AORO.V - Aloro Mining Corp.

TSXV - TSXV Delayed Price. Currency in CAD
0.0350
0.0000 (0.00%)
As of 3:11PM EDT. Market open.
Stock chart is not supported by your current browser
Previous Close0.0350
Open0.0350
Bid0.0350 x 0
Ask0.0400 x 0
Day's Range0.0350 - 0.0350
52 Week Range0.0300 - 0.2300
Volume10,000
Avg. Volume73,070
Market Cap2M
Beta (3Y Monthly)-0.22
PE Ratio (TTM)N/A
EPS (TTM)-0.0080
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • Investors Who Bought Aloro Mining (CVE:AORO) Shares Five Years Ago Are Now Down 95%
    Simply Wall St.

    Investors Who Bought Aloro Mining (CVE:AORO) Shares Five Years Ago Are Now Down 95%

    We're definitely into long term investing, but some companies are simply bad investments over any time frame. It hits...

  • Does The Aloro Mining Corp. (CVE:AORO) Share Price Fall With The Market?
    Simply Wall St.

    Does The Aloro Mining Corp. (CVE:AORO) Share Price Fall With The Market?

    If you're interested in Aloro Mining Corp. (CVE:AORO), then you might want to consider its beta (a measure of share...

  • GlobeNewswire

    Aloro to Resume Drilling at the Los Venados Project

    ALORO MINING CORP. – (the “Company”) (TSX.V Symbol AORO) (FRANKFURT Symbol 4LPP) is pleased to announce that it will resume drilling at the Los Venados (LV) Project this weekend. The first round of drilling will include four drill holes for approximately 1200 meters of  drilling. The new drilling will be focused on the blind target in the southeast corner of the Los Venados concession which was discovered by drill hole LVRC-012.

  • GlobeNewswire

    Aloro Receives New Permit to Drill Los Venados

    ALORO MINING CORP. – (“Aloro” or the “Company”) (TSX.V Symbol AORO) (FRANKFURT Symbol 4LPP) is pleased to announce that through its Mexican subsidiary, Exploraciones Aloro, S.A. de C.V., it has been informed by its environmental consultant that the permit application that was submitted on April 1, 2019 has been accepted and a new permit was granted by SEMARNAT (The Secretariat of Environment and Natural Resources) on April 24, 2019. The Informe Preventivo (permit) specifies and includes 14 drill holes, the building of 14 drill sites, and the construction of approximately 1,500 meters of access roads in order to reach the 14 new drill site locations. This new permit is focused on the blind target in the southeast corner of the Los Venados (LV) concession which was discovered by drill hole LVRC-012.

  • GlobeNewswire

    Aloro Submits New Enviromental Permit for Drilling

    ALORO MINING CORP. (the “Company” or “Aloro”) (TSX.V Symbol AORO) (FRANKFURT Symbol 4LPP) is pleased to announce that it has submitted a new environmental permit for drilling and road building for approval by Semarnet (Ministry of Environment and Natural Resources) in order to continue drilling on its 3,199 hectare Los Venados Project (LV). Aloro was able to apply for the new permit after recently negotiating a new 3 year – 50 drill hole surface access agreement with the Mulatos Ejido. Aloro’s previous agreement limited it to only 12 drill holes, which it completed in December 2018.

  • GlobeNewswire

    Aloro Signs New Three Year - 50 Drill Hole Surface Access Agreement With the Mulatos Ejido

    ALORO MINING CORP. (the “Company” or “Aloro”) (TSX.V Symbol AORO) (FRANKFURT Symbol 4LPP) is pleased to announce that it has signed a new three year surface access agreement with the Mulatos Ejido. The new agreement allows for all types of exploration activities including roadbuilding and the drilling of up to 50 drill holes. The previous agreement was limited to only 12 drill holes that we completed in the 4th quarter of 2018.

  • GlobeNewswire

    Aloro Appoints Ken Balleweg as Technical Advisor

    ALORO MINING CORP. – (the “Company” or “Aloro”) is pleased to announce that it has appointed  Kenneth J. Balleweg, M.Sc., PGeo. Ken Balleweg is an exploration geologist with over 30 years of exploration and production experience, including 20 years in Mexico. In Mexico, his positions included 5 years as Placer Dome’s Senior Project Geologist for the Mulatos project, Mexico Mine Exploration Manager.

  • GlobeNewswire

    UPDATE – Aloro Provides 2018 Drill Plan Map for Los Venados

    ALORO MINING CORP. – (the “Company” or “Aloro”) further to the Company’s news release dated February 5, 2018, Aloro would like to inform shareholders and other interested parties that a drill plan map for the recently completed Phase I Los Venados drill program, including drill road location, mapped geology and alteration zones, has been added to the Company’s website.

  • GlobeNewswire

    Aloro Provides 2018 Drill Plan Map for Los Venados

    ALORO MINING CORP. – (the “Company” or “Aloro”) further to the Company’s news release dated February 5, 2018, Aloro would like to inform shareholders and other interested parties that a drill plan map for the recently completed Phase I Los Venados drill program, including drill road location, mapped geology and alteration zones, has been added to the Company’s website. Aloro is working with the local Ejido to get an amended agreement to allow the drilling of Phase II holes in the vicinity of hole LVRC-012 as expeditiously as possible. Aloro controls the 3,199 hectare Los Venados Project, which is located in the central part of the Mulatos Gold District.

  • GlobeNewswire

    Aloro Provides Update on Drilling at Los Venados and Planning Follow Up Drill Program

    VANCOUVER, British Columbia, Feb. 05, 2019 -- ALORO MINING CORP. – (the “Company” or “Aloro”) is pleased to provide an update from its recently completed Reverse Circulation.

  • GlobeNewswire

    Aloro Mobilizes Drill Rig To The Los Venados Project

    ALORO MINING CORP. – (the “Company”) is pleased to announce that it has mobilized a Reverse Circulation (RC) drill rig to the Los Venados Project. The RC drill rig was expedited from Hermosillo, Sonora to Mulatos, Sonora this morning and will arrive later today. On Tuesday, the RC drill rig will move on site to the # 1 drill pad to set up and begin drilling later that day.

  • GlobeNewswire

    ALORO Mobilizes Bulldozer for Road Construction and Building of Drill Pads

    ALORO MINING CORP. – (the “Company”) is pleased to announce that it has mobilized a D8 bulldozer to the Los Venados property for road construction and building of drill pads. The bulldozer was expedited from Hermosillo, Sonora to Mulatos, Sonora this morning and will arrive later today. The road construction to the drill sites becomes a valuable exploration program in itself as it will open up new exposures for sampling in mineralized areas and structure that were previously undercover.