Bam Bam Samples 0.89% Cu and 0.638 g/t Au at Majuba Copper Project

Vancouver, British Columbia--(Newsfile Corp. - November 5, 2021) - Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) ("Bam Bam" or the "Company") has received results for 58 road cut-rock chip samples collected from the new drill road construction at the Majuba Hill Project in Pershing County Nevada. The results are very encouraging with six samples returning greater than 2000 ppm (0.2%) copper. All these samples occur within the western group of samples. Five samples along this road returned good gold assays with a high of 0.638 g/t Au (see table below).



Majuba Hill Project Area

To view an enhanced version of this map, please visit:
https://orders.newsfilecorp.com/files/6332/102129_70042f5ed4655a0f_001full.jpg

The results are encouraging because they are consistent with the copper leaching/enrichment model that the Company is using to guide the drilling. Reverse circulation drilling is in-progress to expand and in-fill the Known-Copper Oxide mineralization. The rock chip zone is a 213 meter (700 ft) step-out from any previously drilling in the Known-Copper Oxide Target Area. All previous drilling was directed northward.

David Greenway, President and CEO, commented: "The significant step-out that these high-grade oxide copper samples show is very encouraging. I am particularly encouraged that we are starting to see better gold assays from the surface rock chip sampling."

Sample*

Cu (ppm)

Ag (g/t)

Au (g/t)

Zn (ppm)

Pb (ppm)

Sn (ppm)

Mo (ppm)

MHR-1007

8,890

19.7

0.006

323

13

100

3

MHR-441

5,980

8

0.005

337

9

120

5

MHR-1012

4,030

7

<0.005

229

11

120

5

MHR-1013

3,790

5.2

0.01

360

11

140

4

MHR-442

3,010

10.2

0.023

311

12

140

4

MHR-1014

2,880

3

<0.005

413

6

70

3

MHR-1046

631

2.5

0.005

914

26

90

2

MHR-1015

569

1.8

<0.005

776

14

150

6

MHR-1027

532

3.1

0.638

386

63

130

22

MHR-1008

515

2.6

0.011

120

21

140

51

MHR-1043

483

2.7

0.014

567

15

90

4

MHR-1016

459

2.3

<0.005

849

10

100

6

MHR-436

421

2.8

0.456

281

50

130

12

MHR-1047

403

3.4

0.005

768

13

110

2

MHR-439

391

0.5

0.008

1,280

41

30

28

MHR-1026

366

1.8

0.211

415

65

80

9

MHR-1040

257

0.9

0.005

626

14

60

8

MHR-1032

222

1.5

0.038

683

81

30

19

MHR-1010

209

1.6

0.01

261

9

100

13

MHR-1018

207

1.1

<0.005

287

11

50

3

MHR-1044

202

1.9

0.008

668

6

100

3

MHR-440

196

4.2

0.007

2,190

48

20

100

MHR-1020

177

1.4

0.008

258

19

140

7

MHR-1017

176

3.5

<0.005

198

7

70

3

MHR-1033

173

<0.5

<0.005

1,110

23

20

10

MHR-1058

171

1

0.006

70

6

90

7

MHR-1022

169

0.7

<0.005

1,185

25

70

1

MHR-1019

166

0.9

<0.005

359

17

30

3

MHR-1045

165

1.2

0.006

813

3

80

1

MHR-1011

161

3.4

0.008

169

7

150

7

MHR-1036

157

1.5

0.007

1,380

19

20

29

MHR-438

153

1.8

0.292

192

38

80

7

MHR-1021

151

1.3

<0.005

248

17

130

7

MHR-437

150

1.3

0.099

487

54

70

5

MHR-1024

146

1.2

0.02

269

39

40

4

MHR-1050

137

0.6

0.005

97

2

120

11

MHR-1052

133

0.7

<0.005

141

1

100

6

MHR-1056

110

0.7

0.007

72

1

120

7

MHR-1057

110

1.1

<0.005

74

6

120

8

MHR-1029

107

1.4

0.192

242

42

70

6

MHR-1048

105

1.3

0.005

29

3

120

6

MHR-1034

100

0.6

0.006

1,155

24

20

14

MHR-1053

95

0.8

<0.005

128

2

110

6

MHR-1051

92

0.9

<0.005

112

1

110

6

MHR-1023

87

1.1

0.009

253

23

70

4

MHR-1028

87

0.9

0.017

332

33

60

4

MHR-1042

86

1.6

0.017

196

16

70

15

MHR-1054

86

1

0.008

198

3

130

5

MHR-1049

82

1.1

0.005

73

3

120

6

MHR-1055

82

2.6

0.01

53

2

110

16

MHR-1031

69

0.6

0.043

361

23

30

5

MHR-1030

67

1.1

0.013

302

33

40

4

MHR-1025

55

1

0.034

138

19

50

3

MHR-1035

55

0.5

0.006

2,400

15

20

7

MHR-1039

52

0.8

0.005

1,280

9

40

7

MHR-1037

40

0.6

0.012

780

32

40

13

MHR-1041

20

0.5

0.009

168

8

60

5

MHR-1038

18

0.5

0.006

1,165

11

40

12

*Results are ordered from high to low Cu values. Samples were collected as chip/channel samples on 5 to 10 foot intervals. Sample density is not sufficient to determine true width of mineralization.

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps. The sample rejects and remaining pulps will be retrieved from ALS.

Marketing Agreement

Further, the Company renewed its agreement with TD Media, LLC, dba Life Water Media, to provide digital marketing services to the Company for a term of 14 days, commencing on November 4, 2021, in consideration of USD $150,000. Life Water Media will utilize its online programs to generate a greater following, increase investor awareness and attract new investors through many different online platforms and methods of engagement.

Qualified Person

The scientific and technical information contained in this news release has been reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who is a "Qualified Person" as such term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.

On Behalf of the Board of Bam Bam Resources Corp.

"David Greenway"

David C. Greenway
President & CEO

For further information, please contact:
Joel Warawa
VP of Corporate Communications
E: jw@bambamresources.com
P: 1 (855) 475-0745

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Bam Bam Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/102129

Advertisement