Previous Close | 1.0900 |
Open | 1.0608 |
Bid | N/A x N/A |
Ask | N/A x N/A |
Day's Range | 1.0608 - 1.0900 |
52 Week Range | 0.8020 - 1.9100 |
Volume | |
Avg. Volume | 10,541 |
Market Cap | 82.123M |
Beta (5Y Monthly) | 0.89 |
PE Ratio (TTM) | 3.61 |
EPS (TTM) | 0.3020 |
Earnings Date | N/A |
Forward Dividend & Yield | N/A (N/A) |
Ex-Dividend Date | N/A |
1y Target Est | N/A |
O3 Mining Inc. (TSXV: OIII) (OTCQX: OIIIF) ("O3 Mining" or the "Corporation") is pleased to announce the mobilization of two drills at Marban Engineering, which will be focusing on the Upper Camflo area and Orion deposit. The drilling is part of a 24,800 metre exploration program on the Marban Project.
O3 Mining Inc. (TSXV: OIII) (OTCQX: OIIIF) ("O3 Mining" or the "Corporation") is pleased to provide an update on its continuing drilling program on its Marban Project in Val-d'Or, Quebec, Canada. The Corporation is reporting new significant results from 27 holes drilled in 2022 over recognized extensions of the Norlartic trend up to two kilometres towards the southeast of the Norlartic deposit and adjacent to the northern wall of the Marban pit. A total of 13,692 metres in 56 holes have been dri
O3 Mining Inc. (TSXV: OIII) (OTCQX: OIIIF) ("O3 Mining" or the "Corporation") is pleased to provide an update on its continuing drilling program on its Marban Engineering Project in Val-d'Or, Quebec, Canada. The Corporation is reporting assay results from 14 holes from the Kierens-Norlartic infill drilling program completed in December 2022 (Press Release – December 22, 2022) seeking technical justification to convert a portion of the remaining 50,000 ounces of gold located within the Pre-feasib