Previous Close | 7.07 |
Open | 7.10 |
Bid | 7.01 x 0 |
Ask | 7.02 x 0 |
Day's Range | 7.01 - 7.12 |
52 Week Range | 1.80 - 7.83 |
Volume | 341,859 |
Avg. Volume | 1,049,055 |
Market Cap | 8.439B |
Beta (5Y Monthly) | 2.08 |
PE Ratio (TTM) | N/A |
EPS (TTM) | -0.01 |
Earnings Date | Mar 08, 2021 - Mar 12, 2021 |
Forward Dividend & Yield | N/A (N/A) |
Ex-Dividend Date | N/A |
1y Target Est | 6.47 |
Canadian exploration company Ivanhoe Mines is taking a "hard look" at projects in the United States amid a rush for green metals, Executive Co-Chairman Robert Friedland said on Monday. U.S. President-elect Joe Biden has indicated support boosting domestic production of metals used to make electric vehicles, solar panels and other products crucial to his climate plan. "We’ve been taking a hard look at projects in those states in the United States where we think we can get a social license to mine," Friedland said in a pre-recorded address at a virtual conference hosted by the Canada-based Association of Mineral Exploration.
Pre-production ore stockpiles now hold 1.52 million tonnes grading 4.03% copper, containing more than 61,000 tonnes of copperRecord underground development of 2,792 metres completed in December; more than 29.8 kilometres now complete - 10.5 kilometres ahead of planRemarkable thickness of the high-grade copper ore in the centre of the Kakula Mine has allowed the expansion of development drifts in this area to 10 metres high by 7.5 metres wide (75 square metres)Overall progress of ...
Mokopane, South Africa--(Newsfile Corp. - December 10, 2020) - Ivanhoe Mines (TSX: IVN) (OTCQX: IVPAF) announced today that the company has filed a new National Instrument 43-101 (NI 43-101) technical report covering the Platreef Integrated Development Plan 2020 (Platreef IDP20).The updated NI 43-101 technical report includes an independent feasibility study (Platreef 2020 FS) for the development of the Platreef Project as a 4.4-million-tonne-per- annum (Mtpa) underground mine with two new concentrators built in ...