GSPR.V - GSP Resource Corp.

TSXV - TSXV Delayed Price. Currency in CAD
0.1100
+0.0200 (+22.22%)
At close: 1:50PM EDT
Stock chart is not supported by your current browser
Gain actionable insight from technical analysis on financial instruments, to help optimize your trading strategies
Chart Events
Neutralpattern detected
Performance Outlook
  • Short Term
    2W - 6W
  • Mid Term
    6W - 9M
  • Long Term
    9M+
Previous Close0.0900
Open0.1100
Bid0.1100 x 0
Ask0.1500 x 0
Day's Range0.1100 - 0.1100
52 Week Range0.0800 - 0.4400
Volume1,000
Avg. Volume35,584
Market Cap1.291M
Beta (5Y Monthly)N/A
PE Ratio (TTM)N/A
EPS (TTM)N/A
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
Fair Value is the appropriate price for the shares of a company, based on its earnings and growth rate also interpreted as when P/E Ratio = Growth Rate. Estimated return represents the projected annual return you might expect after purchasing shares in the company and holding them over the default time horizon of 5 years, based on the EPS growth rate that we have projected.
Fair Value
XX.XX
N/A
Research that delivers an independent perspective, consistent methodology and actionable insight
Related Research
    View more
    • GlobeNewswire

      GSP Resource Corp. Options 60% Interest in Olivine Mountain Project to Full Metal Minerals Ltd.

      VANCOUVER, British Columbia, Feb. 26, 2020 -- GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) and Full Metal Minerals Ltd. (TSX-V: FMM) (“Full Metal”) have entered.

    • GlobeNewswire

      GSP Resource Corp. Announces Drill Permitting Underway at the Alwin Mine Copper-Gold-Silver Project

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce that drill permitting is currently underway on the Company’s Alwin Mine project. The Alwin Mine property is approximately 575.72 hectares and is adjacent with the western boundary of Teck Corporation’s Highland Valley Copper Mine, the largest open-pit porphyry copper-molybdenum mine in western Canada. Alteration and mineralization of the Highland Valley hydrothermal system extends westward from the Highland Valley mine onto the Alwin property.

    • GlobeNewswire

      GSP Resource Corp. Appoints J. Greg Dawson, P.Geo. to Technical Advisory Board

      GSP Resource Corp. (TSX-V: GSPR) (the “Company”) is pleased to announce the appointment of J. Greg Dawson, P.Geo., to the Company’s Technical Advisory Board. Mr. Dawson is a successful mining professional bringing over 30 years of international and domestic industry experience with major, mid-tier and junior companies. J. Greg Dawson, P.Geo., has over 30 years of experience in the mineral exploration industry and is currently working as an independent consultant and sits on the board of Sitka Gold Corp. He holds a BSc in geology from the University of British Columbia and an MSc from Queens University and is a registered Professional Geoscientist with EGBC.

    • Here's Why We're Watching GSP Resource's (CVE:GSPR) Cash Burn Situation
      Simply Wall St.

      Here's Why We're Watching GSP Resource's (CVE:GSPR) Cash Burn Situation

      Just because a business does not make any money, does not mean that the stock will go down. For example, biotech and...

    • GlobeNewswire

      GSP Resource Corp. Signs Definitive Agreement to Acquire the Alwin Copper-Gold-Silver Project

      VANCOUVER, British Columbia, Jan. 30, 2020 -- GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce it has signed an option agreement to acquire 100%.

    • GlobeNewswire

      GSP Resource Corp. Announces Results of Fall 2019 Drill Program at Olivine Mountain

      VANCOUVER, British Columbia , Jan. 15, 2020 (GLOBE NEWSWIRE) -- 2020: GSP Resource Corp, (GSPR.V) the “Company” or GSP) is pleased to release the preliminary drilling results on the Olivine Mountain property, located in Similkameen Mining Division, British Columbia. The Olivine Mountain property covers part of the Tulameen Ultramafic Complex, a large slab of magnesium and iron-rich rock that ascended from near the base of the earth’s crust to its current position during continental collision and the emplacement of the Cache Creek terrane in southwestern British Columbia. Previous mapping and the 2018 GSP soil survey confirm that there is a northwest-southeasterly trending geological contact that separates mafic rocks in the northeastern part of the property from ultramafic rocks in the property’s southwestern part.

    • GlobeNewswire

      GSP Resource Corp. Signs Letter of Intent to Acquire the Alwin Copper-Gold-Silver Project

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce it has entered into a letter of intent (“LOI”) with Richard John Billingsley and S. Gaye Richards (the “Vendors”), whereby GSP and the Vendors will negotiate and settle the terms of a definitive option agreement (the “Option Agreement”) that will provide GSP with an option to acquire a 100% interest in the Vendor’s right, title and interest in and to the mineral claims compromising the mineral exploration and development project known as the “Alwin Project”, located in the Kamloops Mining Division, 18 km west of Logan Lake, British Columbia (the “Transaction”). The Alwin Project includes the past-producing Alwin Copper Mine and is located immediately west of Teck Resources’ Valley porphyry copper-molybdenum-silver ore body.

    • GlobeNewswire

      GSP Intersects Mineralization in Two Drill Holes 1.5 km Southeast of Asp 14 and Expands Drill Program to Seven Holes

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to provide the following progress update on the initial diamond drilling program at its 3021.87-hectare Olivine Mountain Project in Southwestern British Columbia. GSP has now completed seven drill holes totalling approximately 1,200 meters at the Olivine Mountain Project. Five holes were drilled in the Main Zone of the project Southeast of Olivine Creek, approximately 1.5 km Southeast of the Asp 14 showing, increasing from an initial budget of four 200-meter vertical holes in this area.

