U.S. markets closed

FLSmidth & Co. A/S (FLIDY)

Other OTC - Other OTC Delayed Price. Currency in USD
Add to watchlist
4.40000.0000 (0.00%)
At close: 1:06PM EDT
Full screen
Trade prices are not sourced from all markets
Gain actionable insight from technical analysis on financial instruments, to help optimize your trading strategies
Chart Events
Neutralpattern detected
Previous Close4.4000
Open4.4000
Bid0.0000 x 0
Ask0.0000 x 0
Day's Range4.4000 - 4.4000
52 Week Range2.6000 - 4.4700
Volume594
Avg. Volume238
Market Cap2.255B
Beta (5Y Monthly)1.43
PE Ratio (TTM)83.81
EPS (TTM)0.0525
Earnings DateN/A
Forward Dividend & Yield0.03 (0.72%)
Ex-Dividend DateMar 25, 2021
1y Target EstN/A
Fair Value is the appropriate price for the shares of a company, based on its earnings and growth rate also interpreted as when P/E Ratio = Growth Rate. Estimated return represents the projected annual return you might expect after purchasing shares in the company and holding them over the default time horizon of 5 years, based on the EPS growth rate that we have projected.
Fair Value
XX.XX
N/A
Research that delivers an independent perspective, consistent methodology and actionable insight
Related Research
View more
  • FLSmidth receives significant order for a range of key equipment for greenfield Chilean copper mine
    GlobeNewswire

    FLSmidth receives significant order for a range of key equipment for greenfield Chilean copper mine

    FLSmidth has been selected to supply the majority of the key mineral processing technologies for a major copper producer in the Atacama Region of Chile. The range of equipment and technologies includes the primary gyratory crusher, SAG mill, ball mill, traditional flotation cells, column cells, thickeners, cyclones and pumps. The flotation tailings and slimes thickeners will be designed to optimise the recovery of process water to the maximum extent possible. In total, it is expected that around 4700m3/hr overflow water will be available for reuse, a saving that supports FLSmidth’s MissionZero sustainability goal of moving the mining industry towards zero water waste. FLSmidth will also be able to provide comprehensive, long-term operational support at the site, which is located 400km south from the FLSmidth Service Supercenter in Antofagasta. The order was partially booked in Q1 2021, with the majority of the amount, close to DKK200m, booked in Q2 2021. The equipment is expected to be delivered by end H1 2022. Our customer is Ausenco Chile Ltd., who are the lump-sum turnkey contractor for the Mantoverde Development Project, which is owned by Mantos Copper Holding (“Mantos Copper”). “We are delighted that Ausenco have recognised the benefits of selecting FLSmidth as their primary supplier for Mantoverde. It is a crystal-clear endorsement of FLSmidth’s strength through the mineral processing flowsheet, and in service. This approach will maximise project execution efficiencies and de-risk process performance. We look forward to delivering the equipment to Mantoverde and providing service support from erection to start-up, and through to final commissioning,” comments Mikko Keto, Mining President at FLSmidth. Keto focused on the MissionZero sustainability aspect of the order, as it will help reduce energy and water waste at the site. “We are looking forward to working with Ausenco and their Environment & Sustainability team in South America. As the provider of the equipment and service, we will ensure optimised throughput and the efficient commissioning of the project in an environmentally friendly manner. This project will transform Mantoverde into a long-life, low-cost operation,” adds Mikko Keto. Mantoverde will produce 106,000 tons of fine copper and 33,000 ounces of gold annually. Contacts Media RelationsRasmus Windfeld, +45 40 44 60 60, rwin@flsmidth.comInvestor RelationsNicolai Mauritzen, +45 30 93 18 51, nicm@flsmidth.com FLSmidth provides sustainable productivity to the global mining and cement industries. We deliver market-leading engineering, equipment and service solutions that enable our customers to improve performance, drive down costs and reduce environmental impact. Our operations span the globe and we are close to 10,200 employees, present in more than 60 countries. In 2020, FLSmidth generated revenue of DKK 16.4 billion. MissionZero is our sustainability ambition towards zero emissions in mining and cement by 2030.www.flsmidth.com/MissionZero Attachment FLSmidth receives significant order for a range of key equipment for Chilean copper mine

