Eldorado Gold Releases Updated Mineral Reserve and Mineral Resource Statement; 2023 Gold Mineral Reserves of 11.7 million ounces and Measured and Indicated Gold Mineral Resources of 19.0 Million Ounces

In this article:
Eldorado Gold CorporationEldorado Gold Corporation
Eldorado Gold Corporation

VANCOUVER, British Columbia, Dec. 13, 2023 (GLOBE NEWSWIRE) -- Eldorado Gold Corporation (“Eldorado” or “the Company”) today releases its updated Mineral Reserve and Mineral Resource (“MRMR”) estimates as of September 30, 2023.

To provide further clarity, on a go-forward basis, the Company is referring to specific assets within the Eldorado Gold Quebec portfolio as the Lamaque Complex. The Lamaque Complex includes the Triangle Mine (Upper and Lower), the Ormaque Deposit, the Parallel Deposit, the Plug #4 Deposit, and the Sigma Mill. This is consistent with how assets are described in the current technical report titled “Technical Report for the Lamaque Project, Québec, Canada’’ with an effective date of December 31, 2021.

Mineral Reserves Update

The Company’s Proven and Probable Gold Mineral Reserves (“2P Reserves”), totalled 11.7 million ounces as of September 30, 2023(i), a decrease of approximately 5% from the previous MRMR statement as of September 30, 2022. Excluding depletion, the 2P Reserves year over year remained relatively flat. The complete table of Mineral Resources and Mineral Reserves can be found at the end of this release.
(i) See “Mineral Reserve Notes” following the detailed tables at the end of this news release.

 

Ore Tonnes
(t x 1,000)

Gold Grade
(g/t)

Total 2P Reserves
(Gold Ounces x 1,000)

Proven and Probable Mineral Reserves as of September 30, 2022(1)

361,677

 

1.06

12,312

 

Depletion(2)

(14,832

)

1.46

(694

)

Adjustments for metal prices, cut-off value and mine plan optimization

3,820

 

0.81

99

 

Proven and Probable Reserves as of September 30, 2023

350,665

 

1.04

11,717

 


(1)

The Company’s total MRMR excludes Reserves at its non-core Romanian asset (Certej), which it plans to divest, consistent with the Company’s strategy of focusing on core jurisdictions in its portfolio.

(2)

Depletion declared here are in-situ ounces. Depletion includes the periods of October 1 through December 31, 2022 and January 1 through September 30, 2023.

Excluding depletion, the change in Proven and Probable Reserves is attributable to a reduction in Reserves at Perama Hill to reflect a revised, smaller pit shell, in accordance with current permitting limitations. Total Resources for Perama Hill are unchanged.

Additions to Reserves were made in the Bati zone at Efemcukuru and at Olympias.

  • Kisladag: Reserves decreased with depletion

  • Efemcukuru: Reserves replaced depletion through inclusion of Bati

  • Lamaque Complex: Reserves decreased due to depletion outpacing conversion as it became more challenging to drill Lower Triangle zones at sufficient density. Resource conversion is expected to progress more quickly as the ramp advances and new drilling platforms are established to test the deeper zones more efficiently.

  • Olympias: Reserves increased due to additional drilling and higher metal prices

The following table summarizes the year-over-year changes to the Company’s Gold Mineral Reserves:

Proven and Probable Gold Mineral Reserves

 

2022

2023

Change(1)

Change excluding depletion

 

Contained Au Oz (x1,000)

Efemcukuru

542

550

8

107

Kisladag

4,069

3,759

(310)

(6)

Lamaque Complex

985

877

(108)

51

Olympias

1,836

1,907

71

187

Perama Hill

1,250

995

(255)

(255)

Skouries

3,630

3,630

-

-

Total

12,312

11,717

(630)

84


NOTE: Numbers may not down-add due to rounding.

(1)

The Company reports on MRMR as of September 30, 2023. As such the change year over year, is from September 30, 2022 to September 30, 2023.


Mineral Resources
Update

Eldorado’s Measured and Indicated Gold Mineral Resources totalled 19.0 million ounces, as of September 30, 2023.(i) This is a 1% decrease from the previous MRMR statement on September 30, 2022, attributable to the conversion of Inferred to Measured and Indicated resources primarily at Efemcukuru, Olympias, and the Lamaque Complex, offset by depletion at Efemcukuru, Kisladag, the Lamaque Complex and Olympias. Eldorado’s Inferred Gold Mineral Resources totalled 7.6 million ounces as of September 30, 2023, a 2% decrease from the previous MRMR statement on September 30, 2022.
(i) See “Mineral Resource Notes” following the detailed tables at the end of this news release. Mineral Reserves are included in the Mineral Resources.  

