really impacted our financial performance for Q1.

Bolañitos and El Cubo, 2 of our mines, continued to be profitable in the quarter, but Guanaceví, our first mine, continued to struggle and incurred almost half of the net loss incurred during the quarter. We have initiated additional detailed reviews of the mine plan alternatives for Guanaceví, including ways to improve the viability of mining in the main Santa Cruz ore body. And accelerating the development of the 2 new orebodies that Milache and Santa Cruz Sur, but clearly, we need to do more than that. So management has actually implemented multiple measures to improve our operating and financial performance. We've basically initiated cost cuts across the entire range of the company's activities. And so we're dealing with the tough hand that we dealt ourselves in Q1, and I'm confident that we'll get through it.

So the highlights from the first quarter financially were a significant drop in net earnings to a $13 million loss, cash flow from operations dropped to around $2 million, mine operating cash flow was around $4.5 million and revenue decreased to $29 million. That was on the back of lower silver -- gold and silver equivalent production, respectively, 1.07 million ounces of silver, 10,000 ounces of gold for 1.9 million ounces of silver equivalents.

With regard to what we're doing about the poor performance in the first quarter, we are focused clearly on accelerating the development at each mine site, so we can gain access to more reserves and accelerate our production rates to get back on plan as soon as possible. And in addition to that, we're evaluating how to mine higher grades and reduce dilution and also are doing various studies to improve metal recoveries.

Management changes have already been implemented at Guanaceví and Bolañitos to address some systemic issues, and we expect to improve supervision of the day-to-day operations going forward in order to achieve our planned development and production targets.

In order to boost mine development, we need better equipment utilization and better contractor performance. So some mining equipment has already been relocated from low-priority areas to high-priority areas, some mining equipment -- new mining equipment has already been delivered to one of the sites, and we've already made changes to some mining contractors and are considering other changes. We believe the longer term solution on equipment though is to order a new fleet, and we're going to our Board meeting tomorrow with the proposal to lease a fleet of equipment for delivery in the second half. That would -- should significantly reduce maintenance costs, dramatically improve availabilities, and therefore, enhance productivity.

We have hired new senior mine planning engineer to review and reduce certain mine plans and there is a new senior mine geological consultant who is with us now reviewing and improving grade control moving from mine to mine.

We've already done some reductions in terms of employees and contractors in Q1, and additional reductions are underway in Q2. We just felt we had too many people not doing enough work and that one of the ways to reduce cost and boost productivity was to keep the best performers and reduce our workforce accordingly.

Exploration has pretty much ceased its brownfields and greenfields exploration, is now working on assisting our mine exploration group with mine-site infill drilling to again boost areas of reserves for better production this year.

Senior management has taken a leadership position at all of this, having already taken voluntary reductions in pay, our Vancouver administrative staff have followed in the same way. And we've reduced and are continuing to reduce all discretionary spending short term.

Last but not least, these studies underway to evaluate Guanaceví, which is by far the most important factor in our loss in Q1, we should have those studies done by month end, so we expect to make additional changes [in June.]

Notwithstanding all that, we continue our top priority on safety performance. And in general, we had a good safety performance in Q1, and management's also clearly focused on our next mine at Terronera, mow that El Compas has declared commercial production in Q1. We're focused on arranging the financing and optimizing the prefeasibility study while we await receipt of the final government permit, which we believe to be day to day and Board approval to commence construction.

Last but not least, our Parral project represents the potential to become mine #6, and a preliminary economic assessment is already underway based on last year's resources and mine permitting is underway given that Parral was historically a mine up until 1990 and there is minimal disturbance needed to recommence production at the Veta Colorada mine.

So in summary, we recognize that we underperformed in Q1 and every big problem can be broken down into multiple small problems. We've identified all the small problems, we've been tackling the small problems, and we are already starting to tick off accomplishments as we move to resolve our operating and financial performance in Q1.

So with that, I'd like to open the call up for questions.

================================================================================

Questions and Answers

--------------------------------------------------------------------------------

Operator [1]

--------------------------------------------------------------------------------

(Operator Instructions) Our first question comes from Joseph Reagor of Roth Capital Partners.

--------------------------------------------------------------------------------

Joseph George Reagor, Roth Capital Partners, LLC, Research Division - MD & Senior Research Analyst [2]

--------------------------------------------------------------------------------

Couple of things, I guess, quick off the top, on the G&A front with the reductions in Vancouver and thinking about that over the remainder of the year, what should we expect for G&A? And should there be any like onetime items like there was the $1.1 million in Q1, should we expect anything like that in Q2?

