Advertisement
U.S. markets open in 1 hour 24 minutes
  • S&P Futures

    5,305.75
    -2.50 (-0.05%)
     
  • Dow Futures

    40,144.00
    0.00 (0.00%)
     
  • Nasdaq Futures

    18,490.75
    -13.00 (-0.07%)
     
  • Russell 2000 Futures

    2,141.60
    +3.20 (+0.15%)
     
  • Crude Oil

    82.41
    +1.06 (+1.30%)
     
  • Gold

    2,231.20
    +18.50 (+0.84%)
     
  • Silver

    24.68
    -0.07 (-0.29%)
     
  • EUR/USD

    1.0789
    -0.0041 (-0.38%)
     
  • 10-Yr Bond

    4.1960
    0.0000 (0.00%)
     
  • Vix

    13.03
    +0.25 (+1.95%)
     
  • GBP/USD

    1.2616
    -0.0022 (-0.17%)
     
  • USD/JPY

    151.3410
    +0.0950 (+0.06%)
     
  • Bitcoin USD

    70,747.01
    +444.11 (+0.63%)
     
  • CMC Crypto 200

    885.54
    0.00 (0.00%)
     
  • FTSE 100

    7,952.37
    +20.39 (+0.26%)
     
  • Nikkei 225

    40,168.07
    -594.66 (-1.46%)
     

School of Mines cuts ribbon on downtown building

South Dakota School of Mines and Technology cuts ribbon on downtown Rapid City campus building

RAPID CITY, S.D. (AP) -- The South Dakota School of Mines and Technology is cutting the ribbon Friday on its new downtown campus building in Rapid City.

The 18,000-square-foot building is housing the university's industrial engineering department and a four-room conference center for community use.

The industrial engineering program and its nearly 150 students have operated out of the top two floors of the building for the past year while renovations continued on the main floor and basement.

The university is expanding into downtown is two-fold to connect with Rapid City's economic development plans and expand its campus to accommodate growth.

Advertisement