  • Efemcukuru: The decrease in Inferred Resources is attributable to the upgrade to Measured and Indicated Resources at Kokarpinar South.

  • Kisladag: The decrease in Measured and Indicated Resources is primarily from depletion.

  • Lamaque Complex: The increase in Measured and Indicated at Triangle represented conversion from Inferred Resources, however depletion outpaced conversion.

    • Ormaque: Initial Indicated Resources were converted from Inferred at Ormaque through resource conversion drilling. Additionally, new Inferred Resources were added beyond the amount converted to Indicated. Plans are being advanced to declare initial Reserves in late 2024 following completion of a pre-feasibility study, continued conversion drilling, and extraction of a bulk sample.

Olympias: Inferred Resources were included based on drilling in the bottom section of the East zone.

The following table summarizes the year-over-year changes to the Company’s gold Resources:

Total Measured and Indicated Gold Mineral Resources(1)

 

 

 

Inferred Gold Mineral Resources

 

2022

2023

Change(2)

2022

2023

Change(2)

Contained Au
ounces (x1000)

Contained Au
ounces (x1000)

Efemcukuru

1,069

1,200

131

 

431

176

(255

)

Kisladag

6,603

6,290

(313

)

107

107

-

 

Lamaque Complex

 

 

Triangle, Parallel, and
Plug #4

1,806

1,679

(127

)

2,354

2,305

(49

)

Ormaque

0

191

191

 

839

927

88

 

Lamaque Complex Total

1,806

1,870

64

 

3,193

3,232

39

 

Olympias

3,329

3,198

(131

)

560

589

29

 

Perama Hill

1,374

1,374

-

 

59

59

-

 

Perama South

0

0

-

 

728

728

-

 

Piavitsa

0

0

-

 

1,025

1,025

-

 

Sapes

0

0

-

 

820

820

-

 

Skouries

5,030

5,030

-

 

814

814

-

 

Subtotal

19,210

18,962

(248

)

7,737

7,550

(187

)

For divestiture:
Certej

3,829

3,829

-

 

 

23

23

-

 

Total

23,039

22,791

(248

)

 

7,760

7,573

(187

)


NOTE: Numbers may not down-add due to rounding.

(1)

Mineral Resources are inclusive of Mineral Reserves.

(2)

The Company Reports on MRMR as of September 30, as such the change year over year, is from September 30, 2022 to September 30, 2023.


About Eldorado Gold
Eldorado is a gold and base metals producer with mining, development and exploration operations in Turkiye, Canada, Greece and Romania. The Company has a highly skilled and dedicated workforce, safe and responsible operations, a portfolio of high-quality assets, and long-term partnerships with local communities. Eldorado's common shares trade on the Toronto Stock Exchange (TSX: ELD) and the New York Stock Exchange (NYSE: EGO).

Contact

Investor Relations

Lynette Gould, VP, Investor Relations
647 271 2827 or 1 888 353 8166
lynette.gould@eldoradogold.com

Media

Chad Pederson, Director, Communications
236 885 6251 or 1 888 353 8166
chad.pederson@eldoradogold.com


Eldorado Gold Mineral Reserves as of September 30, 2023

 

 

 

 

 

 

Project

Proven Mineral Reserves

Probable Mineral Reserves

Total Proven and Probable

 

Gold

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

 

 

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

 

Efemcukuru

1,290

5.18

215

2,082

5.01

335

3,372

5.08

550

 

Kisladag

163,085

0.68

3,543

13,491

0.50

216

176,576

0.67

3,759

 

Lamaque Complex

1,033

6.07

202

3,422

6.14

675

4,454

6.12

877

 

Olympias

2,354

8.88

672

6,502

5.91

1,235

8,856

6.70

1,907

 

Perama Hill

3,116

4.08

409

7,176

2.54

586

10,292

3.01

995

 

Skouries

73,101

0.87

2,053

74,015

0.66

1,576

147,116

0.77

3,630

 

TOTAL GOLD

243,978

0.90

7,093

106,687

1.35

4,624

350,665

1.04

11,717

 

Silver

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

 

 

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

 

Olympias

2,354

126

9,568

6,502

126

26,242

8,856

126

35,810

 