--------------------------------------------------------------------------------

Daniel W. Dickson, Endeavour Silver Corp. - CFO [3]

--------------------------------------------------------------------------------

Thanks, Joseph. Dan Dickson, CFO. Yes, the reductions that we're seeing out of -- in Vancouver and management, which effectively are G&A costs, the voluntary pay cuts across the executive level, that amounts to just under $500,000 in a year, obviously not a huge impact, but same time, it sends a message that we're in this with the rest of our employees. Secondly, discretionary spending, Investor Relations, travel for the group, et cetera, et cetera, that will all reduce, exact numbers, still again probably under $500,000 on an annualized basis, but at the same time, it's a message that we send.

With regards to severance, you're correct, we have $1.1 million of severance flow-through that relate to El Cubo where we reduced our staff from about 160 employees. We actually have a reduction of staff going through at Guanaceví here in Q2 with an expected cost of about $0.8 million in the second quarter that will flow through. At that point, we should be done for a little bit of it unless we announce something later in the year, but at this point, there will be no changes at this time. So right now, from a G&A standpoint, for the end of the year, total amount we expect to be about $6 million cash outflow, so anywhere between $5.5 million to $6 million. Q1 was almost upwards of $3 million, inside that G&A was stock-based compensation. We granted options in March to clean the path, so we've done that in May.

--------------------------------------------------------------------------------

Joseph George Reagor, Roth Capital Partners, LLC, Research Division - MD & Senior Research Analyst [4]

--------------------------------------------------------------------------------

Okay. Shifting gears a little bit to the exploration front. The press release seems to suggest that like some of your brownfield exploration and greenfield exploration in Peru may be going away or at least being delayed, but then the guidance on exploration, the total number spent for the year didn't change. How should we look at that? Like, are you saying that it hasn't changed yet and it may go down? Or is it more of that's going to be back half weighted?

--------------------------------------------------------------------------------

Bradford James Cooke, Endeavour Silver Corp. - CEO & Director [5]

--------------------------------------------------------------------------------

Thanks, Joe. It's Brad. So obviously we needed to cut exploration. We spent over $2 million on exploration in Q1, and it's the easiest cut to make. It's also discretionary, we can bring it back on when we feel more comfortable with the cash flows. So what do we cut? Obviously mine-site infill drilling was not cut -- for that's basically critical for defining and gaining access to reserves to boost this year's production. But brownfields and greenfields exploration around Guanaceví, around Bolañitos, El Compas and El Cubo, these are all candidates for reductions immediately and those reductions have been made. Chile is not scheduled for exploration until the last quarter. Sorry, the drilling in Chile was scheduled for the last quarter, and we'll obviously be making a decision about that later on in the summer time. So the main hit on exploration is just the greenfields and brownfields in Mexico at this time.

--------------------------------------------------------------------------------

Joseph George Reagor, Roth Capital Partners, LLC, Research Division - MD & Senior Research Analyst [6]

--------------------------------------------------------------------------------

Okay. And then one final one. Does the Q1 results impact any your planned financing for Terronera, assuming it gets the permit and approved by the Board? Has it made any changes? Are you guys using the same plan that you were a quarter ago?

--------------------------------------------------------------------------------

Bradford James Cooke, Endeavour Silver Corp. - CEO & Director [7]

--------------------------------------------------------------------------------

No. I think, it's steady as she goes. As you know, our focus is mainly on the debt side. And we're reasonably confident we can finish of those financing arrangements here in the not-too-distant future.

--------------------------------------------------------------------------------

Operator [8]

--------------------------------------------------------------------------------

Our next question comes from Chris Thompson of PI Financial.

--------------------------------------------------------------------------------

Chris Thompson, PI Financial Corp., Research Division - Head of Mining Research [9]

--------------------------------------------------------------------------------

Just a quick question, I guess, on Guanaceví. My understanding is that you're producing from Milache right now but you're ramping up there, you want to position, I guess, Santa Cruz Sur for production second half of this year and then obviously, you want to dial back the mine plan which is exploiting resources from existing other areas. I'm trying to understand exactly what is happening at Guanaceví? Are we having problems with executing that plan? Or is this -- are these issues concerning exploitation of -- was it Porvenir Norte and Santa Cruz?

