NTTHF - Neo Lithium Corp.

Other OTC - Other OTC Delayed Price. Currency in USD
0.5044
+0.0304 (+6.41%)
At close: 2:41PM EDT
Stock chart is not supported by your current browser
Previous Close0.4740
Open0.5040
Bid0.0000 x 0
Ask0.0000 x 0
Day's Range0.4916 - 0.5044
52 Week Range0.3800 - 1.0400
Volume1,854
Avg. Volume25,608
Market Cap58.426M
Beta (3Y Monthly)1.94
PE Ratio (TTM)N/A
EPS (TTM)N/A
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
Trade prices are not sourced from all markets
All
News
Press Releases
  • PR Newswirelast month

    Neo Lithium Discovers High Grade Lithium at Greater Depth

    FSE:NE2) is pleased to report new drilling results from its wholly-owned Tres Quebradas lithium brine project ("3Q Project") in Catamarca Province, Argentina. The Company filed a reserve estimation on May 7, 2019 within prefeasibility study ("PFS") which defined proven and probable reserves of 1,294,000 tones of lithium carbonate with an average grade of 790 mg/L Lithium with a cut off at 800 mg/L Lithium out of a measured and indicated resource of 4,005,000, with a cut off at 400 mg/L Lithium.

  • GlobeNewswire2 months ago

    Neo Lithium Provides Operational Update

    Lithium Carbonate Pilot Plant Now Fully OperationalFirst Batch of Technical Grade Lithium Carbonate Expected in July-August 2019 First Batch of Battery Grade Lithium Carbonate.

  • GlobeNewswire2 months ago

    Neo Lithium Announces Filing of Technical Report for the Pre-Feasibility Study on its 3Q Project

    FSE:NE2) is pleased to announce that it has filed a technical report for its wholly-owned Tres Quebradas lithium brine project ("3Q Project") in Catamarca Province, Argentina (the "Technical Report" or the “PFS”) pursuant to National Instrument 43-101 "Standards of Disclosure for Mineral Projects" ("NI 43-101"). The Technical Report supports the disclosure made by the Company in its March 21, 2019 news release announcing the results of the maiden pre-feasibility study for the 100% owned 3Q Project.

  • GlobeNewswire3 months ago

    Neo Lithium Announces Submission of its Environmental Impact Assessment (“EIA”) for Construction of its 3Q Project

    The 3Q Project achieves a major milestone by submitting the project Environmental Impact Assessment (“EIA”) to the Catamarca Mining and Environmental Authority, after more than 2 years of preparation. The 3Q Project will provide significant economic and social benefits for the Catamarca Province, the Tinogasta Department and Fiambala Municipality.

  • GlobeNewswire3 months ago

    Neo Lithium Announces Results of New Drill Hole and Long-Term Pump Test in the High-grade Zone of the 3Q Project

    FSE: NE2)  is pleased to announce that Hidrotec SA completed Drill Hole PP25-R-1 down to 167 metres and a long-term pump test has been completed in its wholly-owned Tres Quebradas lithium brine project ("3Q Project") in Catamarca Province, Argentina. Drill hole PB1-R-24 is located in the high-grade zone of the 3Q Project. The average lithium grade of the 137.6 meters that were pumped was 1,128 mg/l Li.

  • GlobeNewswire4 months ago

    Neo Lithium Announces Positive PFS Results on its 3Q Project

    FSE: NE2) is pleased to announce positive results of a prefeasibility study (“PFS”) prepared in accordance with National Instrument 43-101 (“NI 43-101”) for its wholly-owned Tres Quebradas lithium brine project ("3Q Project") in Catamarca Province, Argentina. The technical report summarizing the PFS is being prepared by GHD Chile SA ("GHD") and Groundwater Insight Inc., in accordance with NI 43-101 (the “Technical Report”).

  • GlobeNewswire5 months ago

    New Lithium Supply - From Pilot Plants to Commercialization; Companies Ramping up for Global Demand of the Future

    POINT ROBERTS, Wash. and DELTA, British Columbia, March 04, 2019 -- Investorideas.com, an investor news source covering lithium stocks, issues a snapshot looking at key trends.

  • GlobeNewswire5 months ago

    Neo Lithium Announces Arrival of its Lithium Carbonate Pilot Plant to Site & Receives Renewal of its Environmental Licence for the 3Q Project

    FSE: NE2) is pleased to announce that the lithium carbonate pilot plant (“Plant”) built by the Instituto de Investigaciones Tecnologicas from Universidad de Concepcion, Chile, has successfully arrived in Fiambala, Catamarca, Argentina. The Company’s engineers have started reassembling the Plant and expect to have it fully operational in late February for its Tres Quebradas lithium brine project in Catamarca Province, Argentina (the “3Q Project”).

  • GlobeNewswire6 months ago

    Neo Lithium Announces Completion and Shipment of Pilot Plant to Argentina and Starts Drilling Campaign in the High-Grade Zone of the 3Q Project

    FSE: NE2) is pleased to announce that it has successfully completed and tested the pilot plant (the “Plant”) built by the Instituto de Investigaciones Tecnologicas from Universidad de Concepcion, Chile and has shipped the Plant to the warehouse in Fiambala, Catamarca, Argentina. The Company estimates that it will take 45 days for the Plant to be shipped, clear customs, and be reassembled and operational. The Plant was tested with artificial brine in Chile and the Company now is concentrating approximately 4% lithium brine in its pilot evaporation ponds to start production of lithium carbonate at the Plant.

  • GlobeNewswire8 months ago

    Neo Lithium to Complete a Pre-Feasibility Study in Q1 2019 and Provides 3Q Project Update

    FSE: NE2) is pleased to announce that it has contracted GHD, which is a well-recognized engineering firm with particular expertise in lithium brines, to complete a pre-feasibility study (“PFS”) at the 3Q Project by Q1 2019. GHD successfully completed the previous preliminary economic assessment (“PEA”) for the 3Q Project, filed on SEDAR on December 13th, 2017.