NGZ.V - NRG Metals Inc.

TSXV - TSXV Delayed Price. Currency in CAD
0.1150
0.0000 (0.00%)
At close: 3:22PM EST
Stock chart is not supported by your current browser
Previous Close0.1150
Open0.1100
Bid0.105 x 0
Ask0.115 x 0
Day's Range0.1050 - 0.1200
52 Week Range0.0550 - 0.4400
Volume108,400
Avg. Volume233,834
Market Cap15.832M
Beta (3Y Monthly)9.60
PE Ratio (TTM)N/A
EPS (TTM)-0.086
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target EstN/A
  • CNW Grouplast month

    IIROC Trading Resumption - NGZ

    IIROC Trading Resumption - NGZ

  • PR Newswirelast month

    NRG Metals File Lithium Resource Estimate

    VANCOUVER, British Columbia , Dec. 4, 2018 /PRNewswire/ -- NRG Metals Inc. (" NRG " or the " Company ") (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) is pleased to report it has issued ...

  • CNW Grouplast month

    IIROC Trading Halt - NGZ

    IIROC Trading Halt - NGZ

  • CNW Group3 months ago

    NRG Reports High Lithium Grades for Measured and Indicated Resource at the Hombre Muerto Norte Lithium Project, Argentina

    NRG Reports High Lithium Grades for Measured and Indicated Resource at the Hombre Muerto Norte Lithium Project, Argentina

  • PR Newswire3 months ago

    NRG Reports High Lithium Grades for Measured and Indicated Resource at the Hombre Muerto Norte Lithium Project, Argentina

    NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) is pleased to provide additional information regarding the maiden lithium ("Li") and potassium ("K") resource statement for its Hombre Muerto Norte lithium brine project in the Salta province of Argentina.

  • PR Newswire4 months ago

    NRG Announces Maiden Measured and Indicated Resource of 571,000 Tonnes LCE at the Hombre Muerto Norte Lithium Project, Argentina

    Vancouver, British Columbia, Oct. 2, 2018 /PRNewswire/ --  NRG Metals Inc. ("NRG" or the "Company") (TSX-V:NGZ) (NRGMF) (OGPN.F) is pleased to report a maiden lithium (Li) and potassium (K) resource statement for its Hombre Muerto Norte lithium brine project in the Salta province of Argentina. The NI 43-101 resource statement, detailed in Table 1 below, includes 509,000 tonnes (metric tons) of lithium carbonate (Li2CO3) equivalent (LCE) and 1,609,000 tonnes of potash (KCl) equivalent in the Measured and Indicated Resource categories, with an additional 62,000 tonnes of LCE and 231,000 tonnes KCl in the Indicated Resource category.

  • CNW Group4 months ago

    Property Updates and Consulting Agreements Hombre Muerto North Lithium Project

    VANCOUVER , Sept. 25, 2018 /CNW/ - NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) The Company is pleased to announce that it has completed the third installment of it's purchase option for the Hombre Muerto North Lithium Project (" HMN Project "), located in Salta Province , Argentina . The vendor has also become an insider of the Company as defined by Canadian securities regulations. The Company has now completed an extensive evaluation of the HMN Project, and intends to announce a maiden resource estimate in the immediate future through the release of an independent NI43-101 technical report.

  • CNW Group4 months ago

    Second Pump Well/Potential Production Well at Hombre Muerto North

    VANCOUVER , Sept. 21, 2018 /CNW/ - NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) The Company is pleased to announce the completion of a second pumping well at the Hombre Muerto North Lithium Project, Salta, Argentina . The well, designated TWW18-02, was drilled to the target depth of 400 meters, and it is located immediately adjacent to core hole TH18-02, which was described in the company's press releases dated July 10, 2018 and August 23 , 2018. Pumping tests will commence shortly. The core hole was drilled to a depth of 281 meters, and the arithmetic average of single packer, double packer and one bailer sample from surface to a depth of 230.5 meters was 638 mg/L with a low Mg to Li ratio of 2.65 to one.

  • PR Newswire4 months ago

    Second Pump Well/Potential Production Well at Hombre Muerto North

    NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) The Company is pleased to announce the completion of a second pumping well at the Hombre Muerto North Lithium Project, Salta, Argentina. The well, designated TWW18-02, was drilled to the target depth of 400 meters, and it is located immediately adjacent to core hole TH18-02, which was described in the company's press releases dated July 10, 2018 and August 23, 2018. Pumping tests will commence shortly. Pumping well TWW18-02 was drilled adjacent to core hole TH18-02 on the western side of the Tramo concession.  The core hole was drilled to a depth of 281 meters, and the arithmetic average of single packer, double packer and one bailer sample from surface to a depth of 230.5 meters was 638 mg/L with a low Mg to Li ratio of 2.65 to one.