Perama Hill

3,116

4.0

403

7,176

5.4

1,237

10,292

5.0

1,639

 

TOTAL SILVER

5,470

57

9,971

13,678

62

27,479

19,148

61

37,450

 

Copper

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Skouries

73,101

0.52

381

74,015

0.48

359

147,116

0.50

740

 

TOTAL COPPER

73,101

0.52

381

74,015

0.48

359

147,116

0.50

740

 

Lead

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Olympias

2,354

4.0

94

6,502

4.3

280

8,856

4.2

374

 

TOTAL LEAD

2,354

4.0

94

6,502

4.3

280

8,856

4.2

374

 

Zinc

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Olympias

2,354

4.7

111

6,502

5.5

357

8,856

5.3

468

 

TOTAL ZINC

2,354

4.7

111

6,502

5.5

357

8,856

5.3

468

 

 

 

 

 

 

 

 

 

 

 

 



Eldorado Gold Mineral Reserves as of September 30, 2022

 

 

 

 

 

 

Project

Proven Mineral Reserves

Probable Mineral Reserves

Total Proven and Probable

 

Gold

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

 

 

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

 

Efemcukuru

1,567

5.59

282

1,617

5.01

260

3,184

5.30

542

 

Kisladag

173,443

0.69

3,856

12,563

0.53

213

186,006

0.68

4,069

 

Lamaque

877

6.82

192

3,753

6.57

793

4,630

6.62

985

 

Olympias

1,583

9.31

474

6,660

6.36

1,362

8,243

6.93

1,836

 

Perama Hill

3,088

4.03

400

9,410

2.81

850

12,498

3.11

1,250

 

Skouries

73,101

0.87

2,053

74,015

0.66

1,576

147,116

0.77

3,630

 

TOTAL GOLD

253,660

0.89

7,257

108,017

1.46

5,055

361,677

1.06

12,312

 

Silver

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

 

 

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

 

Olympias

1,583

136

6,937

6,660

132

28,157

8,243

132

35,094

 

Perama Hill

3,088

4

403

9,410

8

2,277

12,498

7

2,680

 

TOTAL SILVER

4,671

49

7,340

16,070

59

30,434

20,741

57

37,774

 

Copper

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Skouries

73,101

0.52

381

74,015

0.48

359

147,116

0.50

740

 

TOTAL COPPER

73,101

0.52

381

74,015

0.48

359

147,116

0.50

740

 

Lead

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Olympias

1,583

4.4

70

6,660

4.5

300

8,243

4.5

369

 

TOTAL LEAD

1,583

4.4

70

6,660

4.5

300

8,243

4.5

369

 

Zinc

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Olympias

1,583

5.0

79

6,660

5.4

360

8,243

5.3

439

 

TOTAL ZINC

1,583

5.0

79

6,660

5.4

360

8,243

5.3

439

 

 

 

 

 

 

 

 

 

 

 

 

Note:
Mineral Reserves as of September 30, 2022 at Lamaque consisted of Triangle (Upper) and Parallel.

Eldorado Gold Mineral Resources as of September 30, 2023(1)

 

 

 

 

 

 

 

 

 

Project

Measured Resources

Indicated Resources

Total Measured and Indicated

Inferred Resources

 

Gold

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

 

 

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

 

Certej

29,300

1.73

1,626

58,653

1.17

2,203

87,953

1.35

3,829

842

0.86

23

 

Efemcukuru

1,588

7.15

365

3,991

6.51

835

5,580

6.69

1,200

1,323

4.13

176

 

Kisladag

286,037

0.61

5,585

44,280

0.50

705

330,317

0.59

6,290

7,529

0.44

107

 

  Triangle, Plug #4, Parallel

1,183

8.12

309

5,627

7.58

1,370

6,810

7.67

1,679

9,728

7.37

2,305

 

Ormaque(2)

0

0.00

0.00

309

19.24

191

309

19.24

191

1,869

15.43

927

 

Lamaque Complex

1,183

8.12

309

5,936

8.19

1,561

7,119

8.17

1,870

11,597

8.67

3,232

 

Olympias

3,447

10.59

1,174

8,992

7.00

2,024

12,439

8.00

3,198

2,339

7.84

589

 

Perama Hill

3,093

4.15

412

10,973

2.73

962

14,066

3.04

1,374

1,136

1.63

59

 

Perama South

0

0.00

0

0

0.00

0

0

0.00

0

14,870

1.52

728

 

