U.S. markets closed

Prime Mining Corp. (PRYM.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
2.1800-0.1200 (-5.22%)
At close: 3:59PM EST
Full screen
Gain actionable insight from technical analysis on financial instruments, to help optimize your trading strategies
Chart Events
Neutralpattern detected
Previous Close2.3000
Open2.2300
Bid2.1800 x N/A
Ask2.2200 x N/A
Day's Range2.1700 - 2.3000
52 Week Range0.2500 - 2.4500
Volume349,003
Avg. Volume290,860
Market Cap186.542M
Beta (5Y Monthly)2.00
PE Ratio (TTM)N/A
EPS (TTM)-0.1670
Earnings DateDec 14, 2020
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateSep 24, 1991
1y Target Est3.50
Fair Value is the appropriate price for the shares of a company, based on its earnings and growth rate also interpreted as when P/E Ratio = Growth Rate. Estimated return represents the projected annual return you might expect after purchasing shares in the company and holding them over the default time horizon of 5 years, based on the EPS growth rate that we have projected.
Fair Value
XX.XX
N/A
Research that delivers an independent perspective, consistent methodology and actionable insight
Related Research
    View more
    • Prime Mining Makes Payment to Vista Gold Corp.
      GlobeNewswire

      Prime Mining Makes Payment to Vista Gold Corp.

      VANCOUVER, British Columbia, Jan. 11, 2021 (GLOBE NEWSWIRE) -- Prime Mining Corp. (“Prime” or the “Company”) (TSX-V: PRYM, OTCQB: PRMNF, Frankfurt: A2PRDW) has made payment of $1.1 million to Vista Gold Corp. (“Vista”) as per the terms of the acquisition of the Los Reyes Gold-Silver Project, located in the State of Sinaloa, Mexico. As disclosed on June 15, 2020 (see news release), Prime agreed to pay Vista $2.1 million in lieu of being granted certain royalties and back-in rights relating to the project. The remaining $1.0 million payment is due during July 2021. If Prime fails to make the remaining payment, Vista will have the right to reinstate its royalties and back-in rights.All dollar amounts are United States dollars.About Prime Prime is an ideal mix of successful capital markets and mining executives and experienced local exploration personnel who are expanding the exploration initiative at the historically productive Los Reyes gold and silver project in Sinaloa, Mexico. Current Measured and Indicated pit-constrained oxide mineral resources for the Property include 19.8 million tonnes containing 633,000 ounces of gold at 1.0 g/t and 16,604,000 ounces of silver at 26.2 g/t. Los Reyes holds substantial resource upside based on open extensions of known resources, ten kilometres of undrilled strike length and at least eight additional exploration targets. Prime Mining has a well-planned capital structure with significant management and insider ownership.ON BEHALF OF THE BOARD OF DIRECTORSDaniel Kunz Chief Executive OfficerFor further information, please contact:Daniel Kunz Chief Executive Officer and Director Prime Mining Corp. 1307 S. Colorado Ave. Boise, Idaho 83706 Telephone: 1-208-926-6379 office email: daniel@primeminingcorp.caAndrew Bowering Executive Vice President and Director Prime Mining Corp. 1507 – 1030 West Georgia Street Vancouver, BC, V6E 2Y3 Telephone: (604) 428-6128 Facsimile: (604) 428-6430 E: andy@primeminingcorp.caNeither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.Forward Looking InformationInformation set forth in this document may include forward-looking statements. While these statements reflect management's current plans, projections, and intents, by their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond the control of the Company. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on these forward-looking statements. There is no assurance the transactions noted above will be completed on the terms as contemplated, or at all. The Company’s actual results, programs, activities, and financial position could differ materially from those expressed in or implied by these forward-looking statements.