--------------------------------------------------------------------------------

Godfrey J. Walton, Endeavour Silver Corp. - President & COO [10]

--------------------------------------------------------------------------------

Chris, it's Godfrey. Thanks for the question. It really comes down to not having the development go at the speed that it was planned. And so the areas that we were meant to be mining today are not the areas that we ended up mining, and therefore, the grades were lower than expected. So we've over the last, let's say, month, we've been pushing on development and it is increasing. As Brad mentioned, we acquired a couple of pieces of equipment and they were actually 2 jumbos that arrived in April, and they are making a difference to our development. So the development is picking up, it'll get us back on track as to where we should be mining and that will increase the production from Milache. We're evaluating what's happening at the bottom of Santa Cruz to see how far we can continue with that. And then we're pushing development at Santa Cruz Sur, which should have been producing by now, but it is again behind on development. And so by the end of the year, I think, we'll be a lot better positioned to produce as planned.

--------------------------------------------------------------------------------

Chris Thompson, PI Financial Corp., Research Division - Head of Mining Research [11]

--------------------------------------------------------------------------------

Great, Godfrey. I mean, obviously you guys are reviewing your plans at the moment. I mean, at what point would you consider suspending production from Guanaceví? If -- just to give you a little bit of a breathing room, I guess, to fully sort of adjust the operating pattern before executing on it. Is that something you would consider?

--------------------------------------------------------------------------------

Godfrey J. Walton, Endeavour Silver Corp. - President & COO [12]

--------------------------------------------------------------------------------

It's -- all things are being considered at this point. And as Brad mentioned, we expect to have those studies completed by the end of this month, and then we'll be making decisions -- further decisions on actions at Guanaceví.

--------------------------------------------------------------------------------

Chris Thompson, PI Financial Corp., Research Division - Head of Mining Research [13]

--------------------------------------------------------------------------------

Okay. And then the final question, I'll just slip it in. El Compas right now, is that free cash flow positive at the moment?

--------------------------------------------------------------------------------

Daniel W. Dickson, Endeavour Silver Corp. - CFO [14]

--------------------------------------------------------------------------------

We've seen grades come up there, Chris. We changed out the contractor at the end of the quarter, actually mid-March, and we've seen grades come up above 4 grams. In the plan, it's about 6 grams of [gold goal] per tonne. We've seen that come up in the 4, 4.5 range. And if we can stay at that 4, we should be at least cash flow neutral in Q2 and expect that to go to cash flow positive in second half of the year.

--------------------------------------------------------------------------------

Bradford James Cooke, Endeavour Silver Corp. - CEO & Director [15]

--------------------------------------------------------------------------------

And Chris, this is Brad. Just to put that in context, Compas is the only mine where we plan to use contractors, only contractors for the

(technical difficulty)

on dilution, almost 100% dilution. So with the new contractor, with new supervisors, with the consulting or control geologist, we are already seeing improvement in grades and a reduction of dilution, there is more coming. But I think what we're seeing week-to-week right now is sufficient to be breakeven, and we obviously want to do better.

--------------------------------------------------------------------------------

Operator [16]

--------------------------------------------------------------------------------

Our next question comes from Heiko Ihle of H.C. Wainwright.

--------------------------------------------------------------------------------

Tyler Roger Bisset, H.C. Wainwright & Co, LLC, Research Division - Research Analyst [17]

--------------------------------------------------------------------------------

This is Tyler Bisset calling in for Heiko. Just wanted to first say that we appreciate the cohesive nature in which everyone in the organization from the top on down seems to cope with the voluntary pay cuts together. But you stated in your release that you guys are working on debt financing for Terronera. What sort of terms are you seeing there? And can you provide some color if original plans to fund the mine remain intact? Or has anything in regards to timing or funding sources changed?

--------------------------------------------------------------------------------

Daniel W. Dickson, Endeavour Silver Corp. - CFO [18]

--------------------------------------------------------------------------------

Yes. Thanks, Tyler. Yes, we're still looking at -- I won't get into the details of terms, it's not fair with the counterparties that we're working with. But the terms are fair, it's just how much we can get to fund for Terronera, and we've been out there publicly and said basically, we're looking kind of, if it's a $100 million bill, the 60-40 split or almost a 50-50 split. And there's funds available for that, it just depends on how much we secure -- need to secure and obviously the terms of that. We've seen everything from 6% up to the predatory pricing of 20%. So obviously we are not going to move with some of that predatory pricing in the debt world, and that's fine, but we think we can get it done at a reasonable rate. It's just taking a little bit more time and the key thing for that is that permit. Obviously, guys from a credit standpoint aren't going to be able to lend until we had that permit in hand and that makes sense, but we're fully confident we can get that done here in the next couple months.