    • GlobeNewswire

      GSP Intersects Mineralization in Two Drill Holes at Olivine Mountain Project and Expands Drill Program to Six Holes From Five

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to provide the following progress update on the initial diamond drilling program at its 3021.87 hectare Olivine Mountain Project in Southwestern British Columbia. Drill core from the two drill holes at Asp 14 has been logged and split, and samples are currently being shipped to the laboratory for assay. The current initial drill program is now expected to total six drill holes, up from five previously.

    • GlobeNewswire

      GSP Commences Diamond Drill Program at Olivine Mountain Project

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce that it has commenced the inaugural diamond drilling program at the Olivine Mountain Project in Southwestern British Columbia. The initial ~1000 meter drill program will test five separate Massive copper/nickel sulphide targets across the 3021.87 hectare property. The drill program is testing targets that were identified during the previous field season that included a VLF-EM airborne survey, a soil geochemical survey of the entire property, and mapping and sampling program (see news release dated July 29, 2019).

    • GlobeNewswire

      GSP Mobilizes Field Crews to Olivine Mountain Project

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce that it has mobilized field crews to the Olivine Mountain Project in Southwestern, British Columbia. Field crews are currently constructing core storage and core cutting facilities in Princeton, British Columbia in preparation for the upcoming drill program. Qualified person: The scientific and technical disclosure contained in this news release have been reviewed and approved by Christopher I. Dyakowski, PGeo, a director of the company and a qualified person as that term is defined in National Instrument 43-101 -- Standards of Disclosure for Mineral.

    • GlobeNewswire

      GSP Resource Corp. Announces Closing of Flow-Through Private Placement

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce that further to its news release on October 29, 2019, it has closed its oversubscribed non-brokered private placement of 1,120,000 flow-through units (each a “FT Unit”) at a price of $0.15 per FT Unit for gross proceeds of $168,000 (the “Private Placement”). As previously disclosed, each FT Unit consists of one flow-through common share (the “FT Shares”) and one non flow-through common share purchase warrant (the “Warrants”).

    • GlobeNewswire

      GSP Announces Flow-Through Financing

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce that it intends to complete a non-brokered private placement of up to 1,000,000 flow-through units (each a “FT Unit”) at a price of $0.15 per FT Unit for gross proceeds of up to $150,000 (the “Private Placement”). Each FT Unit will consist of one flow-through common share (the “FT Shares”) and one non flow-through common share purchase warrant (the “Warrants”).

    • GlobeNewswire

      GSP Receives Drill Permits for Olivine Mountain Project

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce that it has received permits for the proposed drilling program on the Company’s Olivine Mountain property located in the Similkameen Mining Division, 25 km northwest of Princeton, British Columbia.  The Company expects to mobilize crews to commence the drill program in early November. Phase 1 drilling is expected to focus on five drill targets that have been established based on the Company’s exploration including a VLF-EM airborne survey, a soil geochemical survey of the entire property, and mapping and sampling (see news release dated July 29, 2019). GSP President & CEO Simon Dyakowski stated: “We are very pleased to have received permits to drill the Olivine Mountain project in order to follow up on encouraging sampling results.

    • Could The GSP Resource Corp. (CVE:GSPR) Ownership Structure Tell Us Something Useful?
      Simply Wall St.

      Could The GSP Resource Corp. (CVE:GSPR) Ownership Structure Tell Us Something Useful?

      A look at the shareholders of GSP Resource Corp. (CVE:GSPR) can tell us which group is most powerful. Generally...

    • GlobeNewswire

      GSP Receives Results From Rock Sampling Program and is in Final Stages of Permitting for Diamond Drilling

      GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce that it is in the final stages of the permitting process for the proposed drilling program on the Company’s Olivine Mountain property that is located in the Similkameen Mining Division, 25 km northwest of Princeton, British Columbia. Five drill targets have been established based on the Company’s exploration to date that includes a VLF-EM airborne survey, a soil geochemical survey of the entire property, and mapping and sampling.

    • GlobeNewswire

      GSP Resource Corp. Announces Drill Permitting Underway at Olivine Mountain

      The project is targeting mafic and ultramafic rocks emplaced into metasedimentary and intermediate metavolcanics rocks belonging to the Upper Triassic Nicola Group during a late Triassic deformational event.  This volcanic assemblage evolved during the Late Triassic arc magmatism and these rocks are considered to be co-magmatic with the rocks of the Tulameen mafic-ultramafic suite.  The Olivine Mountain project has several high-grade massive sulphide showings including the Hop Showing where a selected sample of a high-grade chalcopyrite stringer assayed 23.0 grams per tonne gold, 89.5 grams per tonne silver and 7.49% copper.  A chip sample from the ASP 14 Showing returned a sample grade of 4.74% copper over a width of 2 meters. Qualified Person:  The scientific and technical disclosure contained in this news release has been reviewed and approved by John R. Kerr, P.Eng, a “Qualified Person” as that term is defined in National Instrument 43-101 – Standards of Disclosure for Mineral.

    • GlobeNewswire

      GSP Resource Corp. Appoints John R. Kerr, P.Eng. To Technical Advisory Board

      GSP Resource Corp. (TSX-V: GSPR) (the “Company”) is pleased to announce that, John R. Kerr P.Eng., has joined the Company as the first member of a Technical Advisory Board to assist the management team in exploration of the Company’s Olivine Mountain project. Mr. Kerr graduated from the University of British Columbia in 1964 with a Bachelor of Applied Science (B.A.Sc) degree in Geological Engineering.  He has participated in the mining industry continuously since graduation as an exploration geologist.