    • Prime Mining Corp. Provides Year-End Update and Plans for 2021
      GlobeNewswire

      Prime Mining Corp. Provides Year-End Update and Plans for 2021

      VANCOUVER, British Columbia, Jan. 06, 2021 (GLOBE NEWSWIRE) -- PRIME MINING CORP. (“Prime” or the “Company”) (TSXV:PRYM) (OTCQB: PRMNF) (Frankfurt:A2PRDW) is pleased to provide a year-end update on its 100% owned Los Reyes Gold-Silver Project (“Los Reyes”) located in the State of Sinaloa, Mexico. “As 2020 has come to an end and the new year has started, we want to thank our shareholders and stakeholders for their continued support. Prime has evolved during 2020 into a company with a highly skilled technical, management and governance team. Our geologic understanding of Los Reyes has increased significantly pointing to tremendous potential for a major new resource discovery,” stated Daniel Kunz, Chief Executive Officer.Prime began 2020 announcing surface sampling results that demonstrated significant outcropping mineralized areas that carried good grades over significant widths, outside the historical resources at Zapote North and Zapote South. Additionally, the Company completed a significant new long-term agreement for surface use over the Los Reyes project area with Ejido de Tasajera, the majority local landowner. This access agreement is for an initial term of 15 years and can be extended for 15-years. The agreement covers project access and land use for exploration, engineering, construction, commissioning, and commercial operations. It is an extremely significant project milestone for the local communities, Prime and all project stakeholders, as it provides long-term project stability for the development of Los Reyes.In early April, some 10 months after initial acquisition of Los Reyes, Prime announced a measured and indicated in-pit oxide mineral resource of 19.8 million tonnes (“M t”) at 1.00 gram per tonne (“gpt Au”) and 26.2 gpt silver (“gpt Ag”) containing 633,000 ounces of gold (“oz Au”) and 16,604,000 ounces silver (“oz Ag”). Additionally, the updated resource outlined an in-pit oxide mineral resource of 7.1 M t at 0.78 gpt Au and 30.0 gpt Ag (or 179,000 oz Au and 6,831,000 oz Ag contained). (See news release dated April 2, 2020).On June 12, Prime closed a C$10,000,000 financing by issuing 20,000,000 units priced at C$0.50 per unit. Each unit consisted of one common share and one common share purchase warrant exercisable for one common share at an exercise price of C$1.10 for a period of 60 months following the closing. The lead participant in the offering was Trinity Capital Partners including Mr. Pierre Lassonde.During the year Prime also announced key management changes including the appointment of Kerry Sparkes as Executive Vice President Exploration and Ian Harkas as Chief Financial Officer. Significant changes were also made to the Board of Directors. The current Board, comprising Messrs. Andy Bowering, Murray John (Chairman), Daniel Kunz, Paul Larkin, Marc Prefontaine and Paul Sweeney, has the exploration, construction and operating experience required to drive the Company forward, along with both project finance and country specific skills relating to project exploration and development in Mexico.The Company amended an option agreement with Vista Gold Inc. under which it holds Los Reyes by cancelling all of Vista’s net smelter royalty and back-in rights in consideration for accelerating a final US$1.5M option payment owing to Vista and completing a series of additional cash payments totaling US$ 2.1M. (See news release dated July 20, 2020).Los Reyes - 2020 ProgressThe Los Reyes Gold-Silver Project is a district scale epithermal gold-silver project in a prolific mining region of Mexico. Mineralization in the Los Reyes area is typical of low sulfidation epithermal gold/silver systems. Over US$20M in exploration and engineering has already been spent on Los Reyes over 25 years. Previous operators completed various prefeasibility studies but held back from development due to declining gold prices. While the initial work completed provides sufficient understanding of resources to fast-track Los Reyes to production, the work to-date has been conducted over less than 40% of the known structures. Additionally, the depth potential of what is essentially an intact epithermal gold-silver system has been inadequately explored. This leaves significant opportunities to materially expand known resources.Significant exploration progress has been made to date at Los Reyes. This ongoing work includes field mapping, trench sampling, rock alteration analysis and interpretation and re-logging of historic diamond drill core. This work led to a structural and rock alteration interpretation that is being used to guide the Company’s first diamond drill exploration program. Re-logging of several existing diamond drill core holes also identified that adularia, a crystalline mineral, containing high-grade gold and silver locally with visible gold, is associated with nearby altered rock