Piavitsa

0

0.00

0

0

0.00

0

0

0.00

0

6,613

4.82

1,025

 

Sapes

0

0.00

0

0

0.00

0

0

0.00

0

3,434

7.43

820

 

Skouries

90,714

0.85

2,479

149,260

0.53

2,551

239,974

0.65

5,030

67,657

0.37

814

 

TOTAL GOLD

415,362

0.89

11,950

282,086

1.20

10,841

697,448

1.02

22,791

117,341

2.01

7,574

 

Silver

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

 

 

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

 

Certej

29,300

9

8,111

58,653

10

18,103

87,953

9

26,214

842

4

110

 

Olympias

3,447

152

16,849

8,992

144

41,770

12,439

147

58,619

2,339

179

13,488

 

Perama Hill

3,093

4

415

10,973

7

2,579

14,066

7

2,994

1,136

2

83

 

Piavitsa

0

0

0

0

0

0

0

0

0

6,613

54

11,389

 

Stratoni

0

0

0

1,391

152

6,785

1,391

152

6,785

1,807

166

9,672

 

TOTAL SILVER

35,840

22

25,375

80,009

27

69,237

115,849

25

94,612

12,737

85

34,742

 

Copper

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Skouries

90,714

0.51

466

149,260

0.44

652

239,974

0.47

1,118

67,657

0.40

267

 

TOTAL COPPER

90,714

0.51

466

149,260

0.44

652

239,974

0.47

1,118

67,657

0.39

267

 

Lead

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Olympias

3,447

4.8

167

8,992

4.9

441

12,439

4.9

608

2,339

6.2

146

 

Stratoni

0

0.0

0

1,391

6.0

84

1,391

6.0

84

1,807

6.9

124

 

TOTAL LEAD

3,447

4.84

167

10,383

5.1

525

13,830

5.0

692

4,146

6.5

270

 

Zinc

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Olympias

3,447

5.9

204

8,992

6.6

593

12,439

6.4

797

2,339

6.8

160

 

Stratoni

0

0.0

0

1,391

8.4

117

1,391

8.4

117

1,807

8.3

150

 

TOTAL ZINC

3,447

5.9

204

10,383

6.8

710

13,830

6.6

914

4,146

7.5

310

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Notes:

(1)

 

Resource grades are reported undiluted, however resources assessed for reasonable expectation of economic extraction by applying expected minimum mining shapes.

(2)

 

Due to narrow veins, any future potential conversion of Resources to Reserves at Ormaque will reflect expected lower grades to fully represent mining modifying factors.


Eldorado Gold Mineral Resources as of September 30, 2022

 

 

 

 

 

 

 

 

 

Project

Measured Resources

Indicated Resources

Total Measured and Indicated

Inferred Resources

 

Gold

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

Tonnes

Au

Contained Au

 

 

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

 

Certej

29,300

1.73

1,626

58,653

1.17

2,203

87,953

1.35

3,829

842

0.86

23

 

Efemcukuru

1,857

7.37

440

2,842

6.88

629

4,699

7.07

1,069

2,677

5.01

431

 

Kisladag

300,070

0.61

5,895

44,408

0.50

708

344,478

0.60

6,603

7,529

0.44

107

 

Lamaque

1,125

9.14

331

5,978

7.68

1,475

7,103

7.91

1,806

10,003

7.32

2,354

 

Ormaque

0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,223

11.74

839

 

Olympias

2,618

10.49

883

10,319

7.37

2,446

12,937

8.00

3,329

2,186

7.97

560

 

Perama Hill

3,093

4.15

412

10,973

2.73

962

14,066

3.04

1,374

1,136

1.63

59

 

Perama South

0

0.00

0

0

0.00

0

0

0.00

0

14,870

1.52

728

 

Piavitsa

0

0.00

0

0

0.00

0

0

0.00

0

6,613

4.82

1,025

 

Sapes

0

0.00

0

0

0.00

0

0

0.00

0

3,434

7.43

820

 

Skouries

90,714

0.85

2,479

149,260

0.53

2,551

239,974

0.65

5,030

67,657

0.37

814

 

TOTAL GOLD

428,777

0.88

12,065

282,432

1.21

10,974

711,209

1.01

23,039

119,170

2.03

7,761

 

Silver

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

Tonnes

Ag

Contained Ag

 

 

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

(x1000)

 g/t

ounces (x1000)

 

Certej

29,300

9

8,111

58,653

10

18,103

87,953

9

26,214

842

4

110

 

