NRGMF - NRG Metals Inc.

Other OTC - Other OTC Delayed Price. Currency in USD
0.1754
-0.0056 (-3.09%)
At close: 3:53PM EDT
Stock chart is not supported by your current browser
Previous Close0.1810
Open0.0000
Bid0.0000 x 0
Ask0.0000 x 0
Day's Range0.0000 - 0.0000
52 Week Range
Volume0
Avg. Volume301,126
Market Cap23.642M
Beta11.04
PE Ratio (TTM)N/A
EPS (TTM)-0.0570
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
Trade prices are not sourced from all markets
  • PR Newswire6 days ago

    NRG Announces Excellent Pumping Well Test Results at Flagship Hombre Muerto North Lithium Project

    NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) the Company is pleased to report pumping test results for the first 10 inch large-diameter pumping well at the Hombre Muerto North Lithium Project, Argentina. The well is located on the Tramo Claim portion of the project group. This pumping well was drilled immediately adjacent to the first exploration diamond core hole following the excellent results from the recent sampling that provided assay results of 401 meters of 900 mg/L lithium with very good chemistry as reported in the Company's press release dated June 28, 2018.

  • CNW Group6 days ago

    NRG Announces Excellent Pumping Well Test Results at Flagship Hombre Muerto North Lithium Project

    VANCOUVER , Aug. 9, 2018 /CNW/ - NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) the Company is pleased to report pumping test results for the first 10 inch large-diameter pumping well at the Hombre Muerto North Lithium Project, Argentina . The well is located on the Tramo Claim portion of the project group. This pumping well was drilled immediately adjacent to the first exploration diamond core hole following the excellent results from the recent sampling that provided assay results of 401 meters of 900 mg/L lithium with very good chemistry as reported in the Company's press release dated June 28, 2018 .

  • PR Newswirelast month

    NRG Announces Initial Results for Second Drill Hole at Its Flagship Hombre Muerto North Lithium Project

    - Initial sample results for the second core hole indicate excellent lithium values with very low Mg/Li ratios. VANCOUVER, British Columbia, July 10, 2018 /PRNewswire/ -- NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) is pleased to report the initial assays for samples from the second diamond drill hole at the Hombre Muerto Lithium project. The samples were taken from near surface to a depth of 61.5 m below surface.  The samples average 719 mg/L lithium with a very low Mg to Li ratio ranging from 2.1 to 3.3.

  • PR Newswire2 months ago

    NRG Announces Complete Results for First Drill Hole at its Flagship Hombre Muerto North Lithium Project

    Brine samples collected from 300 to 401 meters (m) show high grade values very similar to the assays previously reported for the samples from surface to a depth of 300 m, with an arithmetic average 918 mg/l lithium and a low magnesium to lithium ratio. The arithmetic average lithium concentration for all of the samples from the surface to a depth of 401 m is 900 mg/l, with a relatively low magnesium to lithium ratio of 3.0 to 1.0. Drilling on a second core hole located 2.1 kilometers to the west of the first hole is advancing.

  • NRG Drilling Continues to Intersect High-grade Brine at the Hombre Muerto North Lithium Project
    PR Newswire2 months ago

    NRG Drilling Continues to Intersect High-grade Brine at the Hombre Muerto North Lithium Project

    • The hole has been completed to a depth of 401 meters, and sample results from 300 to the bottom of the hole are pending. • Adjacent rotary drill hole for pump testing has been completed to a depth of 393 meters. • Drilling has commenced on a second diamond core hole approximately 2.1 kilometers to the east of the first hole.

  • CNW Group3 months ago

    NRG Metals Announces Pumping Test Well at 309 Meters

    VANCOUVER , May 25, 2018 /CNW/ - NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) the Company is pleased to report that the drilling of a pump test well at the Hombre Muerto North Lithium Project is progressing on schedule. The rotary hole, which is located 15 meters east of the core hole currently underway, is now at 309 meters, with an expected target dept of 400 meters. The pumping well is being drilled in tandem with the core hole because the Company was confident that it would obtain acceptable results in the core hole.