types. The adularia appears to be vertically zoned. This zoning may provide a guide to effectively target areas of higher-grade gold and silver at depth below currently known mineralization. A study of alteration types indicates that the clay kaolinite is related to the main mineralizing event and may be considered a pathfinder to locations of higher-grade mineralization. Secondary clays may also serve to indicate higher-grade; these secondary clays include smectite, illite and montmorillonite. The initial data set was limited in size, so with the data available to-date, no assumptions can be made as to the lateral or vertical extent of gold-silver zoning. Data will continue to be collected and analyzed throughout the drill program.The Company’s 15,000 metre (“m”) Phase 1 diamond drill program began in December with the first of at least two drill rigs arriving at Los Reyes. The Phase 1 program will allow for the first wireframed and integrated geological, structural and alteration model to be developed for Los Reyes and will serve as the framework for the exploration and expansion of the known deposits and the discovery of new deposits at Los Reyes.Los Reyes - 2021 Exploration and Development PlansThe plans for 2021 include the following: 1. Add a second drill contractor in early January. 2. Expand the in-pit resources along strike and down dip. In addition, the drilling will infill areas to increase measured and indicated resources from inferred and provide silver assay data which is currently absent from parts of the historic reverse-circulation drill data. 3. Target deeper sections at Guadalupe East and other east extensions at depth for higher grade material, where drilling has yet to intersect the interpreted optimum boiling level stratigraphy for higher-grade portions of the deposits. It is believed that a significant opportunity exists to develop underground resource potential. 4. Target undrilled mineralized structures such as Fresnillo, Las Primas, Orito and newly identified structures proximal to Guadalupe. These structures offer both open pit and significant underground opportunities for resource expansion and discovery. 5. Increase access to new areas by re-habilitating existing access roads and trails. 6. Complete the Phase 1 drill program in the first half of 2021. 7. Re-model the Los Reyes deposit during the rainy season (June to October) and develop additional resource expansion targets. 8. Add infrastructure required at the project to support an expanded Phase II drill program starting in mid-October that focuses on both in-fill and resource expansion drilling. 9. Continue ongoing baseline survey work in support of the established project permitting process. 10. Continue our ongoing community engagement program.Impact of Covid-19 on 2021 PlansPrime has a focus on the importance of safety of our employees and the communities we operate in. To-date we have had minimal impact by the virus while we continue to take all reasonable measures to mitigate its potential impact and effects on our exploration and development activities. Covid-19 still has the potential to delay our plans, but we remain committed to the long-term safety of all our stakeholders including employees and host-communities.Well-funded for 2021With a cash balance of approximately C$7M, Prime ended 2020 well financed to continue with the current exploration plan into the second quarter of 2021. Additionally, the Company has a number of deeply in-the-money warrants, expiring in August 2021, that have the potential to provide an additional C$7M.QA/QC Protocols and Sampling ProceduresSurface sampling is targeting wide outcropping zones of hard quartz bearing altered bedrock. In hand dug trenches, local shallow overburden is removed to expose the mineralized bedrock material. Sample collection consists of crews, using hammers and chisels, chipping continuous 1.5 m channels to produce approximately 8 to 10 kilograms of material for each 1.5 m sample interval. The larger rocks within the collected material are then broken with a hammer to homogenize them to a standard size. On a canvas mat the collected material is mixed, divided, and bagged. The bagged samples are then trucked to a lab for prep and assay. Similar samples are also collected from exposed road cuts and from open underground adit areas across mapped and unmapped structures. True widths of mineralized zones have not been calculated from the surface samples except where specified. Assay results range from below detection to 48.30 g/t gold and 1,250.0 g/t silver. Composite intervals use a cut-off grade of 0.2 g/t gold.Quality control of the sampling program includes the insertion of reference standards and blanks as well as reject duplicate analysis to monitor the integrity of assay results. All samples are stored until picked up by Bureau Veritas Minerals and transported to its laboratory in Durango, Mexico. Samples are then dried, crushed, split and pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption spectroscopy (AAS) finish, and silver plus 34 other elements by multi-acid digestion and ICP finish, over-limits by fire assay and gravimetric finish. Bureau Veritas is an ISO/IEC accredited laboratory.Kerry Sparkes, P.Geo., Executive Vice President of Exploration, is a qualified person for the purposes of National Instrument 43-101 and has reviewed and approved the technical content in this news release.About Prime Mining Corp (TSX.V: PRYM) (OTCQB:PRMNF)Prime is an ideal mix of successful capital markets and mining executives and experienced local exploration personnel who are expanding the exploration initiative at the historically productive Los Reyes gold and silver project in Sinaloa, Mexico. Current Measured and Indicated pit-constrained oxide mineral resources for the Property total 19.8 million tonnes at 1.0 g/t Au, plus 26.2 g/t Ag (or 633,000 oz Au, plus 16.6 million oz Ag contained). Los Reyes holds substantial resource upside based on open extensions of known resources, ten kilometres of undrilled strike length and at least eight additional exploration targets. Prime Mining has a well-planned capital structure with significant management and insider ownership.ON BEHALF OF THE BOARD OF DIRECTORSDaniel Kunz Chief Executive Officer For further information, please contact:Daniel Kunz Chief Executive Officer and Director Prime Mining Corp. 1307 S. Colorado Ave. Boise, Idaho 83706 Telephone: 1-208-926-6379 office email: dan@dkunzassoc.comAndrew Bowering Executive Vice President and Director Prime Mining Corp. 1507 – 1030 West Georgia Street Vancouver, BC, V6E 2Y3 Telephone: (604) 428-6128 Facsimile: (604) 428-6430 E: andy@primeminingcorp.caNeither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.Forward Looking InformationInformation set forth in this document may include forward-looking statements. While these statements reflect management's current plans, projections, and intents, by their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond the control of the Company. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on these forward-looking statements. There is no assurance the transactions noted above will be completed on the terms as contemplated, or at all. The Company’s actual results, programs, activities, and financial position could differ materially from those expressed in or implied by these forward-looking statements.

    • CORRECTION - Prime Mining Corp.
      GlobeNewswire

      CORRECTION - Prime Mining Corp.

      VANCOUVER, British Columbia, Dec. 14, 2020 (GLOBE NEWSWIRE) -- In a release issued earlier today by Prime Mining Corp. (the “Company”) (TSX.V: PRYM) (OTCQB: PRMNF) (Frankfurt: A2PRDW), please note multiple changes have been made throughout including but not limited to the period being identified as “Q2 2021” in the headline, rather than “Q2 2020” as originally issued. The corrected release follows:Prime Mining Reports Operating and Financial Results for Q2 2021Prime Mining Corp. (the “Company”) (TSX.V: PRYM) (OTCQB: PRMNF) (Frankfurt: A2PRDW) is pleased to report its operating and financial results for the second quarter of fiscal year 2021, ended October 31, 2020. Unless otherwise stated, all amounts are presented in Canadian dollars (“C$”).Prime Mining is focused on the development of the Los Reyes Gold-Silver Deposit in Sinaloa Mexico.Prime Mining’s Chief Executive Officer Daniel Kunz commented, “We are extremely pleased with the continued progress made during the quarter as Prime Mining and our Los Reyes project continue to evolve. The appointment of three key individuals both corporately and in operations has materially strengthened our management team. On the ground, we continued our comprehensive exploration program of field mapping, core re-logging and trench sampling. In December we started our highly anticipated diamond drill program, which now has been expanded from 10,000 metres to 15,000 metres, intended to upgrade and expand the current resource and test high-potential targets defined by our surface mapping and core re-logging program.”CORPORATE HIGHLIGHTSThe Company was pleased to welcome three additions to senior management.On August 4th Ian Harcus was appointed Chief Financial Officer (CFO), bringing over 12 years of financial and accounting experience. As a Chartered Professional Accountant, he has an extensive background in financial management and reporting, corporate transactions and working with international jurisdictions including Mexico. Prior to joining Prime, he served as CFO and Vice President Finance at Alio Gold Inc., prior to its acquisition by Argonaut Gold Inc. He has held public accounting positions with Grant Thornton LLP and Ernst and Young.On October 13th Kerry Sparkes was appointed Executive Vice President – Exploration. As a registered professional geologist and Qualified Person in British Columbia and Newfoundland, he brings over 30 years of experience in the mineral exploration as an exploration geologist and a senior mining executive.  