Net loss of $3.8 million driven by lower copper production and prior quarter price settlement adjustments

EBITDA1 of $1.7 million, ending quarter cash & restricted cash of $35.9 million

Quarterly dividend of Cdn$0.03 per share declared, representing a 7.79% yield2

VANCOUVER, British Columbia, Aug. 02, 2023 (GLOBE NEWSWIRE) -- Amerigo Resources Ltd. (TSX: ARG; OTCQX: ARREF) (“Amerigo” or the “Company”) announces financial results for the three months ended June 30, 2023 (“Q2-2023”). Dollar amounts in this news release are in U.S. dollars unless indicated otherwise.

Amerigo’s quarterly financial results were impacted by reduced copper production from Minera Valle Central (“MVC”), the Company’s 100% owned operation near Rancagua, Chile, and $2.7 million in negative price settlement adjustments to prior quarter copper sales. Copper production was impacted by MVC’s scheduled 8-day annual maintenance shutdown and by an additional eight days of lost production in June 2023 due to flooding in Central Chile.

Quarterly results included a net loss of $3.8 million, loss per share (“LPS”) of $0.02 (Cdn$0.03) and EBITDA1 of $1.7 million. Following year-to-date capital returns to shareholders of $10.0 million, Capex payments of $9.2 million and debt and lease repayments of $5.4 million, cash and restricted cash on June 30, 2023, were $35.9 million, compared to starting 2023 cash and restricted cash of $42.0 million.

“Our second quarter production and financial results were impacted by a total operations shutdown at the end of June that will also be felt in the third quarter,” said Aurora Davidson, Amerigo’s President and CEO. “Prior to the flooding event, our copper production outperformed guidance by 4%. Because of that outperformance, although we adjusted our annual copper production guidance by 3% due to the flood, our financial health and outlook remain robust. Amerigo remains committed to its Capital Return Strategy. Despite the disruption, I am pleased to announce that the Company’s eighth consecutive dividend has been declared,” she added.

On July 31, 2023, Amerigo’s Board of Directors declared a quarterly dividend of Cdn$0.03 per share, payable on September 20, 2023, to shareholders of record as of August 30, 20233. Amerigo designates the entire amount of this taxable dividend to be an “eligible dividend” for purposes of the Income Tax Act (Canada), as amended from time to time. Based on Amerigo’s June 30, 2023, share closing price of Cdn$1.54, this represents an annual dividend yield of 7.79%2.

This news release should be read with Amerigo’s interim consolidated financial statements and Management’s Discussion and Analysis (“MD&A”) for Q2-2023, available on the Company’s website at www.amerigoresources.com and www.sedar.com.

 

 

 

 

 

 

 

 

 

30-Jun-23

31-Dec-22

Q2-2023

Q2-2022

 

MVC's copper price ($/lb)4

 

 

 

3.80

4.10

 

Revenue ($ millions)

 

 

 

32.0

33.6

 

Net loss ($ millions)

 

 

 

(3.8)

(5.1)

 

LPS ($)

 

 

 

(0.02)

(0.03)

 

LPS (Cdn)

 

 

 

(0.03)

(0.04)

 

EBITDA1 ($ millions)

 

 

 

1.7

6.7

 

Operating cash flow before changes in non-cash working capital1 ($ millions)

 

(2.3)

(4.0)

 

FCFE1 ($ millions)

 

 

 

(12.8)

(10.7)

 

Cash ($ millions)

 

31.7

37.8

 

 

 

Restricted cash ($ millions)

 

4.2

4.2

 

 

 

Borrowings ($ millions)

 

19.7

23.7

 

 

 

Share outstanding at end of period (millions)

 

164.8

166.0

 

 

 

 

 

 

 

 

 

 

Highlights and Significant Items

  • Amerigo’s Q2-2023 financial performance was impacted by MVC’s planned 8-day annual plant maintenance shutdown but unexpectedly affected by a complete shutdown commencing on June 23, 2023, caused by extraordinary flooding that disconnected MVC from Chile’s central power grid and resulted in 1.3 million pounds of lost copper production in the quarter, bringing production 9% lower than in the three months ended June 30, 2022 (“Q2-2022”). On July 21, 2023, MVC was reconnected to the power grid, enabling MVC to resume normal operations on July 22, 2023.

