Previous Close | 0.1500 |
Open | 0.1500 |
Bid | 0.1450 x N/A |
Ask | 0.1500 x N/A |
Day's Range | 0.1500 - 0.1500 |
52 Week Range | 0.1200 - 0.3900 |
Volume | |
Avg. Volume | 39,240 |
Market Cap | 7.435M |
Beta (5Y Monthly) | N/A |
PE Ratio (TTM) | N/A |
EPS (TTM) | N/A |
Earnings Date | N/A |
Forward Dividend & Yield | N/A (N/A) |
Ex-Dividend Date | N/A |
1y Target Est | N/A |
Figure 1 Location of the Spring Peak Project relative to Hecla Mining Company’s Aurora mine complex. Figure 2 Plan map of the Spring Peak alteration footprint and interpreted principle structural controls, with 2021 drill hole locations, and location of section line shown in Figure 3. Figure 3 Interpretive geological cross section A-A’ showing CSAMT resistivity, drill hole SP21-03 with results, and proposed future offset drill holes. VANCOUVER, British Columbia, Nov. 22, 2021 (GLOBE NEWSWIRE) --
Figure 1 Core photographs of representative epithermal textures encountered in the Headwater 2021 drilling. Core is HQ size, and each row is approximately 60 cm in length. A) Chalcedonic quartz vein from hole MH21-01; B) Heterolithic silica cemented breccia with sub-rounded clasts of milled wallrock from drill hole MH21-01; C) Multiphase vein cemented breccia from drill hole MH21-02; and D) fault-hosted brecciated chalcedonic vein from drill hole MH21-03. Figure 2 Location map of Headwater proje
Figure 1 Location of the Mahogany Project and other Headwater projects in the region*. Figure 2 Oblique Google Earth view of the primary target segment of the Main Ridge Fault Zone with gold in surface rock samples and significant alteration features. VANCOUVER, British Columbia, Oct. 28, 2021 (GLOBE NEWSWIRE) -- Headwater Gold Inc. (CSE: HWG) (OTCQB: HWAUF) (the "Company" or "Headwater") is pleased to announce a first-pass diamond core drill program has commenced on its 100% owned Mahogany Proj