U.S. Markets open in 8 hrs 15 mins

Robex Resources Inc. (RBX.V)

TSXV - TSXV Real Time Price. Currency in CAD
Add to watchlist
0.3900-0.0350 (-8.24%)
At close: 3:58PM EST
Full screen
Gain actionable insight from technical analysis on financial instruments, to help optimize your trading strategies
Chart Events
Neutralpattern detected
Previous Close0.4250
Open0.4200
Bid0.3900 x 0
Ask0.4000 x 0
Day's Range0.3900 - 0.4200
52 Week Range0.1100 - 0.5600
Volume267,403
Avg. Volume160,301
Market Cap228.093M
Beta (5Y Monthly)1.00
PE Ratio (TTM)8.30
EPS (TTM)0.0470
Earnings DateApr 28, 2020
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateSep 15, 2020
1y Target EstN/A
  • What You Need To Know About Robex Resources Inc.'s (CVE:RBX) Investor Composition
    Simply Wall St.

    What You Need To Know About Robex Resources Inc.'s (CVE:RBX) Investor Composition

    Every investor in Robex Resources Inc. (CVE:RBX) should be aware of the most powerful shareholder groups. Institutions...

  • Robex Resources Inc.: Vivo Energy and Robex to Set up a Solar Power Plant at the Nampala Mine
    GlobeNewswire

    Robex Resources Inc.: Vivo Energy and Robex to Set up a Solar Power Plant at the Nampala Mine

    QUEBEC CITY, Oct. 27, 2020 (GLOBE NEWSWIRE) -- Robex Resources Inc. (“Robex” or “the Company”) (TSXV: RBX/FWB: RB4) and Vivo Energy, which sells and distributes Shell and Engen branded fuels and lubricants in Africa, have reached an agreement for Vivo Energy to supply solar energy to the Nampala mine for a period of five to fifteen years. Christian Chammas, CEO of Vivo Energy, made the following comments about the transaction: “This project with Robex is Vivo Energy’s first contract with one of our commercial customers to supply fuel, combined with a hybrid solar energy solution. We believe that there are many advantages of our innovative partnership to provide a comprehensive energy solution to our commercial customers and we look forward to extending our offer to our current and future customers to help them reduce their costs and CO2 emissions.”Benjamin Cohen, CEO of Robex, commented on the transaction by stating: "We are proud to introduce solar energy into our mining business. This energy will enable us to reduce our carbon impact by approximately 60,000 tonnes over ten years, provide us with a complementary source of energy to stabilize our electricity production and reduce our production costs, which are among the lowest in the world. This facility is expected to reduce the cost of the KW currently consumed by the mine operations by $ 0.04.”This project includes a 3.9 MWp photovoltaic power plant and a battery capacity of 2.6 MWh which, thanks to the energy management system, will be fully integrated into the mine’s existing thermal power plant.Khadidiatou Fall, the new General Manager of Vivo Energy Mali, added: “I’m very excited about the idea of embarking on this revolutionary project. Our mining clients are always looking for ways to reduce their operational costs and improve their sustainability. With this hybrid solar/fuel solution, we can help them achieve both goals.”The company President, Mr. Georges Cohen, added: “I’m very pleased to have reached this agreement, which is in line with our long-term vision for our operations on this deposit. It will allow us to further improve our profitability, reduce our dependence on fossil fuels and significantly improve our impact on the environment. This project reinforces our environmental policy and reflects our desire to participate in the fight against global warming and to reduce our environmental footprint. I would like to thank Vivo Energy for having placed its trust in us and for working with us on this successful project.” About ROBEXRobex Resources Inc. is a Canadian mining company operating in gold production and exploration in West Africa. The Company operates the Nampala mine in Mali, which reached the commercial production stage on January 1, 2017.For information:Robex Resources Inc.Benjamin Cohen, CEO Augustin Rousselet, CFO/COO Head office: (581) 741-7421 info@robexgold.comThis news release contains statements that may be considered “forecast information” or “forecast statements” in terms of security rights. These forecasts are subject to uncertainties and risks, some of which are beyond the control of Robex. Achievements and final results may differ significantly from forecasts made implicitly or explicitly. These differences can be attributed to many factors, including market volatility, the impact of the exchange rate and interest rate fluctuations, mispricing, the environment (hardening of regulations), unforeseen geological situations, unfavourable operating conditions, political risks inherent in mining in developing countries, changes in government policies or regulations (laws and policies), an inability to obtain necessary permits and approvals from government agencies, or any other risk associated with mining and development. There can be no assurance that the circumstances set out in these forecasts will occur, or even benefit Robex, if any. The forecasts are based on the estimates and opinions of the Robex management team at the time of publication. Robex makes no commitment to make any updates or changes to these publicly available forecasts based on new information or events, or for any other reason, except as required by applicable security laws. The TSX Venture Exchange or the Regulation Services Provider (as defined in the policies of the TSX Venture Exchange) assumes no responsibility for the authenticity or accuracy of this news release.

