Advertisement
Advertisement
U.S. markets close in 4 hours 46 minutes
Advertisement
Advertisement
Advertisement
Advertisement

Neoen S.A. (NEOEN.PA)

Paris - Paris Delayed Price. Currency in EUR
Add to watchlist
41.94-1.36 (-3.14%)
As of 04:52PM CEST. Market open.
Advertisement
Full screen
Gain actionable insight from technical analysis on financial instruments, to help optimize your trading strategies
Chart Events
Neutralpattern detected
Previous Close43.30
Open43.20
Bid0.00 x 0
Ask0.00 x 0
Day's Range41.88 - 43.34
52 Week Range26.12 - 45.22
Volume48,570
Avg. Volume111,013
Market Cap4.482B
Beta (5Y Monthly)0.73
PE Ratio (TTM)N/A
EPS (TTM)-0.15
Earnings DateMay 11, 2021
Forward Dividend & Yield0.10 (0.23%)
Ex-Dividend DateJun 01, 2022
1y Target Est36.86
  • Reuters

    Neoen Australia battery to provide grid stabilisation service in world first

    Neoen SA has won approval for its big battery in South Australia to provide inertia service to stabilise the grid, a world first for battery energy storage in the push to replace fossil-fueled generators, the French firm said on Wednesday. Neoen's 150-megawatt Hornsdale Power Reserve uses Tesla Inc's Megapack battery system and will now use Tesla's Virtual Machine Mode to deliver inertia services, until now provided by coal-fired and gas-fired power plants with big turbines. Neoen Chairman Xavier Barbaro said extending the range of services the big battery could offer created "additional layers of value for existing battery storage investments".

  • Reuters

    Neoen says Australian wind farm hits full tilt, two years behind plan

    Neoen SA said its Bulgana wind farm and battery project in Australia has finally been fully switched on two years behind schedule, after overcoming problems hooking up to a grid with limited capacity for an influx of renewable energy. The A$350 million ($253 million) project comprises a 204 megawatt wind farm in the village of Bulgana in Victoria, which first started operating at limited capacity in 2020, and a connected 20 MW battery, which was switched on in July. "Connecting our Bulgana Power Hub to the grid was a long and challenging process, but we are proud of having overcome it thanks to the team's dedication," Neoen Australia's Managing director Louis de Sambucy said in a statement.

  • Business Wire

    Neoen Selects Doosan to Deliver Largest Standalone Energy Storage System in the Australian Capital Territory

    MELBOURNE, Australia, December 15, 2021--Neoen has named a consortium of Doosan Heavy Industries & Construction Co. Ltd. and its subsidiary, Doosan GridTech, to build the 100MW/200MWh Capital Battery ― the largest standalone battery storage system in the Australian Capital Territory (ACT). The consortium will provide engineering, procurement, and construction (EPC) services with a 20-year operations and maintenance program. Doosan GridTech's Intelligent Controller® will orchestrate energy arbitr

Advertisement
Advertisement