  • FLSmidth targets carbon neutrality by 2030
    GlobeNewswire

    FLSmidth targets carbon neutrality by 2030

    FLSmidth, a global technology leader in the mining and cement industries, received validation from the Science Based Targets initiative for its carbon emission reduction targets. By implementing its MissionZero programme to achieve these targets, the company will help keep global warming below 1.5°C at the same time as delivering solutions to help reduce global CO2 emissions by more than 10% – and becoming carbon neutral in its own operations by 2030. Commenting on the targets, CEO Thomas Schulz says: “I truly believe that the global climate challenge more than anything will find it’s solution in technology, and as a technology leader FLSmidth is uniquely placed to address this. By setting these targets, we commit to deliver solutions to our customers to reduce emissions. We’ve already communicated strong sustainability ambitions through the MissionZero programme and, with our Science Based Targets commitment, we will further accelerate these and get a clear picture on how we’re progressing with our MissionZero goals, by having specific numbers on reductions to commit to and meet year on year.” MissionZero programmeIn November 2019, FLSmidth announced its new sustainability ambition, as defined in the MissionZero programme. In short, the programme aims to provide zero-emission technology to the mining and cement industry by 2030, enabling a potential 10% reduction in the world’s CO2 emissions. The Science Based Targets cover the company’s emissions throughout the value chain – from its own operations, from its supply chain and, most prominently, from its customers. The latter account for > 95% of its emissions. According to the Science Based Targets pledge, by 2030 FLSmidth will: Be carbon-neutral in its own operationsHave 30% of its spend with suppliers with similar decarbonisation targetsCut customer-associated emissions per revenue by 56%, or 7% year on year These goals are on top of the MissionZero ambition to provide zero-emission technology to the mining and cement industries by 2030. “We need to operate with multiple goals to reach our CO2 reduction ambition. The MissionZero goals aim at providing the sustainable solutions on the shelves of the FLSmidth shop by 2030 at the latest, whereas the 56% reduction ensures that these solutions actually get to the market and drive a green transition there. Many of our customers have set carbon neutrality targets for 2050. In order to achieve these, the solutions need to be available already by 2030. Finally, our carbon neutrality ambition for our own operations by 2030 will ensure that we 'walk the talk' internally as well,” adds Thomas Schulz. To achieve these ambitious Science Based Targets, FLSmidth will: Work in partnership with its customers to improve their sustainability performance with FLSmidth’s flagship solutions Accelerate investment in sustainability-related R&D and engage in strategic industry and university partnerships around the world to develop new solutionsInvest in renewable energy for its own operations “We congratulate FLSmidth A/S on setting science-based targets consistent with limiting warming to 1.5°C – the most ambitious goal of the Paris Agreement," says Alberto Carrillo Pineda, Director, Science Based Targets at CDP, one of the Science Based Targets initiative partners. "By aligning its goals with a 1.5°C future, FLSmidth A/S is ensuring it builds resilience firmly into its business model and strengthening its MissionZero programme that will help reduce emissions in hard-to-abate sectors.” ContactsMedia Relations Rasmus Windfeld, +45 40 44 60 60, rwin@flsmidth.comInvestor RelationsNicolai Mauritzen, +45 30 93 18 51, nicm@flsmidth.com FLSmidth provides sustainable productivity to the global mining and cement industries. We deliver market-leading engineering, equipment and service solutions that enable our customers to improve performance, drive down costs and reduce environmental impact. Our operations span the globe, and we have close to 10,700 employees in more than 60 countries. In 2020, FLSmidth generated revenue of DKK 16.4 billion. MissionZero is our sustainability ambition towards zero emissions in mining and cement by 2030.flsmidth.com/MissionZero SBTi is a joint initiative by CDP, UN Global Compact (UNGC), World Resources Institute (WRI) and WWF whose mission is to increase corporate ambition on climate action by mobilising companies to set greenhouse gas emission reduction targets consistent with science-based requirements to limit global warming to less than 1.5ºC/2°C compared to pre-industrial temperatures. For more information, visit sciencebasedtargets.org Attachment Science based target press release

  • ACCESSWIRE

    FLSmidth & Co. A/S to Host Earnings Call

    NEW YORK, NY / ACCESSWIRE / May 5, 2021 / FLSmidth & Co. A/S (OTC PINK:FLIDY) will be discussing their earnings results in their 2021 First Quarter Earnings call to be held on May 5, 2021 at 11:00 AM Eastern Time.