  • Robex Resources Inc.: With 391,000 Ounces of Probable Mineral Reserves, Robex Expects a Mine Life of Nearly 9 Years for Nampala
    GlobeNewswire

    Robex Resources Inc.: With 391,000 Ounces of Probable Mineral Reserves, Robex Expects a Mine Life of Nearly 9 Years for Nampala

    QUEBEC CITY, Oct. 25, 2020 (GLOBE NEWSWIRE) -- Robex Resources Inc. (“Robex” or “the Company”) (TSXV: RBX/FWB: RB4) announces that it has filed with SEDAR the technical report titled “NI 43-101 Technical Report, Mineral Resource and Mineral Reserve Estimates for the Nampala Gold Mine (2020)” signed and dated October 23, 2020. The latest Mineral Resource Estimate (2020 MRE) and the Mineral Reserve Estimate (2020 MR) are summarized in the next paragraphs. They required an update for the following motives: * The Nampala Phase 4, containing 410 drill holes, added a total of 34,998 m to the geological database. These drill holes were mainly drilled east of the current open pit. * The price of gold has increased significantly in the last year. The last Mineral Resource Estimate (2019 MRE) used a price of gold of USD 1250/oz. This value was increased to USD 1700/oz. for the 2020 MRE and to USD 1500/oz. for the 2020 MR. * The density model was updated to take into account the results from the mine-to-mill mass balance completed in 2020. * Mineralized material contained in the Upper Transition weathering horizon was metallurgically tested in 2019-2020. The average tests returned some suitable recovery rates of 86.8% and 88.0% for two sampled populations.Mineral Resource Estimate (2020 MRE):On July 31, 2020, the Mineral Resource in the Indicated category was estimated at 37,887,000 t at a grade of 0.71 g/t Au and a metal content of 869 000 oz. of gold. The Mineral Resource in the Inferred category was estimated at 2,989,000 t at a grade of 0.69 g/t Au and a metal content of 66 000 oz. of gold (Table 1). The presented Mineral Resource includes the Mineral Reserve.Table 1: Mineral Resource Estimate (2020 MRE)CategoryCut-Off Au (g/t)Weathering typeTonnage (000 t)Grade Au (g/t)Metal content Au (000 oz.)    Indicated0.25Oxide21,4220.63435  0.33Transition6,1580.82163  0.31Fresh Rock10,3070.82271  Subtotal37,8870.71869  Inferred0.25Oxide5420.5510  0.33Transition2130.715  0.31Fresh Rock2,2350.7252  Subtotal2,9890.6966  Total40,8760.71936  Notes regarding Table 1:1. The independent and qualified persons for the Mineral Resource estimate, as defined by NI 43-101, are Mr. Denis Boivin, B.Sc., Geo. (OGQ 816) and Mr. Mario Boissé, Mining Eng. (OIQ 130715), and the effective date of the estimate is July 31, 2020. 2. The mineral resource is not a mineral reserve as it has not demonstrated economic viability. Further metallurgical testing is required to analyze the economic potential of the mineral resource found in the transition and fresh rock zones. 3. The mineral resource estimate follows the 2014 CIM definitions and guidelines. 4. Results are presented on-site and undiluted for the open-pit scenario and are considered to have reasonable prospects for profitable mining. 5. In terms of classification: the distance to the closest (composite) point (DCP) must be less than or equal to 30 meters to be considered an indicated resource. The inferred resource is at a distance greater than 30 meters and less than 100 meters. 6. Grade interpolation was performed on the Nampala mining permit from 2-metre drill composites using the grade of the material assayed and clipped at 15 g/t Au. The grade model was interpolated according to the structural patterns of the mineralized zones using the Leapfrog Geo v5.1.0 software Radial Basis Function (RBF) method and assessed in a model pointed at 20 degrees North with blocks of the same size (5 m x 15 m x 5 m). On-site densities were interpolated using the respective oxidation levels. 