  • The 8% decline in copper deliveries and a lower average copper price of $3.80 per pound (“/lb”), compared to an average copper price of $4.10/lb during Q2-2022, resulted in lower gross copper revenue of $10.9 million in the quarter.

  • Net loss during Q2-2023 was $3.8 million, compared to a net loss of $5.1 million in Q2-2022, due to stronger foreign exchange gains and lower income tax expense.

  • LPS during Q2-2023 was $0.02 (Cdn$0.03) (Q2-2022: $0.03 (Cdn$0.04)).

  • Q2-2023 copper production was 13.6 million pounds (“M lbs”) (Q2-2022: 14.9 M lbs), including 8.8 M lbs from fresh tailings (Q2-2022: 9.1 M lbs) and 4.8 M lbs from Cauquenes historical tailings (Q2-2022: 5.8 M lbs).

  • Molybdenum production during Q2-2023 was 0.3 million pounds (Q2-2022: 0.2 million pounds). MVC’s molybdenum price increased to $20.76/lb (Q2-2022: $17.58/lb), resulting in a Q2-2023 molybdenum revenue of $2.9 million (Q2-2022: $2.2 million).

  • Copper tolling revenue is calculated from the gross value of copper produced in Q2-2023 of $52.8 million (Q2-2022: $63.7 million) and negative fair value adjustments to settlement receivables of $3.5 million (Q2-2022: $7.8 million), less notional items including DET royalties of $14.0 million (Q2-2022: $18.3 million), smelting and refining of $5.7 million (Q2-2022: $5.8 million) and transportation of $0.4 million (Q2-2022: $0.4 million).

  • The Company used operating cash flow before changes in non-cash working capital1 of $2.3 million in Q2-2023 (Q2-2022: $4.0 million). Quarterly net operating cash flow was $0.5 million (Q2-2022: $0.5 million). There was negative free cash flow to equity1 of $12.8 million in Q2-2023 compared to $10.7 million in Q2-2022.

  • Q2-2023 cash cost1 was $2.37/lb (Q2-2022: $2.01/lb), impacted by lower production, which resulted in increases of $0.29/lb in other direct costs, $0.08/lb in power costs, $0.03/lb in smelting and refining charges, and $0.03/lb in administration costs. The increases were mitigated by stronger molybdenum by-product credits of $0.06/lb from stronger molybdenum production and prices.

  • Amerigo’s financial performance is sensitive to changes in copper prices. MVC’s Q2-2023 provisional copper price was $3.80/lb. The final prices for April, May and June 2023 sales will be the average London Metal Exchange (“LME”) prices for July, August and September 2023, respectively. A 10% increase or decrease from the $3.80/lb provisional price would result in a $5.2 million change in revenue in Q3-2023 regarding Q2-2023 production.

  • In Q2-2023, Amerigo returned $4.5 million to shareholders (Q2-2022: $13.0 million), including $3.7 million through Amerigo’s regular quarterly dividend of Cdn$0.03 per share (Q2-2022: $4.1 million), and $0.8 million used to repurchase for cancellation 0.7 million common shares (Q2-2022: $8.9 million used to repurchase 6.8 million common shares).

  • In Q2-2023, the Company made scheduled debt payments of $3.5 million (Q2-2022: $3.5 million), lease repayments of $1.7 million (Q2-2022: $0.2 million) and paid $4.8 million for plant and equipment (Q2-2022: $3.0 million).

  • On June 30, 2023, the Company held cash and cash equivalents of $31.7 million (December 31, 2022: $37.8 million), a restricted cash balance of $4.2 million (December 31, 2022: $4.2 million) and had a working capital deficiency of $4.9 million (December 31, 2022: working capital of $10.0 million).

