U.S. Markets open in 4 hrs 33 mins

Tombstone Exploration Corporation (TMBXF)

Other OTC - Other OTC Delayed Price. Currency in USD
Add to watchlist
1.8600-0.0600 (-3.12%)
At close: 9:58AM EDT
Full screen
Trade prices are not sourced from all markets
Gain actionable insight from technical analysis on financial instruments, to help optimize your trading strategies
Chart Events
Neutralpattern detected
Previous Close1.9200
Open1.8600
BidN/A x N/A
AskN/A x N/A
Day's Range1.8600 - 1.8600
52 Week Range1.5300 - 3.0900
Volume200
Avg. Volume765
Market Cap20.424M
Beta (5Y Monthly)-0.80
PE Ratio (TTM)N/A
EPS (TTM)-0.1560
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • Tombstone Exploration Corporation Announces Production Has Started at the Bonanza Harquahala Mine
    GlobeNewswire

    Tombstone Exploration Corporation Announces Production Has Started at the Bonanza Harquahala Mine

    PHOENIX, July 13, 2021 (GLOBE NEWSWIRE) -- Tombstone Exploration Corporation (OTCQB: TMBXF), a fully reporting U.S. based mining company, announced today in combination with Goldrock Resources Inc. and the Bonanza Mining Company the first pour from production. First results have been received from production in June that started at the Bonanza Harquahala Mine. Production of 83.7 oz of Dore was stripped from the Bonanza’s activated carbon by Metals Research and sent to Metalore Inc. for final dis

  • Tombstone Exploration Corporation Announces Leaching Has Commenced at the Bonanza Harquahala Mine
    GlobeNewswire

    Tombstone Exploration Corporation Announces Leaching Has Commenced at the Bonanza Harquahala Mine

    PHOENIX, June 08, 2021 (GLOBE NEWSWIRE) -- Tombstone Exploration Corporation (OTCQB: TMBXF), a fully reporting U.S. based mining company, announced today in combination with Goldrock Resources Inc. and the Bonanza Mining Company that the leach process has commenced. The leaching has commenced at the Bonanza Harquahala Mine which started on June 3, 2021 when the pH levels increased to allow for safe sustained leaching. Approximately 35,000 tons of rock have been placed on the leach pad with the e

  • Tombstone Exploration Corporation Announces Solution Recirculating Has Started for the Leach Process
    GlobeNewswire

    Tombstone Exploration Corporation Announces Solution Recirculating Has Started for the Leach Process

    PHOENIX, May 13, 2021 (GLOBE NEWSWIRE) -- Tombstone Exploration Corporation (OTCQB: TMBXF), a fully reporting U.S. based mining company, announced today in combination with Goldrock Resources Inc. and the Bonanza Mining Company that recirculation of solution started on the leach pad as 25,000 tons of crushed rock is now in place and fully stacked. Recirculation is the first step to starting leaching. Recirculation of water is required to start building protective alkalinity and check the pumps and equipment to ensure proper long-term operation. Approximately 150 gallons per minute is being recirculated. The next step will be to start circulating water within the 25,000 tons of crushed and stacked leach pad material. Water is required to saturate the heap leach pad material and allow flow through the heap material similar to water through coffee grounds. Piping and irrigation drippers are currently being installed from previously purchased material. The drippers will be installed on the top of stacked material over the next couple of days. It may take several days for solution to saturate the heap and flow out the bottom. Upon saturating the leach pad material with water, along with a good recirculation flow rate maintained and protective alkalinity being maintained, cyanide will then be added and leaching of gold will start. An additional 475,000 tons of mined rock will continue to be loaded on the pad over the coming months. Alan Brown, Tombstone Exploration President & CEO, commented, “This is a milestone event as we are starting to add solution to the heap and gold & silver production should follow in a relatively short time.” The Bonanza Mine property includes the Harquahala and Golden Eagle mines, located approximately eight miles south of Salome, Arizona. The project totals 2,656 acres and has significant underground workings. Once leaching has started, periodic delivery of the carbon to the designated gold processing facility is expected and we have fully committed processing and gold refiners in place. About Tombstone Exploration Corporation Tombstone Exploration Corporation is a gold, silver and copper exploration & mining company based in Phoenix, Arizona. The Company’s goal is to maximize shareholder value through focused exploration, testing and development of high-quality mineral targets in the prolific mineral producing areas in the Southwest United States. This goal will be achieved through the application of the best mineral exploration practices and techniques available, including the adherence to the highest possible standards of corporate responsibility, governance and conduct. FORWARD-LOOKING STATEMENTS This release contains statements that constitute forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. These statements appear in a number of places in this release and include all statements that are not statements of historical fact regarding the intent, belief or current expectations of Tombstone Exploration Corporation, its directors or its officers with respect to, among other things: (i) financing plans; (ii) trends affecting its financial condition or results of operations; (iii) growth strategy and operating strategy. The words “may,” “would,” “will,” “expect,” “estimate,” “can,” “believe,” “potential” and similar expressions and variations thereof are intended to identify forward-looking statements. Investors are cautioned that any such forward- looking statements are not guarantees of future performance and involve risks and uncertainties, many of which are Tombstone Exploration Corporation’s ability to control, and actual results may differ materially from those projected in the forward-looking statements as a result of various factors. More information about the potential factors that could affect the business and financial results is and will be included in Tombstone Exploration Corporation’s filings with the Securities and Exchange Commission. CONTACT: Tombstone Exploration CorporationAlan M. Brown, President & CEOPhone: 480-588-8920abrown@tombstonemining.com www.tombstonemining.comTwitter: @Tombstonecorp