MLNLF - Millennial Lithium Corp.

Other OTC - Other OTC Delayed Price. Currency in USD
1.1000
0.0000 (0.00%)
At close: 2:41PM EDT
Stock chart is not supported by your current browser
Previous Close1.1000
Open1.1000
Bid0.0000 x 0
Ask0.0000 x 0
Day's Range1.0550 - 1.1700
52 Week Range0.6700 - 1.6400
Volume12,450
Avg. Volume8,385
Market Cap90.253M
Beta (3Y Monthly)3.27
PE Ratio (TTM)N/A
EPS (TTM)-0.2730
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
Trade prices are not sourced from all markets
  • Millennial Lithium Corp. Announces Positive Feasibility Study Results for its Pastos Grandes Project, Argentina
    Newsfile

    Millennial Lithium Corp. Announces Positive Feasibility Study Results for its Pastos Grandes Project, Argentina

    US$ 1,030 million after-tax NPV at 8% discount rate and IRR of 24.2% for approx. 24,000 TPY production of Battery Grade lithium carbonate (> 99.5% LCE)Total Initial CAPEX estimate of US$ 448.2 millionOPEX of US $ 3,388/T battery grade lithium carbonate over the mine lifeOperation based on proven solar evaporation technology and conventional lithium brine processingProjected production mine life of 40 yearsVancouver, British Columbia--(Newsfile Corp. - July 29, 2019) - Millennial Lithium Corp. ...

  • Newsfile

    Millennial Lithium Announces Submission of Its Environmental Impact Assessment (EIA) for Construction and Operation of the Pastos Grandes Project

    Vancouver, British Columbia--(Newsfile Corp. - June 5, 2019) - Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2) (OTCQX: MLNLF) ("Millennial" or the "Company") is pleased to report the submission to the Environmental and Mining Authority in Salta Province, Argentina the Environmental Impact Assessment for Construction and Operations for its Pastos Grandes Project (the "EIA"). The objectives of the EIA are to identify, prevent, minimize, correct and mitigate any potential impacts to the environment or the social framework ...

  • Newsfile

    Millennial Files Technical Report with Measured and Indicated Resource Estimate of 4.12 Million Tonnes LCE at Pastos Grandes Project, Argentina

    Vancouver, British Columbia--(Newsfile Corp. - May 31, 2019) - Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2) (OTCQX: MLNLF) ("Millennial" or the "Company") is pleased to announce the filing of a technical report (the "Resource Report") titled "Phase III Measured, Indicated and Inferred Lithium and Potassium Resource Estimate Pastos Grandes Project Salta Province, Argentina" dated effective May 31, 2019 that contains an updated resource estimate for the Company's Pastos Grandes lithium brine project located in ...

  • Newsfile

    Millennial Lithium Announces Approximately 100 Percent Increase to 4,200,000 Tonnes in Measured and Indicated Lithium Resources at Pastos Grandes

    Vancouver, British Columbia--(Newsfile Corp. - April 17, 2019) - Millennial Lithium Corp. (TSXV: ML) (the "Company"), is pleased to report an updated lithium ("Li") and potassium ("K") resource statement for its Pastos Grandes brine project in Salta province of Argentina. The NI 43-101 resource statement, detailed in Table 1 below, includes 4,120,000 tonnes of lithium carbonate ("Li2CO3") equivalent (LCE) and 15,342,000 tonnes of potash ("KCl") equivalent in the Measured and ...

  • Newsfile

    Millennial Reports Positive Pumping Test Results from Third Production Scale Well at Pastos Grandes Project, Argentina; Investor Relations and Communications / Branding Agreements

    Vancouver, British Columbia--(Newsfile Corp. - March 20, 2019) - Millennial Lithium Corp. (TSXV: ML) ("Millennial" or the "Company") is pleased to report encouraging results from a short-term pumping test of a third production-scale well at its Pastos Grandes Project in Salta, Argentina. Pumping well PGPW18-17 was installed as a future production well, and meanwhile to undertake short-term pumping of lithium brine to determine aquifer parameters and chemical variation during a 72-hour period in March, ...

  • Newsfile

    Millennial Commissions Renewable Energy-Powered On-Site Development Park at Their Flagship Pastos Grandes Lithium Project; Caution Regarding Recent Online Article Concerning the Company

    Vancouver, British Columbia--(Newsfile Corp. - March 4, 2019) - Millennial Lithium Corp. (TSXV: ML) ("Millennial" or the "Company") is pleased to announce the inauguration of its on-site permanent Project Center, including a 60-100 person camp, an on site laboratory, and a process pilot plant under construction which is to be commissioned in the second quarter. In line with the Company's commitment to sustainability, the Project Center is to be powered by a state-of-the-art hybrid solar ...

  • Newsfile

    Millennial Reports Positive Pumping Test Results from Second Pumping Well at Pastos Grandes Project, Argentina

    Vancouver, British Columbia--(Newsfile Corp. - February 11, 2019) - Millennial Lithium Corp. (TSXV: ML) ("Millennial" or the "Company") is pleased to report encouraging results from an extended pumping test of a second production-scale well at its Pastos Grandes Project in Salta, Argentina. Pumping well PGPW17-04 was installed to complete extended pumping of lithium brine to determine the robustness and chemical variation of the aquifer over 23 days in September, 2018. At a pumping ...