Investor Conference Call on August 3, 2023

Amerigo’s quarterly investor conference call will occur on Thursday, August 3, 2023, at 11:00 am Pacific Daylight Time/2:00 pm Eastern Daylight Time.

Participants can join by visiting https://emportal.ink/3HHL7xU and entering their name and phone number. The conference system will then call the participants and place them instantly into the call.

Alternatively, participants can dial directly to be entered into the call by an Operator. Dial 1-888-664-6392 (Toll-Free North America) and state they wish to participate in the Amerigo Resources Q2-2023 Earnings Call.

About Amerigo and Minera Valle Central (“MVC”)

Amerigo Resources Ltd. is an innovative copper producer with a long-term relationship with Corporación Nacional del Cobre de Chile (“Codelco”), the world’s largest copper producer.

Amerigo produces copper concentrate, and molybdenum concentrate as a by-product at the MVC operation in Chile by processing fresh and historic tailings from Codelco’s El Teniente mine, the world's largest underground copper mine. Tel: (604) 681-2802; Web: www.amerigoresources.com; ARG:TSX; OTCQX: ARREF.

1 This is a non-IFRS measure. See “Non-IFRS Measures” for further information.

Contact Information

 

 

 

 

 

Aurora Davidson

 

Graham Farrell

President and CEO

 

Investor Relations

(604) 697-6207

 

(416) 842-9003

ad@amerigoresources.com

 

graham.farrell@harbor-access.com

 

 

 


Summary Consolidated Statements of Financial Position

 

June 30,

 

December 31,

 

 

2023

 

2022

 

 

$ thousands

 

$ thousands

 

Cash and cash equivalents

31,675

 

37,821

 

Restricted cash

4,201

 

4,215

 

Property plant and equipment

160,467

 

158,591

 

Other assets

21,759

 

30,552

 

Total assets

218,102

 

231,179

 

Total liabilities

104,472

 

112,476

 

Shareholders' equity

113,630

 

118,703

 

Total liabilities and shareholders' equity

218,102

 

231,179

 

 

 

 

 

Summary Consolidated Statements of Loss and Comprehensive Loss

 

Three months ended June 30,

 

 

2023

 

2022

 

 

$ thousands

 

$ thousands

 

Revenue

32,036

 

33,584

 

Tolling and production costs

(35,341)

 

(31,968)

 

Other gains (expenses)

32

 

(3,089)

 

Finance expense

(359)

 

(267)

 

Income tax expense

(161)

 

(3,331)

 

Net loss

(3,793)

 

(5,071)

 

Other comprehensive (loss) income

(915)

 

728

 

Comprehensive loss

(4,708)

 

(4,343)

 

 

 

 

 

Loss per share - basic & diluted

(0.02)

 

(0.03)

 

 

 

 

 

Summary Consolidated Statements of Cash Flows

 

Three months ended June 30,

 

 

2023

 

2022

 

 

$ thousands

 

$ thousands

 

Cash flow used in operating activities

(2,303)

 

(3,952)

 

Changes in non-cash working capital

2,807

 

4,460

 

Net cash from operating activities

504

 

508

 

Net cash used in investing activities

(4,791)

 

(3,010)

 

Net cash used in financing activities

(8,041)

 

(14,394)

 

Net decrease in cash and cash equivalents

(12,328)

 

(16,896)

 

Effect of foreign exchange rates on cash

80

 

(1,179)

 

Cash and cash equivalents, beginning of period

43,923

 

71,095

 

Cash and cash equivalents, end of period

31,675

 

53,020

 

 

 

 

 

1 Non-IFRS Measures

This news release includes five non-IFRS measures: (i) EBITDA, (ii) operating cash flow before changes in non-cash working capital, (iii) free cash flow to equity (“FCFE”), (iv) free cash flow (“FCF”) and (v) cash cost.

These non-IFRS performance measures are included in this news release because they provide key performance measures used by management to monitor operating performance, assess corporate performance, and plan and assess the overall effectiveness and efficiency of Amerigo’s operations. These performance measures are not standardized financial measures under IFRS and, therefore, amounts presented may not be comparable to similar financial measures disclosed by other companies. These performance measures should not be considered in isolation as a substitute for performance measures in accordance with IFRS.