  • NRG Metals Announces Pumping Test Well at 309 Meters
    PR Newswire3 months ago

    NRG Metals Announces Pumping Test Well at 309 Meters

    VANCOUVER, British Columbia, May 25, 2018 /PRNewswire/ -- NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) the Company is pleased to report that the drilling of a pump test well at the Hombre Muerto North Lithium Project is progressing on schedule.   The rotary hole, which is located 15 meters east of the core hole currently underway, is now at  309 meters, with an expected target dept of 400 meters. The pumping well is being drilled in tandem with the core hole because the Company was confident that it would obtain acceptable results in the core hole.

  • CNW Group3 months ago

    NRG Reports Consistent High-Grade Brine Intercepts Over the First 100 Meters of Drilling at the Hombre Muerto North Lithium Project

    NRG Reports Consistent High-Grade Brine Intercepts Over the First 100 Meters of Drilling at the Hombre Muerto North Lithium Project

  • PR Newswire3 months ago

    NRG Reports Consistent High-Grade Brine Intercepts over the First 100 Meters of Drilling at the Hombre Muerto North Lithium Project

    The hole is now at 300.5 meters in clastic sediments, and brine samples are currently being collected from 300 to 100 meters. NRG Metals Inc. ("NRG" or the "Company ") (NGZ.V)(NRGMF)(OGPN.F) the Company is delighted to report that double packer samples collected over the first 100 meters of the hole average 905 mg/l lithium with a low Mg to Li ratio of 3.0 to 1.0.

  • NRG Adds Second Drill at the Hombre Muerto North Lithium Project
    PR Newswire3 months ago

    NRG Adds Second Drill at the Hombre Muerto North Lithium Project

    VANCOUVER, British Columbia, May 14, 2018  /PRNewswire/ -- NRG Metals Inc. ("NRG" or the "Company") (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) the Company is pleased to report that it has mobilized a rotary drill to the Hombre Muerto North Lithium project to complement the diamond drill already at site. The rotary hole, which is located 15 meters east of the core hole currently underway, is to carry out pump testing.

  • PR Newswire3 months ago

    Drilling at the Salar Escondido Lithium Project Reaches 400 Meter Target Depth

    NRG Metals Inc. ("NRG" or the "Company") (TSX-V:NGZ) (NRGMF) (OGPN.F) is pleased to report that drilling at the Salar Escondido Lithium Project has progressed ahead of schedule, and an 8.5 inch rotary hole has been completed to the target depth of 400 meters. From 370 to 400 meters the hole intersected an unaltered basalt that may be the bottom of the basin. After the casing is installed, the hole will be given time to stabilize before sampling by a ProHydro Inc. SNAP passive sampler and custom packer equipment Mr. William Feyerabend, a Qualified Person under NI 43-101, will be on site to provide senior supervision beginning in mid-May.

  • PR Newswire3 months ago

    Drilling and Sampling Underway at Hombre Muerto North Lithium Project

    VANCOUVER, British Columbia, May 3, 2018 /PRNewswire/ -- NRG Metals Inc. ("NRG" or the "Company") (TSX-V:NGZ) (NRGMF) (OGPN.F) the Company is pleased to report that drilling at the Salar Hombre Muerto North  lithium project is  underway and progressing as planned. The first diamond core hole has been advanced to a depth of 105 meters with a target depth of up to 350 meters. Samples will be sent to Alex Stewart Laboratories in Jujuy, Argentina.

  • CNW Group4 months ago

    Drilling at Salar Escondido Approaching Target Zone

    VANCOUVER , April 19, 2018 /CNW/ - NRG Metals Inc. ("NRG" or the "Company") (TSX-V:NGZ.V) (NRGMF) (OGPN.F) is pleased to announce that drilling on a second test well is progressing at the Salar Escondido Lithium Project, comprised of 29,180 hectares (72,100 acres), and located in Catamarca Province, Argentina . A rotary drill operated by drilling contractor Water Drilling ("WD") had completed 87 meters as of Tuesday, April 17 th. The hard basaltic layer encountered in the previous hole was not encountered in this well. This second hole is located approximately one kilometer south of the Company's initial diamond drill hole, which was completed to a depth of 307 meters in December 2017 .