7. The mineral resource is contained within an economic envelope built with the MineSight - Project Evaluator V1.0.4.3902 Lerch-Grossman optimization tool. Only the indicated resource is taken into account to generate the economic envelope. The following economic parameters were used in the optimization (Table 2): Table 2: Input parameters used for cut-off grade estimateParametersUOMOxideTransitionFresh Rock Gold priceUSD/oz1700 Mining costUSD/t mined2.082.512.65 G&A costUSD/t milled2.482.482.48 Processing cost*USD/t milled9.3110.24- Heap Leach cost*USD/t milled--9.19 Mill recovery%88.971.9- Heap Leach recovery%--70 Optimizer Cut-off gradeg/t0.250.330.31 *Includes transport and refining cost 8. The slope of the economic envelope is set to 45 degrees. 9. The number of metric tons has been rounded to the nearest thousand and the metal grade is presented in troy ounces (tons x grade / 31.10348). Any discrepancies between totals are due to rounding effects. Rounding practices comply with the recommendations outlined in Form 43-101A1. 10. Except for the political instability in Mali and the current COVID-19 pandemic, Denis Boivin P.Geo and Mario Boissé Eng. are not aware of any environmental, permits, legal, title-related, fiscal, sociopolitical or marketing issues, or any other relevant issues that could have a significant impact on the Mineral Resource estimate. Mineral Reserve Estimate (2020 MR): On July 31, 2020, the Mineral Reserve was estimated at 17,147,000 t of oxidized ore and Upper Transition with a metal content of 391 000 oz. of gold (Table 3). The average grade was 0.71 g/t using a cut-off of 0.28 g/t in the Oxide and 0.31 g/t in the Upper Transition. The Mineral Reserve estimate (2020 MR) presents a LOM of almost 9 years.Table 3: Nampala mine Probable Mineral ReserveWeathering typeProbable Mineral Reserve  Cut-Off Au (g/t)Tonnage (000 t)Grade Au (g/t)Metal Content Au (000 oz.)    Oxide0.2815,2910.69339  Upper Transition0.311,8570.8752  Lower TransitionN/A     Fresh RockN/A     Total 17,1470.71391  Notes regarding Table 3:1. The independent and qualified persons for the Mineral Reserve Estimate, as defined by NI 43-101, are Mr. Denis Boivin, B.Sc., Geo. (OGQ 816) and Mr. Mario Boissé, Mining Eng. (OIQ 130715), and the effective date of the estimate is July 31, 2020. 2. Reported in accordance with Canadian Institute of Mining, Metallurgy and Petroleum (CIM) standards 3. Constituted of Oxide and Upper Transition ore only; 4. Based on a Pit Shell that does not include Inferred Material. In that case, the DCP must be inferior or equal to 30 m to be considered indicated; 5. Classified as probable; 6. Included in the Mineral Resource; 7. Identified as minable using standard open-pit mining only; 8. Located within 7 pit designs based on a Pit Shell; 9. Excluding Lower Transition and Fresh Rock mineralization as current ore processing infrastructures may be unsuitable if the ore is refractory or too hard for the current processing equipment. For calculation purposes, the recovery was set at 0% for Lower Transition and Fresh Rock, which is very conservative; 10. Taking into account a mining recovery of 97%; 11. Assuming a dilution factor of 0% based on the composites used to interpolate the grade in the block model, the current ore control process, the mining method and the ore body characteristics; 12. Excluding any pit design that would be smaller than 100 m in diameter; 13. Used as a base for the life of mine (LOM) production plan; 14. Grade interpolation was performed on the Nampala mining permit from 2-metre drill composites using the grade of the material assayed and clipped at 15 g/t Au. The grade model was interpolated according to the structural patterns of the mineralized zones using the Leapfrog Geo v5.1.0 software Radial Basis Function (RBF) method and assessed in a model pointed at 20 degrees North with blocks of the same size (5 m x 15 m x 5 m). On-site densities were interpolated using the respective oxidation levels; 15. The mineral reserve is