Mr. Sparkes recently retired after 7 years as Vice President Geology for Franco-Nevada Corporation and co- founder and director of Orla Mining Ltd. He also serves as a director of Aurion Resources Ltd. On October 13th Mario Castellanos was appointed as Project Manager to provide day-to-day management of the Los Reyes exploration program. Ing. Castellanos is a geologist and a Principal of Resource Geosciences Incorporated, a company with over 20 years’ experience working on exploration projects in Mexico.The Company’s Board of Directors has approved the granting of incentive stock options to a consultant to purchase up to 125,000 common shares in the capital stock of the Company, at a price of $1.75 per share, for a period of 5 years from the grant date. The options will vest 1/3 immediately as of the date of grant; 1/3 six months after the date of the grant; and 1/3 twelve months after the date of the grant. This stock option grant is subject to acceptance by the TSX Venture Exchange.EXPLORATION HIGHLIGHTSSignificant exploration progress has been made at Los Reyes including: * Field mapping, trench sampling and re-logging of historic diamond drill core, which aided the initial structural and rock alteration interpretations prior to the commencement of drilling. * The Company’s first diamond drill program began on December 1. Based on targets identified to-date, this Phase 1 drill program has been expanded from 10,000 metre (“m”) to 15,000 m. * The diamond drill program results, coupled with the 8 known deposits, are key to development of the first wireframed and integrated geological, structural and alteration model to serve as the framework for advanced exploration and discovery of new deposits at Los Reyes. * Drilling will initially focus on the Zapote North, Zapote South-Tahonitas, San Miguel and Noche Buenos deposits and their associated structural trends. The objective of Phase I drilling is to upgrade Inferred resource category material to Measured and Indicated resource categories; drill into the up and down dip areas to infill and expand the deposits; acquire silver assays in certain areas where they are absent in the historical data, and test new targets developed from surface mapping, re-logging and re-interpretation of the geology at Los Reyes.   * This Phase 1 drill program will provide an initial test of our exploration model and is expected to be completed by June 2021. A follow-up drill program that tests the ultimate potential of the eight or more deposits at Los Reyes is planned for the second half of 2021 recognizing that drilling will be halted from mid-August through September during the peak rainy season. To date we have completed over 6,226 assay samples for approximately 8,200 m. The breakdown includes 3,457 trench samples and 2,769 road and prospecting samples.On August 19th, the Company reported more significant surface mineralization at Los Reyes. Surface trench * Surface trench NB-4490N returned 42.0 m at 1.93 grams per tonne (“g/t” gold (“Au”) and 25.7 g/t silver (“Ag”)).  Based on area mapping, trench NB-4490N has an 18.0 m estimated true width (“etw”). This trench included a 9.0 m interval (4.0 m etw) with 7.46 g/t Au and 98.1 g/t Ag.  Sampling started in mineralization and crews are extending the trench to ensure the full width of the zone is tested. * These results show that grades and widths of the mineralized structure at the south end of Noche Buena are consistent with subsurface historic drilling results. Noche Buena remains open along southeast strike. On October 26th, the Company reported sampling results from Guadalupe East continues to demonstrate resource expansion potential. * Rock chip sampling inside the old, existing mine adit GE-Adit 17 returned 2.21 g/t Au and 95 g/t Ag over 46 m, including 29.0 g/t Au and 226 g/t Ag over 2.0 m. * Two other veins in GE-Adit 17 were also sampled, returning 0.84 g/t Au and 37.7 g/t Ag over 4.5 m and 0.76 g/t Au and 23.6 g/t Ag over 6.0 m, respectively.  These veins may be a continuation of the San Manual vein system and the results suggest that the Guadalupe system remains open to the east where historic drilling has not occurred. * Sampling results from existing mine adit GL-Adit 20 returned 1.69 g/t Au and 62.3 g/t Ag over 19.5 m, including 4.55 g/t Au and 121.4 g/t Ag over 3.0 m.  * Results from existing adit GE-Adit 25, further to the north, returned gold and silver mineralization that demonstrates this part of the San Manuel vein system within Guadalupe is also underexplored and merits additional exploration work. Q2 2021 FINANCIAL HIGHLIGHTS Q2 2021Q1 2021 Net Loss(1,656,466)(2,338,461)  October 31, 2020April 30, 2020 Cash, cash equivalents and short-term investments7,678,9591,020,820 Total Assets21,590,03510,360,210 Total Current Liabilities655,5451,799,678 Total Liabilities1,668,2471,863,982 Total Shareholders’ equity19,921,7888,496,228 QA/QC Protocols and Sampling ProceduresSurface sampling is targeting wide outcropping zones of hard quartz bearing altered bedrock. In hand dug trenches, local shallow overburden is removed to expose the mineralized bedrock material. Sample collection consists of crews, using hammers and chisels, chipping continuous 1.5 m channels to produce approximately 8 to 10 kilograms of material for each 1.5 m sample interval. The larger rocks within the collected material are then broken with a hammer to homogenize them to a standard size. On a canvas mat the collected material mixed, divided, and bagged. The bagged samples are then trucked to a lab for prep and assay. Similar samples are also collected from exposed road cuts and from open underground adit areas across mapped and unmapped structures. True widths of mineralized zones have not been calculated from the surface samples except where specified. Assay results range from below detection to 48.30 g/t gold and 1,250.0 g/t silver. Composite intervals use a cut-off grade of 0.2 g/t gold.Quality control of the sampling program includes the insertion of reference standards and blanks as well as reject duplicate analysis to monitor the integrity of assay results. All samples are stored until picked up by Bureau Veritas Minerals and transported to its laboratory in Durango, Mexico. Samples are then dried, crushed, split and pulp samples are prepared for analysis. Gold is determined by fire assay with an atomic absorption spectroscopy (AAS) finish, and silver plus 34 other elements by multi-acid digestion and ICP finish, over-limits by fire assay and gravimetric finish. Bureau Veritas is an ISO/IEC accredited laboratory.Kerry Sparkes, P.Geo., Executive Vice President of Exploration, is a qualified person for the purposes of National Instrument 43-101 and has reviewed and approved the technical content in this news release.Los Reyes Gold and Silver ProjectThe Los Reyes Gold-Silver Project is district scale epithermal gold-silver project in a prolific mining region of Mexico. Mineralization in the Los Reyes area is typical of low sulfidation epithermal gold/silver systems. Over $20 million in exploration and engineering has already been spent on the project over 2 1/2 decades. Previous operators completed various prefeasibility studies and plans yet held back from development due to declining gold prices. While work completed has provided sufficient understanding of resources to fast-track Los Reyes to production, the bulk of work at Los Reyes has been conducted over less than 40% of the known structures leaving significant opportunity to expand known resources. Current Measured and Indicated pit-constrained oxide mineral resources for the Property include 19.8 million tonnes containing 633,000 oz Au at 1.0 gpt and 16,604,000 oz Ag at 26.2 gpt. Los Reyes holds substantial resource upside based on open extensions of known resources, ten kilometres of undrilled strike length and at least eight additional exploration targets.About Prime Mining Corp (TSX.V: PRYM) (OTCQB:PRMNF)Prime is an ideal mix of successful capital markets and mining executives and experienced local exploration personnel who are expanding the exploration initiative at the historically productive Los Reyes gold and silver project in Sinaloa, Mexico. Current Measured and Indicated pit-constrained oxide mineral resources for the Property include 19.8 million tonnes containing 633,000 ounces of gold at 1.0 g/t and 16,604,000 ounces of silver at 26.2 g/t. Inferred pit-constrained oxide mineral resources include 7.1 million tonnes containing 179,000 ounces of gold at 0.78 g/t and 6,831,000 ounces of silver at 30.0 g/t. Los Reyes holds substantial resource upside based on open extensions of known resources, ten kilometres of undrilled strike length and at least eight additional exploration targets. Prime Mining has a well-planned capital structure with significant management and insider ownership.ON BEHALF OF THE BOARD OF DIRECTORSDaniel Kunz Chief Executive OfficerFor further information, please contact:Daniel Kunz Chief Executive Officer and Director Prime Mining Corp. 1307 S. Colorado Ave. Boise, Idaho 83706 Telephone: 1-208-926-6379 office email: dan@dkunzassoc.comAndrew Bowering Executive Vice President and Director Prime Mining Corp. 1507 – 1030 West Georgia Street Vancouver, BC, V6E 2Y3 Telephone: (604) 428-6128 Facsimile: (604) 428-6430 E: andy@primeminingcorp.caNeither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.Forward Looking InformationInformation set forth in this document may include forward-looking statements. While these statements reflect management's current plans, projections and intents, by their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond the control of the Company. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on these forward-looking statements. There is no assurance the transactions noted above will be completed on the terms as contemplated, or at all. The Company’s actual results, programs, activities and financial position could differ materially from those expressed in or implied by these forward-looking statements.