--------------------------------------------------------------------------------

Tyler Roger Bisset, H.C. Wainwright & Co, LLC, Research Division - Research Analyst [19]

--------------------------------------------------------------------------------

Perfect. I think, you may have touched on this briefly, but just for clarification, you mentioned severance costs as one of the reasons for the higher all-in sustaining costs. Though in the financials, it appears to just be $1.1 million. So are we missing something there or is that the full figure? And can you estimate incremental expenses during the remainder of the year?

--------------------------------------------------------------------------------

Daniel W. Dickson, Endeavour Silver Corp. - CFO [20]

--------------------------------------------------------------------------------

Yes. The $1.1 million severance cost at Cubo actually is not in our all-in sustaining costs. We don't put it in our production cost because it was a reduction of our operations. So Cubo went from 15,000 tonnes down to just over 1,000 tonnes per day in Q1, and our plan was to get down to 750 tonnes per day. So that's the reason why that $1.1 million hasn't gone into our cost profile. We see it more as an administration expense. Secondly, going forward, we do have layoffs happening here at Guanaceví, as Brad touched on, that's going to be another $0.8 million, that we'll see flow through in Q2. Another incremental cost going forward with reductions until we announce larger layoffs, which isn't expected, but again, we're looking at Guanaceví -- all the alternatives at Guanaceví back at out things, that could add things but there's nothing more to add at this time.

--------------------------------------------------------------------------------

Bradford James Cooke, Endeavour Silver Corp. - CEO & Director [21]

--------------------------------------------------------------------------------

And it's Brad here. Dan, can you also comment on the impact of inventories on our Q1 financials because we really didn't focus on that in the news release?

--------------------------------------------------------------------------------

Daniel W. Dickson, Endeavour Silver Corp. - CFO [22]

--------------------------------------------------------------------------------

Yes. We had write-downs. We had NRVs of inventories that flew through our financial statements, so we built stockpiles at Compas during our precommercial production stage. And we had about $1 million for the NRVs related to Compas. So were if -- if everybody recalls, we were down for 6 weeks due to a trunnion failure at the plant, and we're effectively ready to go for precommercial production. Those costs which is amounts to $0.4 million is also running through the -- our operating expenditures as well. Other than that, in all-in sustaining costs, to answer Tyler's question, Guanaceví just an inability to get up through the tonnes is actually driving that those high all-in sustaining costs. G&A was a little bit higher because again we had stock-based comp in Q1 compared to the previous year. All in all though, with the NRVs through the inventories that would be a small impact, $1 million and a bit going through.

--------------------------------------------------------------------------------

Operator [23]

--------------------------------------------------------------------------------

(Operator Instructions) Our next question comes from Mark Reichman of NOBLE Capital Markets.

--------------------------------------------------------------------------------

Mark La France Reichman, NOBLE Capital Markets, Inc., Research Division - Senior Natural Resource Analyst [24]

--------------------------------------------------------------------------------

Just 3 areas that I just wanted to just focus on. The first would be Bolañitos and the arsenic concentration, and addressing kind of your confidence in moving to a mine plan that accesses the lower arsenic ore because as I understood in the first quarter, you are basically having to blend with lower arsenic ore to be able to market. So that's one area. And I guess, that's probably Godfrey's question. The second would be, if Dan could just kind of step back and provide kind of a high-level view of the company's liquidity against anticipated cash flow generation and the funding of capital expenditures? And then the third area would be for Brad, and that's just to address the government permitting process for Terronera.

--------------------------------------------------------------------------------

Godfrey J. Walton, Endeavour Silver Corp. - President & COO [25]

--------------------------------------------------------------------------------

Mark, this is Godfrey. To look at the arsenic, yes, we did have a issue in Q1 and it flowed a bit in Q2. And so we have been blending the arsenic concentrate from Bolañitos with Cubo, which has helped significantly to bring the average arsenic content down below 1%, which is what our buyers are interested in having it below 1%. We've also been working on using depressors, we've actually identified that the arsenic is coming from arseniopyrite. And so we're about halfway through a test to use depressors to depress the arseniopyrite and it's working quite affectively. We expect that to be a solution to the arsenic problem. We're also doing a lot of drilling to identify where the levels of arsenic are high and low and so that we can continue blending internally within Bolañitos and not requiring the concentrate from Cubo. So we expect to have that solved in Q2. And I think, we're actually quite close, we are going to try a number of other depressors for the arseniopyrite, which may be more effective and so that'll be ongoing in Q2 here.

