U.S. Markets close in 5 hrs 12 mins

Altamira Gold Corp. (ALTA.V)

TSXV - TSXV Delayed Price. Currency in CAD
Add to watchlist
0.1150-0.0100 (-8.00%)
As of 10:05AM EDT. Market open.
Full screen
Gain actionable insight from technical analysis on financial instruments, to help optimize your trading strategies
Chart Events
Neutralpattern detected
Previous Close0.1250
Open0.1200
Bid0.1100 x 0
Ask0.1150 x 0
Day's Range0.1150 - 0.1200
52 Week Range0.0400 - 0.1500
Volume46,500
Avg. Volume274,179
Market Cap11.385M
Beta (5Y Monthly)1.59
PE Ratio (TTM)N/A
EPS (TTM)-0.0190
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • Altamira Discovers Multiple New Mineralized Structures at the Cajueiro Gold Project, Brazil
    Newsfile

    Altamira Discovers Multiple New Mineralized Structures at the Cajueiro Gold Project, Brazil

    Vancouver, British Columbia--(Newsfile Corp. - July 29, 2020) -  Altamira Gold Corp.'s (TSXV: ALTA) (FSE: T6UP) (OTC Pink: EQTRF), ("Altamira" or the "Company") is pleased to announce the discovery of several new mineralized structures at the Cajueiro gold project in Brazil resulting from a recently completed trenching program originally designed for the collection of bulk samples of oxidised material for metallurgical testwork.Highlights:As part of the engineering and design work for the construction of the ...

  • Second Trial Mining License Approved for Altamira Gold at the Cajueiro Gold Project, Brazil
    Newsfile

    Second Trial Mining License Approved for Altamira Gold at the Cajueiro Gold Project, Brazil

    Vancouver, British Columbia--(Newsfile Corp. - July 15, 2020) - Altamira Gold Corp.'s (TSXV: ALTA) (FSE: T6UP) (OTC Pink: EQTRF) ("Altamira" or the "Company") is pleased to announce that the second Trial Mining License within the claim block 866070/2004 has been approved for its advanced Cajueiro Gold Project in northern Mato Grosso State in western Brazil.Highlights:As recently announced, permits are in place for the construction of a 1000t/d processing plant at the Cajueiro gold project ...

  • Altamira Gold Secures Electrical Power Supply for 1,000t/d Processing Plant at the Cajueiro Gold Project, Brazil
    Newsfile

    Altamira Gold Secures Electrical Power Supply for 1,000t/d Processing Plant at the Cajueiro Gold Project, Brazil

    Vancouver, British Columbia--(Newsfile Corp. - July 2, 2020) - Altamira Gold Corp.'s (TSXV: ALTA) (FSE: T6UP) (OTC Pink: EQTRF), ("Altamira" or the "Company") is pleased to announce that it has received notice from Centrais Eletricas do Para ("CELPA"), the electrical power supplier in the state of Para and a division of Grupo Equatorial Energia, approving Altamira's recent application to draw power from the existing transmission line which runs through the Central resource area ...