ZN191220P00001000

OPR - OPR Delayed Price. Currency in USD
0.7500
0.0000 (0.00%)
As of 12:15AM EDT. Market open.
Stock chart is not supported by your current browser
Previous Close0.7500
OpenN/A
Bid0.0000
Ask4.5000
StrikeN/A
Expire Date2019-12-20
Day's Range0.7500 - 0.7500
Contract RangeN/A
VolumeN/A
Open Interest6
  • Zion Oil & Gas Finishes Data Acquisition for Largest Onshore 3-D Seismic Survey in Israel's History
    PR Newswire

    Zion Oil & Gas Finishes Data Acquisition for Largest Onshore 3-D Seismic Survey in Israel's History

    DALLAS and CAESAREA, Israel, Oct. 16, 2019 /PRNewswire/ -- Zion Oil & Gas, Inc. (ZN) announces the completion of data acquisition for its Megiddo-Jezreel 3-D seismic program. "The crew has successfully completed the recording of the Megiddo-Jezreel 3-D seismic program, and our contractor logged over 19,000 manhours incident-free along with zero environmental damage," Zion's COO, Robert Dunn said. "Not only is it the largest 3-D survey in Israel's history, but the data acquisition was completed within a time frame not thought possible due to the hard work, determination, faith, and courage of our team," stated Zion's President, Bill Avery.

  • Zion Oil & Gas Begins 3-D Seismic Acquisition in Israel
    PR Newswire

    Zion Oil & Gas Begins 3-D Seismic Acquisition in Israel

    DALLAS and CAESAREA, Israel, Sept. 25, 2019 /PRNewswire/ -- Zion Oil & Gas, Inc. (ZN) announces the commencement of data acquisition for its Megiddo-Jezreel 3-D seismic program. "Within the first week over 30 square kilometers of equipment has been deployed for the start of the largest onshore 3-D survey in Israel's history," Zion's COO, Robert Dunn said.

  • Zion Oil & Gas Signs Agreement to Begin 3-D Seismic Acquisition in Israel
    PR Newswire

    Zion Oil & Gas Signs Agreement to Begin 3-D Seismic Acquisition in Israel

    DALLAS and CAESAREA, Israel, Aug. 15, 2019 /PRNewswire/ -- Zion Oil & Gas, Inc. (ZN) announces they have signed an agreement for geophysical acquisition services with  Acoustic Geophysical Services KFT ("AGS"), an international seismic company based in Budapest, Hungary. "We estimate that the vessels carrying the trucks and equipment will arrive by the end of August," Zion's COO, Robert Dunn said. "We are pleased with our progress to date on this important 3-D seismic survey," stated Zion's President, Bill Avery.

  • Zion Oil & Gas Enters into Binding Agreements in Israel
    PR Newswire

    Zion Oil & Gas Enters into Binding Agreements in Israel

    DALLAS and CAESAREA, Israel, July 17, 2019 /PRNewswire/ -- Zion Oil & Gas, Inc. (ZN) announces it has entered into binding agreements for 3-D seismic landowner permitting services and for consulting services in connection with the required approvals from the Israel Ministries of Transportation and Communication  for  importation of the seismic equipment. "The biblically inspired vision of Zion Oil & Gas remains to discover oil and gas onshore in Israel," Zion's CEO, John Brown said.

  • Zion Oil & Gas Announces Launch of New Unit Program
    PR Newswire

    Zion Oil & Gas Announces Launch of New Unit Program

    DALLAS and CAESAREA, Israel, April 24, 2019 /PRNewswire/ -- Zion Oil & Gas, Inc. (ZN) announces that it is making available a new unit program under its continuing Dividend Reinvestment and Common Stock Purchase Plan ("DSPP") in its going forward plans as outlined in the November 29th, 2018 press release. The vision of Zion Oil & Gas remains to help Israel become energy independent, and in doing so, use Zion's projects as a platform to share the gospel of Jesus Christ worldwide.  That vision has not changed.

  • Israel's Petroleum Commissioner Approves Exploration License Extension Through December 2, 2020
    PR Newswire

    Israel's Petroleum Commissioner Approves Exploration License Extension Through December 2, 2020

    DALLAS and CAESAREA, Israel , March 5, 2019 /PRNewswire/ -- Zion Oil & Gas, Inc. (NASDAQ: ZN) announces that it has received an extension on its Megiddo-Jezreel License until December 2, 2020 . Zion submitted ...

  • Zion is Moving Forward With Operational Plan in Israel
    PR Newswire

    Zion is Moving Forward With Operational Plan in Israel

    This letter also addresses Zion's multi-year license, for which the annual fee has been paid, 3-D seismic plans, and its commitment to its shareholders. As previously announced, Zion received a multi-year license extension through December 2, 2019.

  • Zion Oil & Gas Plans Going Forward
    PR Newswire

    Zion Oil & Gas Plans Going Forward

    DALLAS and CAESAREA, Israel, Nov. 29, 2018 /PRNewswire/ -- Zion Oil & Gas, Inc. (ZN) announces that it is completing the final phase of plugging the Megiddo Jezreel #1 (MJ#1) well in accordance with the wishes of various Israeli government ministries to allow for re-entry for future water monitoring. The vision of Zion Oil & Gas remains to help Israel become energy independent, and in doing so, use our projects as a platform to share the gospel of Jesus Christ.  That vision has not changed, and while the MJ#1 was determined to be non-commercial, we believe it was a meaningful and impactful project and one which we believe justifies further exploration efforts within our license area. The MJ#1 encountered much higher subsurface temperatures at a depth shallower than expected before drilling the well.  In our opinion, this is significant because reaching a minimum temperature threshold is necessary for the generation of hydrocarbons from an organic-rich source rock.

  • Zion Oil & Gas Operational Update on Megiddo-Jezreel #1 Well in Israel
    PR Newswire

    Zion Oil & Gas Operational Update on Megiddo-Jezreel #1 Well in Israel

    DALLAS and CAESAREA, Israel, Nov. 20, 2018 /PRNewswire/ -- Zion Oil & Gas, Inc. (ZN) announces that it has completed the testing program of its primary zones located within the Jurassic and Cretaceous-age Formations of the Megiddo-Jezreel #1 (MJ #1) well. 3,468-3,461 meters would not flow naturally to surface.  The fluid characteristics obtained while swabbing indicated high chloride brine. 3,455-3,446 meters would not flow naturally to surface.  The fluid characteristics obtained while swabbing indicated high chloride brine.