(i)

 

EBITDA refers to earnings before interest, taxes, depreciation, and administration and is calculated by adding depreciation expense to the Company’s gross profit.

 

 

 

 

 

 

 

(Expressed in thousands)

Q2-2023

Q2-2022

 

 

 

 

$

$

 

 

 

Gross (loss) profit

(3,305)

1,616

 

 

 

Add:

 

 

 

 

Depreciation and amortization

5,028

5,059

 

 

 

EBITDA

1,723 

6,675

 

 

 

 

 

 

(ii)

 

Operating cash flow before changes in non-cash working capital is calculated by adding back the decrease or subtracting the increase in changes in non-cash working capital to or from cash provided by operating activities.

 

 

 

 

 

 

 

(Expressed in thousands)

Q2-2023

 Q2-2022

 

 

 

 

$

 $

 

 

 

Net cash provided by operating activities

504

508

 

 

 

Deduct:

 

 

 

 

Changes in non-cash working capital

(2,807)

(4,460)

 

 

 

Operating cash flow before non-cash working capital

(2,303)

 (3,952)

 

 

 

 

(iii)

 

Free cash flow to equity (“FCFE”) refers to operating cash flow before changes in non-cash working capital, less capital expenditures plus new debt issued less debt and lease repayments. FCFE represents the amount of cash generated by the Company in a reporting period that can be used to pay for the following:

 

 

 

 

 

a) potential distributions to the Company’s shareholders, and
b) any additional taxes triggered by the repatriation of funds from Chile to Canada to fund these distributions.

 

 

 

 

 

Free cash flow (“FCF”) refers to FCFE plus repayments of borrowings and lease repayments.


 

 

(Expressed in thousands)

Q2-2023

Q2-2022

 

 

 

 

$

$

 

 

 

Operating cash flow before changes in non-cash working capital

(2,303)

(3,952)

 

 

 

Deduct:

 

 

 

 

Cash used to purchase plant and equipment

(4,791)

(3,010)

 

 

 

Repayment of borrowings, net of new debt issued

(4,059)

(3,500)

 

 

 

Lease repayments

(1,674)

(195)

 

 

 

Free cash flow to equity

(12,827)

(10,657)

 

 

 

Add:

 

 

 

 

Repayment of borrowings, net of new debt issued

4,059

3,500

 

 

 

Lease repayments

1,674

195

 

 

 

Free cash flow

(7,094)

(6,962)

 

 

 

 

 

 

(iv)

 

Cash cost is a performance measure commonly used in the mining industry that is not defined under IFRS. Cash cost is the aggregate of smelting and refining charges, tolling/production costs net of inventory adjustments and administration costs, net of by-product credits. Cash cost per pound produced is based on pounds of copper produced and is calculated by dividing cash cost by the number of pounds of copper produced.

 


 

 

(Expressed in thousands)

 

Q2-2023

Q2-2022

 

 

 

 

 

$

$

 

 

 

Tolling and production costs

 

35,341

31,968

 

 

 

Add (deduct):

 

 

 

 

 

Smelting and refining charges

 

5,697

5,791

 

 

 

Transportation costs

 

417

403

 

 

 

Inventory adjustments

 

(307)

(310)

 

 

 

By-product credits

 

(2,859)

(2,241)

 

 

 

Depreciation and amortization

 

(5,028)

(5,059)

 

 

 

DET royalties - molybdenum

 

(1,007)

(518)

 

 

 

Cash cost

 

32,254

30,034

 

 

 

Copper tolled (M lbs)

 

13.63

14.92

 

 

 

Cash cost ($/lb)

 

2.37

2.01

 

 

 

 

 

 

 

2   Dividend yield

The disclosed annual yield of 7.79% is based on four quarterly dividends of Cdn$0.03 per share each, divided over Amerigo’s June 30, 2023, closing share price of Cdn$1.54.