--------------------------------------------------------------------------------

Daniel W. Dickson, Endeavour Silver Corp. - CFO [26]

--------------------------------------------------------------------------------

Mark, on your second question kind of the high-level impact on liquidity of some of these plans going forward, and it clearly, we went to take in pay reductions if we didn't see cash go from $33 million down to $22 million in 3 months. And part of that $11 million decrease was $4.5 million of working capital changes, so basically payables going out the door, receivables building. And part of the arsenic issue impacted the level of inventories that we held at the end of the quarter and timing of payments on some of our receivables that boosted our receivables again impacting cash, but if you even separate that just losing $7 million or $6 million of cash in the quarter clearly, made management jump and move and cutting back exploration for the year, we think we'll be in a decent enough position to stay liquid. Obviously, we have $22 million cash, no debt on the balance sheet. We have room to maneuver, but we didn't want to wait too long.

Some of the things that we're looking at comes down to Guanaceví and the alternative plants that we'll get at the end of the month and into June. Clearly, we can't sustain $5 million of negative free cash flow from Guanaceví, and we think we have a plan getting into Milache and getting into Santa Cruz Sur. Milache has got significant better grades and Santa Cruz Sur has significantly wider veins. If we can do that and execute that plan here over the next 3, 6 months, we'll be fine.

Exploration taking a step back, obviously is a way to preserve cash. There are some projects that we would love to spend exploration dollars on that we think are exciting projects, so that it could be the future of Endeavor, but it's just timing of those cash flows, and we'll manage our balance sheet on that timing of the cash flows here over the next 6 to 8 months. And hopefully, we get some -- a little bit more positive news in the silver price, but clearly, silver has been fairly stagnant, and if not a little bit depressed here sitting under $15. And it's something that we get paid to manage. It's our job to manage that, when it comes to buying more equipment to improve productivity at Guanaceví and Bolañitos, we're doing that through a leasing structure. So it's not cash going out the door immediately, it's going to be cash over time. We think the maintenance cost that we can save at Guanaceví and Bolañitos for some of these new equipment will basically offset the lease payments is what we're showing. So hopefully that's a positive going forward, and we don't have to make more changes.

--------------------------------------------------------------------------------

Bradford James Cooke, Endeavour Silver Corp. - CEO & Director [27]

--------------------------------------------------------------------------------

Mark, thanks for your questions. So with regard to Terronera permits, if everybody recalls, we've been several years now in the permitting process. We did receive the environmental impact study approval well over a year ago. We waited much of last year to get the water authorities approval to use a certain creek for the storage of our tailings. We got that around Christmas time. And since that time, we've been waiting for the main environmental authority to give us the green light for using that creek for the storage of our tailings. How does that occur? What is the process there? We're waiting day to day for the receipt of a notice of request for payment for that permit to use the creek for tailings. And we believe that is very short term. After that, it's about a 2- or 3-week process for us to actually make a payment and have it notarized, so that it's accepted by the environmental authority and then get the permit. So we still believe we're going to have this permit this quarter, and that will give us everything we need from the permitting point of view.

--------------------------------------------------------------------------------

Operator [28]

--------------------------------------------------------------------------------

This concludes the question-and-answer session. I would like to turn the conference back over to Mr. Cooke for any closing remarks.

--------------------------------------------------------------------------------

Bradford James Cooke, Endeavour Silver Corp. - CEO & Director [29]

--------------------------------------------------------------------------------

Well, thank you, operator, and thanks all for listening in today. I talked about breaking a big problem down into a number of small problems and then slowly, but surely resolving them. I just like to highlight that in the last month, we're in the middle of ticking off a great improvement at El Compas. We're in the middle of ticking off the arsenic issue at Bolañitos, we've ticked off contractor underperformance at El Compas, and we're in the process of doing it at Guanaceví, layoffs obviously across the board were possible. So -- all those actions have already been taken.

And I think, we're also very fortunate now that we're one of the very few silver mining companies to have a portfolio of projects that we are proposing to build into new mines and drive organic growth. This transition from optimizing old mines to building new mines is bad timing this year given the states of the silver price, and so that's really what Dan was talking about with regard to cash flows. We just have to make sure that we manage our balance sheet appropriately as we make this transition from optimizing old mines to building new mines.

So we're cautiously encouraged by the changes that are underway, and I think, if we just keep our heads down and do what we've done before, we'll get through this tough period. Thanks all for listening.

--------------------------------------------------------------------------------

Operator [30]

--------------------------------------------------------------------------------

This concludes today's conference call. You may disconnect your lines. Thank you for participating, and have a pleasant day.