  • PR Newswire5 months ago

    NRG Announces Additional Results for Second Drill Hole at its Flagship Hombre Muerto North Lithium Project Second Pumping Well Started

    NRG's second drill hole at the Hombre Muerto North project has been completed to a depth of 280.8 m, and the sample results demonstrate that excellent lithium values are present in the lower portion of the hole. Based on these encouraging results, as well as the excellent results from the pumping well located approximately 2.1 kilometers to the east, NRG has decided to drill a second pumping well adjacent to the second core hole. The target depth of this hole is 400 m.

  • PR Newswire5 months ago

    NRG Announces Excellent Pumping Well Test Results at Flagship Hombre Muerto North Lithium Project

    NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) the Company is pleased to report pumping test results for the first 10 inch large-diameter pumping well at the Hombre Muerto North Lithium Project, Argentina. The well is located on the Tramo Claim portion of the project group. This pumping well was drilled immediately adjacent to the first exploration diamond core hole following the excellent results from the recent sampling that provided assay results of 401 meters of 900 mg/L lithium with very good chemistry as reported in the Company's press release dated June 28, 2018.

  • CNW Group5 months ago

    NRG Announces Excellent Pumping Well Test Results at Flagship Hombre Muerto North Lithium Project

    VANCOUVER , Aug. 9, 2018 /CNW/ - NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) the Company is pleased to report pumping test results for the first 10 inch large-diameter pumping well at the Hombre Muerto North Lithium Project, Argentina . The well is located on the Tramo Claim portion of the project group. This pumping well was drilled immediately adjacent to the first exploration diamond core hole following the excellent results from the recent sampling that provided assay results of 401 meters of 900 mg/L lithium with very good chemistry as reported in the Company's press release dated June 28, 2018 .

  • PR Newswire6 months ago

    NRG Announces Initial Results for Second Drill Hole at Its Flagship Hombre Muerto North Lithium Project

    - Initial sample results for the second core hole indicate excellent lithium values with very low Mg/Li ratios. VANCOUVER, British Columbia, July 10, 2018 /PRNewswire/ -- NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) is pleased to report the initial assays for samples from the second diamond drill hole at the Hombre Muerto Lithium project. The samples were taken from near surface to a depth of 61.5 m below surface.  The samples average 719 mg/L lithium with a very low Mg to Li ratio ranging from 2.1 to 3.3.

  • PR Newswire7 months ago

    NRG Announces Complete Results for First Drill Hole at its Flagship Hombre Muerto North Lithium Project

    Brine samples collected from 300 to 401 meters (m) show high grade values very similar to the assays previously reported for the samples from surface to a depth of 300 m, with an arithmetic average 918 mg/l lithium and a low magnesium to lithium ratio. The arithmetic average lithium concentration for all of the samples from the surface to a depth of 401 m is 900 mg/l, with a relatively low magnesium to lithium ratio of 3.0 to 1.0. Drilling on a second core hole located 2.1 kilometers to the west of the first hole is advancing.

  • NRG Drilling Continues to Intersect High-grade Brine at the Hombre Muerto North Lithium Project
    PR Newswire7 months ago

    NRG Drilling Continues to Intersect High-grade Brine at the Hombre Muerto North Lithium Project

    • The hole has been completed to a depth of 401 meters, and sample results from 300 to the bottom of the hole are pending. • Adjacent rotary drill hole for pump testing has been completed to a depth of 393 meters. • Drilling has commenced on a second diamond core hole approximately 2.1 kilometers to the east of the first hole.

  • CNW Group8 months ago

    NRG Metals Announces Pumping Test Well at 309 Meters

    VANCOUVER , May 25, 2018 /CNW/ - NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) the Company is pleased to report that the drilling of a pump test well at the Hombre Muerto North Lithium Project is progressing on schedule. The rotary hole, which is located 15 meters east of the core hole currently underway, is now at 309 meters, with an expected target dept of 400 meters. The pumping well is being drilled in tandem with the core hole because the Company was confident that it would obtain acceptable results in the core hole.

  • NRG Metals Announces Pumping Test Well at 309 Meters
    PR Newswire8 months ago

    NRG Metals Announces Pumping Test Well at 309 Meters

    VANCOUVER, British Columbia, May 25, 2018 /PRNewswire/ -- NRG Metals Inc. ("NRG" or the "Company") (NGZ.V) (NRGMF) (OGPN.F) the Company is pleased to report that the drilling of a pump test well at the Hombre Muerto North Lithium Project is progressing on schedule.   The rotary hole, which is located 15 meters east of the core hole currently underway, is now at  309 meters, with an expected target dept of 400 meters. The pumping well is being drilled in tandem with the core hole because the Company was confident that it would obtain acceptable results in the core hole.