  • Newsfile

    Millennial Produces Battery Grade Lithium Carbonate from Pastos Grandes Brine

    Vancouver, British Columbia--(Newsfile Corp. - January 15, 2019) - Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2) (OTCQX: MLNLF) ("Millennial" or the "Company") is pleased to report that bench scale process test work completed by SGS Canada Inc. (SGS) in their facilities in Lakefield, ON on brine from the Company's Pastos Grandes project in Salta, Argentina, has yielded battery grade (> 99.5% Li2CO3) lithium carbonate. Final purification testwork results yielded a lithium ...

  • Newsfile

    Millennial Provides Pastos Grandes Project Progress: Comprehensive Development Program Advancing

    Vancouver, British Columbia--(Newsfile Corp. - January 7, 2019) - Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2) (OTCQB: MLNLF) ("Millennial" or the "Company") is pleased to provide an update on all its technical programs at its Pastos Grandes Project in Salta, Argentina. The Company is currently engaged in a comprehensive development plan which includes completion of a Definitive Feasibility Study, expansion drilling for an updated resource estimate, operating pilot ponds to provide concentrated lithium-rich ...

  • Newsfile

    Exploration Drilling Intersects Highest Lithium Grades to Date at Pastos Grandes Project

    Vancouver, British Columbia--(Newsfile Corp. - November 19, 2018) -  Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2) (OTCQB: MLNLF) ("Millennial" or the "Company") is pleased to report positive drilling and analytical results from the latest exploration well at its Pastos Grandes Project in Salta, Argentina. Exploration well PGMW18-19 intersected, and bottomed, in a robust lithium-bearing brine zone which yielded 566 mg/l Li, 5,733 mg/l K and 3,385 mg/l Mg from 366m to the bottom of the hole at ...

  • Newsfile

    Millennial Completes Milestone Environmental Baseline Studies at Pastos Grandes and Engages Vector-Ausenco for Construction and Operations EIA

    Vancouver, British Columbia--(Newsfile Corp. - October 30, 2018) - Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2) (OTCQX: MLNLF) ("Millennial" or the "Company") is pleased to report that Ausenco-Vector ("Ausenco") has completed a comprehensive programme of Environmental Baseline Studies at its Pastos Grandes Project in Salta, Argentina. Millennial is also pleased to announce that it has engaged Ausenco to complete an Environmental Impact Assessment for the potential exploitation of lithium at its Pastos Grandes ...

  • Newsfile

    Millennial Expands Lithium Brine Horizon at Pastos Grandes

    Vancouver, British Columbia--(Newsfile Corp. - October 15, 2018) - Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2) (OTCQX: MLNLF) ("Millennial" or the "Company") is pleased to report positive drilling and analytical results from the latest exploration wells at its Pastos Grandes Project in Salta, Argentina. Two new exploration holes (PGMW18-16 and 17) have intersected, and bottomed in, lithium-bearing brine zones, with PGMW18-17 intersecting positive lithium grades in a 545 meter thick lithium-bearing horizon, including a high ...

  • Newsfile

    Millennial Strengthens Board for Development of Pastos Grandes Project, Salta, Argentina

    Vancouver, British Columbia--(Newsfile Corp. - September 24, 2018) - Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2) (OTCQX: MLNLF) ("Millennial" or the "Company") is pleased to announce the appointment of Mr. John Edward (Jack) Scott, P. Eng, MBA as a Director of the Company.Mr. Scott is currently Executive Vice President, Major Projects of the Alberici Group and Chief Administrative Officer for Alberici Constructors Ltd. Scott is responsible for major project and market partnerships throughout North America for Alberici, ...

  • Newsfile

    Exploration Drilling Expands Lithium Brine Horizon To REMSA License at Pastos Grandes

    Vancouver, British Columbia--(Newsfile Corp. - September 10, 2018) - Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2:GR) (OTCQB: MLNLF) ("Millennial" or the "Company") is pleased to report positive drilling and analytical results from the latest complete exploration wells at its Pastos Grandes Project in Salta, Argentina. All four new exploration holes (PGMW18-12—15) completed to date have terminated in thick lithium-bearing brine zones with Hole 15 intersecting lithium grades reaching up to 500 mg/L Li with the lithium horizon ...

  • Newsfile

    Millennial Provides Update of Ongoing Feasibility Study and Pilot Testwork at its Pastos Grandes Lithium Project, Argentina

    Vancouver, British Columbia--(Newsfile Corp. - August 21, 2018) - Millennial Lithium Corp. (TSXV: ML) (FSE: A3N2) (OTCQB: MLNLF) ("Millennial" or the "Company") is pleased to announce that there has been significant progress on its flagship Pastos Grandes Project in Salta, Argentina. Millennial has initiated numerous studies in support of its ongoing basic engineering and Feasibility Study recently initiated by WorleyParsons Chile.Farhad Abasov, Millennial President and CEO, commented, "We are very pleased with the ...