3   Dividend dates

A dividend of Cdn$0.03 per share will be paid on September 20, 2023, to shareholders of record as of August 30, 2023. Accordingly, the ex-dividend date will be August 29, 2023. Shareholders purchasing Amerigo shares on the ex-dividend date or after will not receive this dividend, as it will be paid to selling shareholders. Shareholders purchasing Amerigo shares before the ex-dividend date will receive the dividend.

4   MVC’s copper price

MVC’s copper price is the average notional copper price for the period before smelting and refining, DET notional copper royalties, transportation costs and excluding settlement adjustments to prior period sales.

MVC’s pricing terms are based on the average LME copper price of the third month following the delivery of copper concentrates produced under the DET tolling agreement (“M+3”). This means that when final copper prices are not yet known, they are provisionally marked to market at the end of each month based on the progression of the LME-published average monthly M and M+3 prices. Provisional prices are adjusted monthly using this consistent methodology until they are settled.

Q1-2023 copper deliveries were marked-to-market on March 31, 2023 at $4.01/lb and were settled in Q2-2023 as follows:

  • January 2023 sales settled at the April 2023 LME average price of $4.00/lb

  • February 2023 sales settled at the May 2023 LME average price of $3.73/lb

  • March 2023 sales settled at the June 2023 LME average price of $3.80/lb

Q2-2023 copper deliveries were marked-to-market on June 30, 2023 at $3.80/lb and will be settled at the LME average prices for July ($3.83/lb), August and September 2023.

Cautionary Note Regarding Forward-Looking Information

This news release contains certain forward-looking information and statements defined in applicable securities laws (collectively called "forward-looking statements"). These statements relate to future events or the Company’s future performance. All statements other than statements of historical fact are forward-looking statements. The use of any of the words "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "potential", "should", "believe" and similar expressions are intended to identify forward-looking statements. These forward-looking statements include but are not limited to, statements concerning:

  • forecasted production and operating costs;

  • our strategies and objectives;

  • our estimates of the availability and quantity of tailings and the quality of our mine plan estimates;

  • the sufficiency of MVC’s water reserves to maintain projected Cauquenes tonnage processing for a period of at least 18 months;

  • prices and price volatility for copper, molybdenum and other commodities and materials we use in our operations;

  • the demand for and supply of copper, molybdenum and other commodities and materials that we produce, sell and use;

  • sensitivity of our financial results and share price to changes in commodity prices;

  • our financial resources and financial condition and our expected ability to redeploy other tools of our capital return strategy;

  • interest and other expenses;

  • domestic and foreign laws affecting our operations;

  • our tax position and the tax rates applicable to us;

  • our ability to comply with our loan covenants;

  • the production capacity of our operations, our planned production levels and future production;

  • potential impact of production and transportation disruptions;

  • hazards inherent in the mining industry causing personal injury or loss of life, severe damage to or destruction of property and equipment, pollution or environmental damage, claims by third parties and suspension of operations

  • estimates of asset retirement obligations and other costs related to environmental protection;

  • our future capital and production costs, including the costs and potential impact of complying with existing and proposed environmental laws and regulations in the operation and closure of our operations;

  • repudiation, nullification, modification or renegotiation of contracts;

  • our financial and operating objectives;

  • our environmental, health and safety initiatives;

  • the outcome of legal proceedings and other disputes in which we may be involved;

  • the outcome of negotiations concerning metal sales, treatment charges and royalties;

  • disruptions to the Company's information technology systems, including those related to cybersecurity;

  • our dividend policy, including the security of the quarterly dividends and our Capital Return Strategy; and general business and economic conditions, including, but not limited to, our assessment of strong market fundamentals supporting copper prices.

These forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such statements. Inherent in forward-looking statements are risks and uncertainties beyond our ability to predict or control, including risks that may affect our operating or capital plans; risks generally encountered in the permitting and development of mineral projects such as unusual or unexpected geological formations, negotiations with government and other third parties, unanticipated metallurgical difficulties, delays associated with permits, approvals and permit appeals, ground control problems, adverse weather conditions, process upsets and equipment malfunctions; risks associated with labour disturbances and availability of skilled labour and management; risks related to the potential impact of global or national health concerns, including COVID-19, and the inability of employees to access sufficient healthcare; government or regulatory actions or inactions; fluctuations in the market prices of our principal commodities, which are cyclical and subject to substantial price fluctuations; risks created through competition for mining projects and properties; risks associated with lack of access to markets; risks associated with availability of and our ability to obtain both tailings from Codelco’s Division El Teniente’s current production and historic tailings from tailings deposit; the availability of and ability of the Company to obtain adequate funding on reasonable terms for expansions and acquisitions; mine plan estimates; risks posed by fluctuations in exchange rates and interest rates, as well as general economic conditions; risks associated with environmental compliance and changes in environmental legislation and regulation; risks associated with our dependence on third parties for the provision of critical services; risks associated with non-performance by contractual counterparties; risks associated with supply chain disruptions; title risks; social and political risks associated with operations in foreign countries; risks of changes in laws affecting our operations or their interpretation, including foreign exchange controls; and risks associated with tax reassessments and legal proceedings. Many of these risks and uncertainties apply to the Company and its operations and Codelco and its operations. Codelco’s ongoing mining operations provide a significant portion of the materials the Company processes and its resulting metals production. Therefore, these risks and uncertainties may also affect their operations and have a material effect on the Company.

Actual results and developments will likely differ materially from those expressed or implied by the forward-looking statements in this news release. Such statements are based on several assumptions which may prove to be incorrect, including, but not limited to, assumptions about:

  • general business and economic conditions;

  • interest and currency exchange rates;

  • changes in commodity and power prices;

  • acts of foreign governments and the outcome of legal proceedings;

  • the supply and demand for, deliveries of, and the level and volatility of prices of copper, molybdenum and other commodities and products used in our operations;

  • the ongoing supply of material for processing from Codelco’s current mining operations;

  • the grade and projected recoveries of tailings processed by MVC;

  • the ability of the Company to profitably extract and process material from the Cauquenes tailings deposit;

  • the timing of the receipt of and retention of permits and other regulatory and governmental approvals;

  • our costs of production and our production and productivity levels, as well as those of our competitors;

  • changes in credit market conditions and conditions in financial markets generally;

  • our ability to procure equipment and operating supplies in sufficient quantities and on a timely basis;

  • the availability of qualified employees and contractors for our operations;

  • our ability to attract and retain skilled staff;

  • the satisfactory negotiation of collective agreements with unionized employees;

  • the impact of changes in foreign exchange rates and capital repatriation on our costs and results;

  • engineering and construction timetables and capital costs for our expansion projects;

  • costs of closure of various operations;

  • market competition;

  • tax benefits and tax rates;

  • the outcome of our copper concentrate sales and treatment and refining charge negotiations;

  • the resolution of environmental and other proceedings or disputes;

  • the future supply of reasonably priced power;

  • rainfall in the vicinity of MVC continuing to trend towards normal levels;

  • average recoveries for fresh tailings and Cauquenes tailings;

  • our ability to obtain, comply with and renew permits and licenses in a timely manner; and

  • our ongoing relations with our employees and entities we do business with.

Future production levels and cost estimates assume no adverse mining or other events significantly affecting budgeted production levels.

Although the Company believes that these assumptions were reasonable when made, because these assumptions are inherently subject to significant uncertainties and contingencies which are difficult or impossible to predict and are beyond the Company’s control, the Company cannot assure that it will achieve or accomplish the expectations, beliefs or projections described in the forward-looking statements.

The preceding list of important factors and assumptions is not exhaustive. Other events or circumstances could cause our results to differ materially from those estimated, projected, and expressed in or implied by our forward-looking statements. You should also consider the matters discussed under Risk Factors in the Company`s Annual Information Form. The forward-looking statements contained herein speak only as of the date of this news release. Except as required by law, we undertake no obligation to revise any forward-looking statements or the preceding list of factors, whether due publicly or otherwise, to new information or future events.


Advertisement