contained within the 7 pit designs. The base for the pit designs is an economic envelope built with the MineSight - Project Evaluator V1.0.4.3902 Lerch-Grossman optimization tool. The following economic parameters are used in the optimization (Table 4): Table 4: Input parameters used for cut-off grade estimateParametersUOMOxideUpper TransitionLower TransitionFresh Rock Gold priceUSD/oz1500 Mining costUSD/t mined2.082.512.512.65 G&A costUSD/t milled2.482.482.482.48 Processing cost*USD/t milled9.3110.2410.24- Heap Leach cost*USD/t milled-- 9.19 Mill recovery%88.986.00- Heap Leach recovery%---0 Optimizer Cut-off gradeg/t0.280.31-- *Includes transport and refining cost 16. The slope of the economic envelope is set to 40 degrees for the first 20 m then follows an angle of 45 degrees; 17. The number of metric tons has been rounded to the nearest thousand and the metal grade is presented in troy ounces (tons x grade / 31.10348). Any discrepancies between totals are due to rounding effects. Rounding practices comply with the recommendations outlined in Form 43-101A1. Denis Boivin, P.Geo., on-site consulting geologist, is the qualified and independent person under NI 43-101 who has reviewed and approved the disclosure of the geological information contained in this press release.Benjamin Cohen says “I would like to thank the technical teams who have done an unbelievable job in particularly difficult conditions with Covid-19 and a terrible rainy season that has caused delays.We are very pleased with these first results for our shareholders, employees and village communities because the horizon has been pushed back.The exploration work continues very intensely; we are confident about the future; we are awaiting results for the southern and western areas in particular.The work carried out has already allowed us to open a second pit that will provide a second source of ore to stabilize the production grade.Restoring a satisfactory mine life was one of our main objectives, this creates value and confidence to find more gold in the near future.”About ROBEXRobex Resources Inc. is a Canadian mining company operating in gold production and exploration in West Africa. The Company operates the Nampala mine in Mali, which reached the commercial production stage on January 1, 2017.For information:Robex Resources Inc.Benjamin Cohen, CEO Augustin Rousselet, CFO/COO Head office: (581) 741-7421 info@robexgold.comThis news release contains statements that may be considered “forecast information” or “forecast statements” in terms of security rights. These forecasts are subject to uncertainties and risks, some of which are beyond the control of Robex. Achievements and final results may differ significantly from forecasts made implicitly or explicitly. These differences can be attributed to many factors, including market volatility, the impact of the exchange rate and interest rate fluctuations, mispricing, the environment (hardening of regulations), unforeseen geological situations, unfavourable operating conditions, political risks inherent in mining in developing countries, changes in government policies or regulations (laws and policies), an inability to obtain necessary permits and approvals from government agencies, or any other risk associated with mining and development. There can be no assurance that the circumstances set out in these forecasts will occur, or even benefit Robex, if any. The forecasts are based on the estimates and opinions of the Robex management team at the time of publication. Robex makes no commitment to make any updates or changes to these publicly available forecasts based on new information or events, or for any other reason, except as required by applicable security laws. The TSX Venture Exchange or the Regulation Services Provider (as defined in the policies of the TSX Venture Exchange) assumes no responsibility for the authenticity or accuracy of this news release.