  • PR Newswire4 months ago

    Drilling at Salar Escondido Approaching Target Zone

    NRG Metals Inc. ("NRG" or the "Company") (TSX-V:NGZ.V) (NRGMF) (Frankfurt:OGPN.F) is pleased to announce that drilling on a second test well is progressing at the Salar Escondido Lithium Project, comprised of 29,180 hectares (72,100 acres), and located in Catamarca Province, Argentina. A rotary drill operated by drilling contractor Water Drilling ("WD") had completed 87 meters as of Tuesday, April 17th. WD is contracted to drill an 8.5-inch diameter rotary hole up to a depth of 400 m. This second hole is located approximately one kilometer south of the Company's initial diamond drill hole, which was completed to a depth of 307 meters in December 2017.

  • CNW Group4 months ago

    NRG Metals Inc Announce Drill Rig on Site at Salar Escondido

    NRG Metals Inc Announce Drill Rig on Site at Salar Escondido

  • PR Newswire4 months ago

    NRG Metals Inc Announce Drill Rig on Site at Salar Escondido

    NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) is pleased to announce that a drill rig and camp are now on site at the 29,180 hectare (72,100 acre) Salar Escondido Lithium Project located in Catamarca Province, Argentina. During 2017, NRG's drilling confirmed the presence of a buried brine zone beneath the alluvial cover on the surface of the basin. Brine was intersected at a depth of 140 m, and as reported in the Company's press release dated December 7, 2017, sampling from 183 to 198 m returned an average grade of 229 mg Li/liter in a porous, weakly consolidated sandstone horizon. A Vertical Electrical Sounding ("VES") geophysical survey conducted by the Company suggests that the brine zone occurs at an even shallower depth where the upcoming hole will be drilled.

  • CNW Group4 months ago

    NRG to Commence Drilling at the Salar Escondido Lithium Project, Catamarca, Argentina

    NRG to Commence Drilling at the Salar Escondido Lithium Project, Catamarca, Argentina

  • PR Newswire4 months ago

    NRG to Commence Drilling at the Salar Escondido Lithium Project, Catamarca, Argentina

    NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) is pleased to announce that drilling will commence shortly at the 29,180 hectare (72,100 acre) Salar Escondido Lithium Project located in Catamarca Province, Argentina. NRG has contracted with Water Drilling from Catamarca to drill an 8.5-inch diameter rotary hole up to a depth of 400 m. The hole will be located approximately one kilometer south of the Company's initial diamond drill hole, which was completed to a depth of 307 m in December 2017. Water Drilling is currently in the process of completing a drilling program for another company on a project nearby, and the drill will be moved to the project in the next few days with drilling scheduled to start the week of April 9.

  • CNW Group4 months ago

    NRG Metals' Exploration Program Update: Drill Pads, Roads, Camp, and Infrastructure Construction Underway at Hombre Muerto North Project

    NRG Metals' Exploration Program Update: Drill Pads, Roads, Camp, and Infrastructure Construction Underway at Hombre Muerto North Project

  • PR Newswire4 months ago

    NRG Metals' Exploration Program Update: Drill Pads, Roads, Camp, and Infrastructure Construction Underway at Hombre Muerto North Project

    NRG Metals Inc. ("NRG" or the "Company ") (NGZ.V) (NRGMF) (OGPN.F) is pleased to announce progress at the Hombre Muerto North Lithium Project ("HMN"), located in Salta Province, Argentina. Road and drill pad construction has recently begun at HMN by OneBorax a local heavy equipment contractor.  The first road, located at the Tramo Claim Group has been constructed, and work on the first drill pad is being completed. A fifteen person camp has been installed by Servicios Mineros, and includes insulated buildings, electrical generation and a fuel station supply.  Road and pad construction will be ongoing, while drill preparations are being completed.

  • NRG Metals Inc (CVE:NGZ): How Does It Impact Your Portfolio?
    Simply Wall St.5 months ago

    NRG Metals Inc (CVE:NGZ): How Does It Impact Your Portfolio?

    If you are looking to invest in NRG Metals Inc’s (TSXV:NGZ), or currently own the stock, then you need to understand its beta in order to understand how it canRead More...