F.V - Fiore Gold Ltd.

TSXV - TSXV Delayed Price. Currency in CAD
0.5300
-0.0300 (-5.36%)
At close: 3:57PM EST
Stock chart is not supported by your current browser
Previous Close0.5600
Open0.5600
Bid0.5300 x N/A
Ask0.5500 x N/A
Day's Range0.5300 - 0.5600
52 Week Range0.2550 - 0.6300
Volume157,438
Avg. Volume118,032
Market Cap51.79M
Beta (5Y Monthly)-0.26
PE Ratio (TTM)26.50
EPS (TTM)0.0200
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target Est0.81
  • ACCESSWIRE

    Fiore Gold Reports Q1 2020 Production and Provides FY2020 Guidance

    The Company is also providing full-year production guidance for fiscal year 2020. Gold production in the first two months of Q1 were below plan as the operating team worked to optimize crusher throughput and fine-tune the reagent mix and operating procedures.

  • Is Fiore Gold Ltd.'s (CVE:F) P/E Ratio Really That Good?
    Simply Wall St.

    Is Fiore Gold Ltd.'s (CVE:F) P/E Ratio Really That Good?

    This article is written for those who want to get better at using price to earnings ratios (P/E ratios). We'll apply a...

  • ACCESSWIRE

    Fiore Gold Announces Full Year 2019 Results

    VANCOUVER, BC / ACCESSWIRE / January 24, 2020 FIORE GOLD LTD. (TSXV:F)(OTCQB:FIOGF) ("Fiore" or the "Company") is pleased to announce that its financial statements and management's ...

  • ACCESSWIRE

    Fiore Gold Ltd. Intersects New Oxide Gold Mineralization at Its Pan Mine, Including 35.1 Metres of 0.64 g/t Gold And 38.1 Metres of 0.79 g/t Gold

    VANCOUVER, BC / ACCESSWIRE / December 10, 2019 / FIORE GOLD LTD. (TSXV:F)(OTCQB:FIOGF) ("Fiore" or the "Company") is pleased to announce the first results from the 2019 drill program ...

  • Did Fiore Gold's (CVE:F) Share Price Deserve to Gain 33%?
    Simply Wall St.

    Did Fiore Gold's (CVE:F) Share Price Deserve to Gain 33%?

    The simplest way to invest in stocks is to buy exchange traded funds. But one can do better than that by picking...

  • ACCESSWIRE

    Fiore Drills 16.8 m of 1.61 g/t and 25.9 m of 0.92 g/t Gold at its Gold Rock Project in Nevada

    VANCOUVER, BC / ACCESSWIRE / October 23, 2019 / FIORE GOLD LTD. (TSXV:F)(FIOGF) ("Fiore" or the "Company") is pleased to report additional drilling results from its Gold Rock project in Nevada. Tim Warman, Fiore's CEO stated, "These holes represent the last of the RC holes from the 2019 drilling program at Gold Rock, with the results showing strong, consistent mineralization over approximately 2.4 km of strike length.

  • ACCESSWIRE

    Fiore Gold Meets Full Year 2019 Production Guidance

    VANCOUVER, BC / ACCESSWIRE / October 17, 2019 / FIORE GOLD LTD. (TSXV:F.V) (FIOGF) ("Fiore" or the "Company") is pleased to announce preliminary production results for the Company's fourth fiscal quarter ("Q4") and the full fiscal year 2019 which ended September 30th, 2019 for its Pan open pit mine in White Pine County, Nevada. Q4 gold production was 9,282 ounces.

  • ACCESSWIRE

    Fiore Drills 24.4 m of 0.96 g/t Gold at its Gold Rock Project in Nevada

    VANCOUVER, BC / ACCESSWIRE / September 10, 2019 / FIORE GOLD LTD. (TSXV:F) (OTCQB:FIOGF) (“Fiore” or the “Company”) is pleased to report additional drilling results from its Gold Rock project in Nevada. ...