  • CNW Group8 months ago

    NRG Reports Consistent High-Grade Brine Intercepts Over the First 100 Meters of Drilling at the Hombre Muerto North Lithium Project

    NRG Reports Consistent High-Grade Brine Intercepts Over the First 100 Meters of Drilling at the Hombre Muerto North Lithium Project

  • PR Newswire8 months ago

    NRG Reports Consistent High-Grade Brine Intercepts over the First 100 Meters of Drilling at the Hombre Muerto North Lithium Project

    The hole is now at 300.5 meters in clastic sediments, and brine samples are currently being collected from 300 to 100 meters. NRG Metals Inc. ("NRG" or the "Company ") (NGZ.V)(NRGMF)(OGPN.F) the Company is delighted to report that double packer samples collected over the first 100 meters of the hole average 905 mg/l lithium with a low Mg to Li ratio of 3.0 to 1.0.

  • NRG Adds Second Drill at the Hombre Muerto North Lithium Project
    PR Newswire8 months ago

    NRG Adds Second Drill at the Hombre Muerto North Lithium Project

    VANCOUVER, British Columbia, May 14, 2018  /PRNewswire/ -- NRG Metals Inc. ("NRG" or the "Company") (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) the Company is pleased to report that it has mobilized a rotary drill to the Hombre Muerto North Lithium project to complement the diamond drill already at site. The rotary hole, which is located 15 meters east of the core hole currently underway, is to carry out pump testing.

  • PR Newswire8 months ago

    Drilling at the Salar Escondido Lithium Project Reaches 400 Meter Target Depth

    NRG Metals Inc. ("NRG" or the "Company") (TSX-V:NGZ) (NRGMF) (OGPN.F) is pleased to report that drilling at the Salar Escondido Lithium Project has progressed ahead of schedule, and an 8.5 inch rotary hole has been completed to the target depth of 400 meters. From 370 to 400 meters the hole intersected an unaltered basalt that may be the bottom of the basin. After the casing is installed, the hole will be given time to stabilize before sampling by a ProHydro Inc. SNAP passive sampler and custom packer equipment Mr. William Feyerabend, a Qualified Person under NI 43-101, will be on site to provide senior supervision beginning in mid-May.

  • PR Newswire9 months ago

    Drilling and Sampling Underway at Hombre Muerto North Lithium Project

    VANCOUVER, British Columbia, May 3, 2018 /PRNewswire/ -- NRG Metals Inc. ("NRG" or the "Company") (TSX-V:NGZ) (NRGMF) (OGPN.F) the Company is pleased to report that drilling at the Salar Hombre Muerto North  lithium project is  underway and progressing as planned. The first diamond core hole has been advanced to a depth of 105 meters with a target depth of up to 350 meters. Samples will be sent to Alex Stewart Laboratories in Jujuy, Argentina.

  • PR Newswire9 months ago

    Drilling at Salar Escondido Approaching Target Zone

    NRG Metals Inc. ("NRG" or the "Company") (TSX-V:NGZ.V) (NRGMF) (Frankfurt:OGPN.F) is pleased to announce that drilling on a second test well is progressing at the Salar Escondido Lithium Project, comprised of 29,180 hectares (72,100 acres), and located in Catamarca Province, Argentina. A rotary drill operated by drilling contractor Water Drilling ("WD") had completed 87 meters as of Tuesday, April 17th. WD is contracted to drill an 8.5-inch diameter rotary hole up to a depth of 400 m. This second hole is located approximately one kilometer south of the Company's initial diamond drill hole, which was completed to a depth of 307 meters in December 2017.

  • CNW Group9 months ago

    Drilling at Salar Escondido Approaching Target Zone

    VANCOUVER , April 19, 2018 /CNW/ - NRG Metals Inc. ("NRG" or the "Company") (TSX-V:NGZ.V) (NRGMF) (OGPN.F) is pleased to announce that drilling on a second test well is progressing at the Salar Escondido Lithium Project, comprised of 29,180 hectares (72,100 acres), and located in Catamarca Province, Argentina . A rotary drill operated by drilling contractor Water Drilling ("WD") had completed 87 meters as of Tuesday, April 17 th. The hard basaltic layer encountered in the previous hole was not encountered in this well. This second hole is located approximately one kilometer south of the Company's initial diamond drill hole, which was completed to a depth of 307 meters in December 2017 .

  • CNW Group9 months ago

    NRG Metals Inc Announce Drill Rig on Site at Salar Escondido

    NRG Metals Inc Announce Drill Rig on Site at Salar Escondido