MMV.V - Mineral Mountain Resources Ltd.

TSXV - TSXV Delayed Price. Currency in CAD
0.14
0.00 (0.00%)
As of 3:57PM EDT. Market open.
Stock chart is not supported by your current browser
Previous Close0.14
Open0.16
Bid0.14 x 0
Ask0.14 x 0
Day's Range0.14 - 0.16
52 Week Range0.13 - 0.74
Volume178,100
Avg. Volume90,682
Market Cap9.537M
Beta1.09
PE Ratio (TTM)N/A
EPS (TTM)-0.03
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • GlobeNewswire24 days ago

    Mineral Mountain Intersects 21.0 m Wide (68.8 ft) “East Limb Structure” in ST18-007

    Mineral Mountain Resources Ltd. and its subsidiary Mineral Mountain Resources (SD) Inc. (“Mineral Mountain” or the “Companies”) (TSX.V: “MMV”) (“OTCQX: MNRLF”) report that drill hole ST18-007 was terminated at a depth of 510 meters (1,673.2 ft.) and was successful in intersecting multiple intervals of highly contorted, folded,  mineralized iron formation with variable concentrations of pyrrhotite, pyrite and arsenopyrite mineralization. The deepest interval was between 461.77 – 483.11 meters down hole, a 21m (68.89 ft.) wide highly deformed zone in iron formation, interpreted to be the East Limb Structure, interpreted to be the down plunge extension of the steeply plunging high grade shoot intersected in ST18-006 previously reported in a news release dated August 9, 2018.

  • GlobeNewswirelast month

    Mineral Mountain Takes Aggressive Step Out to Test Steeply Plunging High Grade Shoot 225 Meters Down Plunge Of Hole ST18-006

    Mineral Mountain Resources Ltd. and its subsidiary Mineral Mountain Resources (SD) Inc. (“Mineral Mountain” or the “Companies”) (TSX.V: “MMV”) (“OTCQX: MNRLF”) report that drill hole ST18-007 is anticipated to pierce the steeply plunging high grade shoot, a mineralized iron formation shear zone at about 225 meters down plunge from ST18-006 previously reported in a news release dated August 9, 2018. This probing confirmed that a strong EM response was estimated to be positioned about 100 meters “ahead of hole ST18-007.” This EM response coincides with the down plunge projection of the East Limb Shear that hosts the high grade gold shoot intersected in historical drill hole BLG-UG3 (3.36 g/t Au over 24 meters) and ST18-006 (2.12 g/t Au over 20 meters).

  • GlobeNewswirelast month

    Mineral Mountain Intersects 2.12 GPT Over 20.0 Meters Extends Steeply Plunging High Grade Shoot to 230 Meters Down Plunge

    VANCOUVER, B.C., Aug. 09, 2018-- Mineral Mountain Resources Ltd. and its subsidiary Mineral Mountain Resources Inc. are pleased to report that a total of six of the planned twelve NQ diamond drill holes ...

  • ACCESSWIRE7 months ago

    SeeThruEquity Initiates Coverage on Mineral Mountain Resources (MMV) with Target Price of US$0.93

    NEW YORK, NY / ACCESSWIRE / March 5, 2018 / SeeThruEquity, a leading independent equity research and corporate access firm focused on smallcap and microcap public companies, today announced it has initiated ...

  • OTC Markets Group Welcomes Mineral Mountain Resources Ltd. to OTCQX
    PR Newswire7 months ago

    OTC Markets Group Welcomes Mineral Mountain Resources Ltd. to OTCQX

    NEW YORK , Feb. 13, 2018 /PRNewswire/ --  OTC Markets Group Inc. (OTCQX: OTCM), operator of financial markets for 10,000 U.S. and global securities, today announced Mineral Mountain Resources Ltd. (TSXV: ...

  • ACCESSWIRE10 months ago

    Goldman Small Cap Research Issues Research Report on Mineral Mountain Resources Ltd.

    BALTIMORE, MD / ACCESSWIRE / November 28, 2017 / Goldman Small Cap Research, a stock market research firm specializing in the small cap and microcap sectors, announced today that it has released a new ...