  • ACCESSWIRE

    Fiore Gold Issues Statement Regarding Recent Events Concerning Its OTC Markets Profile

    VANCOUVER, BC / ACCESSWIRE / August 30, 2019 / FIORE GOLD LTD. (TSXV:F)(FIOGF) (“Fiore” or the “Company”) is aware that the OTC Markets Group, Inc. (“OTC Markets”) has updated Fiore’s profile page with a Stock Promotion flag. Following notice of the updated profile, the OTC Markets supplied the Company with examples of articles purportedly published by the National Inflation Association (“NIA”). Fiore encourages those interested in Fiore to rely solely on information included in its press releases combined with its filings and disclosures made with Canadian securities authorities on SEDAR (www.sedar.com).

  • Can Fiore Gold Ltd. (CVE:F) Improve Its Returns?
    Simply Wall St.

    Can Fiore Gold Ltd. (CVE:F) Improve Its Returns?

    One of the best investments we can make is in our own knowledge and skill set. With that in mind, this article will...

  • ACCESSWIRE

    Fiore Gold Delivers Back to Back Quarters of Record Gold Production and Improving Liquidity

    VANCOUVER, BC / ACCESSWIRE / August 28, 2019 / FIORE GOLD LTD. (TSXV:F) (FIOGF) (“Fiore” or the “Company”) is pleased to announce that its financial statements and management’s discussion and analysis for the third fiscal quarter (“Q3 2019”) ended June 30, 2019, have been filed with the securities regulatory authorities and are available at www.sedar.com and on the Company’s website at www.fioregold.com.

  • ACCESSWIRE

    Fiore Drills 27.4 m of 1.46 g/t Gold at its Gold Rock Project in Nevada

    VANCOUVER, BC / ACCESSWIRE / August 12, 2019 / FIORE GOLD LTD. (TSXV:F)(FIOGF) (“Fiore” or the “Company”) is pleased to report that drilling at its Gold Rock project in Nevada has intersected thick intervals of oxide gold mineralization both within and outside of the current resource pit shells. Gold Rock, which is located approximately 8 miles (13 km) southeast of Fiore’s Pan Mine, is one of the only federally-permitted development projects in Nevada, having received its Record of Decision (“ROD”) in late 2018 from the United States Bureau of Land Management (“BLM”) for the construction of a mine, process facilities and other infrastructure.

  • ACCESSWIRE

    Fiore Gold Ltd. Reports Record Quarterly Gold Production at its Pan Mine, Nevada

    VANCOUVER, BC / ACCESSWIRE / July 16, 2019 / FIORE GOLD LTD. (TSXV:F.V) (FIOGF) (“Fiore” or the “Company”) is pleased to announce preliminary production results for the Company’s third fiscal quarter (“Q3”) ended June 30th, 2019 for its Pan open pit mine in White Pine County, Nevada. This was also the final quarter for Pan as a run-of-mine operation as the new primary crushing circuit comes online.

  • ACCESSWIRE

    Fiore Gold Ltd. Reports Commissioning of the Primary Crushing Circuit at Its Pan Mine, Nevada

    VANCOUVER, BC / ACCESSWIRE / June 28, 2019 / FIORE GOLD LTD. (TSXV:F.V) (FIOGF) ("Fiore" or the "Company") is pleased to announce that commissioning of the primary crushing circuit at its 100% owned Pan Mine in Nevada has commenced, with all equipment installed and operational and the first ore put through the circuit on June 25th, 2019. Tim Warman, Fiore's CEO commented, "The team at our Pan Mine has done a great job with the design and installation of the primary crushing circuit, and it's great to see the first ore running through the plant this week. Metallurgical testing has shown that primary crushing will increase both the overall gold recovery and the rate of gold recovery.

  • ACCESSWIRE

    Fiore Gold Begins Drilling Program at Gold Rock Project in Support of Preliminary Economic Assessment Targeted for Year-End 2019

    VANCOUVER, BC / ACCESSWIRE / June 19, 2019 / FIORE GOLD LTD. (TSX-V:F.V) (FIOGF) ("Fiore" or the "Company") is pleased to report that a 10,000 m (30,000 ft) drilling program has commenced at its Gold Rock project in Nevada in support of a Preliminary Economic Assessment ("PEA") targeted for year-end 2019. Gold Rock, which is located approximately 8 miles (13 km) southeast of Fiore's Pan Mine Figure 1, is one of the only federally-permitted development projects in Nevada, having received its Record of Decision ("ROD") in late 2018 from the United States Bureau of Land Management ("BLM") for the construction of a mine, process facilities and other infrastructure. The drilling program will be funded entirely from cash flow from the Company's nearby Pan Mine.

  • ACCESSWIRE

    Fiore Board Approves US$2 Million Drilling Program for Gold Rock Project, Preliminary Economic Assessment Targeted for Year-End 2019

    VANCOUVER, BC / ACCESSWIRE / May 29, 2019 / FIORE GOLD LTD. (TSXV:F.V) (FIOGF) ("Fiore" or the "Company") is pleased to announced that its Board of Directors has approved a US$2 million program of metallurgical test work and resource expansion drilling at its Gold Rock project in Nevada in support of a Preliminary Economic Assessment ("PEA") targeted for year-end 2019. Gold Rock, which is located approximately 8 miles (13 km) southeast of Fiore's Pan Mine (Figure 1), is one of the only federally-permitted development projects in Nevada, having received its Record of Decision ("ROD") in late 2018 from the United States Bureau of Land Management ("BLM") for the construction of a mine, process facilities and other infrastructure. Gold Rock currently hosts an Indicated resource of 238,700 gold ounces (9.0 million tonnes at 0.82 g/t gold) and an Inferred resource of 180,900 gold ounces (7.8 million tonnes at 0.72 g/t gold).

  • Volatility 101: Should Fiore Gold (CVE:F) Shares Have Dropped 43%?
    Simply Wall St.

    Volatility 101: Should Fiore Gold (CVE:F) Shares Have Dropped 43%?

    Investors can approximate the average market return by buying an index fund. While individual stocks can be big...

  • ACCESSWIRE

    Fiore Gold's Second Quarter Delivers 68% Increase in Operating Cash Flow over Prior Year Quarter

    VANCOUVER, BC / ACCESSWIRE / May 24, 2019 / FIORE GOLD LTD. (TSXV: F) (OTCQB: FIOGF) ("Fiore" or the "Company") is pleased to announce that its financial statements and management's ...

  • ACCESSWIRE

    Fiore Gold Ltd. Reports Record Quarterly Gold Production and Additions to the Mineral Reserves at Its Pan Mine, Nevada

    VANCOUVER, BC / ACCESSWIRE / April 9, 2019 / FIORE GOLD LTD. (TSXV:F.V) (FIOGF) ("Fiore" or the "Company") is pleased to announce preliminary production results for the Company's second fiscal quarter ("Q2") ended March 31st, 2018, as well as an updated reserve estimate for its Pan open pit mine in White Pine County, Nevada.

  • ACCESSWIRE

    Fiore Gold Ltd. Reports Progress on the Primary Crushing Circuit Installation at its Pan Mine, Nevada

    VANCOUVER, BC / ACCESSWIRE / April 1, 2019 / FIORE GOLD LTD. (TSXV:F.V) (FIOGF) ("Fiore" or the "Company") is pleased to provide an update on the installation of the primary crushing circuit at its 100% owned Pan Mine in Nevada. Electrical distribution and control components are expected on site by the end of April, with the power line connection completed by mid-May. The crusher is currently on schedule to be in operation by the end of Q2 of this year. Tim Warman, Fiore's CEO commented, "We're really pleased to see the primary crushing circuit coming together at site, with the project moving forward safely, on schedule and on budget.

  • ACCESSWIRE

    Fiore Gold Announces First Quarter 2019 Results

    VANCOUVER, BC / ACCESSWIRE / February 28, 2019 / FIORE GOLD LTD. (TSXV: F) (OTCQB: FIOGF) ("Fiore" or the "Company") is pleased to announce that its financial statements and management's ...

  • ACCESSWIRE

    Fiore Gold Ltd. Produces 9,765 Ounces of Gold in First Quarter of Fiscal 2019, Adding Primary Crushing Circuit to Increase Gold Recoveries at its Pan Mine, Nevada

    VANCOUVER, BC / ACCESSWIRE / February 25, 2019 / FIORE GOLD LTD. (TSXV:F.V) (FIOGF) ("Fiore" or the "Company") announces preliminary production results from its 100%-owned Pan Mine in Nevada for the Company's first fiscal quarter ("Q1") of 2019, which ended December 31st, 2018. As of December 31, 2018, the operation was at 957 consecutive days of attaining this Triple-Zero achievement. The Company also announces that it is proceeding with the installation of a primary crushing circuit at the Pan Mine.