Olympias

2,618

148

12,440

10,319

148

49,212

12,937

148

61,651

2,186

190

13,368

 

Perama Hill

3,093

4

415

10,973

7

2,579

14,066

7

2,994

1,136

2

83

 

Piavitsa

0

0

0

0

0

0

0

0

0

6,613

54

11,389

 

Stratoni

0

0

0

1,351

153

6,647

1,351

153

6,647

1,700

162

8,866

 

TOTAL SILVER

35,011

19

20,966

81,296

29

76,541

116,307

26

97,506

12,477

84

33,816

 

Copper

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

Tonnes

Cu

Contained Cu

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Skouries

90,714

0.51

466

149,260

0.44

652

239,974

0.47

1,118

67,657

0.40

267

 

TOTAL COPPER

90,714

0.51

466

149,260

0.44

652

239,974

0.47

1,118

67,657

0.39

267

 

Lead

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

Tonnes

Pb

Contained Pb

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Olympias

2,618

4.8

125

10,319

5.0

520

12,937

5.0

645

2,186

6.5

142

 

Stratoni

0

0.0

0

1,351

6.1

82

1,351

6.1

82

1,700

6.2

106

 

TOTAL LEAD

2,618

4.79

125

11,670

5.2

602

14,288

5.1

727

3,886

6.4

248

 

Zinc

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

Tonnes

Zn

Contained Zn

 

 

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

(x1000)

%

tonnes (x1000)

 

Olympias

2,618

5.7

150

10,319

6.6

682

12,937

6.4

831

2,186

7.3

158

 

Stratoni

0

0.0

0

1,351

8.7

117

1,351

8.7

117

1,700

9.3

158

 

TOTAL ZINC

2,618

5.7

150

11,670

6.8

799

14,288

6.6

948

3,886

8.1

316

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Note:
Mineral Resources as of September 30, 2022 at Lamaque consisted of Triangle (Upper and Lower) Parallel, and Plug #4.

ADVISORIES AND DETAILED NOTES ON MINERAL RESERVES AND RESOURCES

General

Mineral Resources and Mineral Reserves are as of September 30, 2023

The Mineral Resources and Mineral Reserves were classified using logic consistent with the CIM Definition Standards for Mineral Resources & Mineral Reserves (2014) incorporated, by reference, into National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).   Sample preparation, analytical techniques, laboratories used, and quality assurance and quality control protocols used during exploration drilling programs are done consistent with industry standards while independent certified assay labs are used.

Mineral Reserves are included in the Mineral Resources.

The Mineral Resources and Mineral Reserves are disclosed on a total project basis.

Mineral resources which are not mineral reserves do not have demonstrated economic viability. With respect to “inferred mineral resources”, there is a great amount of uncertainty as to their existence and a great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an “indicated mineral resource” or “inferred mineral resource” will ever be upgraded to a higher category.

Additional information on the mineral properties mentioned in this news release that are considered to be material mineral properties to the Company are contained in Eldorado’s annual information form for the year ended December 31, 2022 and the following technical reports for each of those properties, all of which are available under the Company's profile at www.sedarplus.com and www.sec.gov:

  • Technical report entitled "Technical Report, Kisladag Gold Mine, Turkiye” with an effective date of January 17, 2020.

  • Technical report entitled "Technical Report, Efemcukuru Gold Mine, Turkiye” with an effective date of December 31, 2019.

  • Technical report entitled “Technical Report, Olympias Mine, Greece” with an effective date of December 31, 2019.

  • Technical report entitled “Technical Report, Skouries Project, Greece” with an effective date of January 22, 2022.

  • Technical report entitled “Technical Report, for the Lamaque Project, Quebec, Canada’” with an effective date of December 31, 2021.

Qualified Persons

Simon Hille, FAusIMM, Executive Vice President, Technical Services and Operations, is the “qualified person” under NI 43-101 responsible for preparing and supervising the preparation of the scientific or technical information contained in this news release and verifying the technical data disclosed in this document relating to our operating mines and development projects. Additional qualified persons have approved disclosures for specific properties as detailed in “Mineral Reserve Notes” and “Mineral Resource Notes” below. Jessy Thelland, géo (OGQ No. 758)., Director Technical Services Lamaque, a member in good standing of the Ordre des Géologues du Québec, is the qualified person as defined in NI 43-101 responsible for, and has verified and approved, the scientific and technical disclosure contained in this news release for the Quebec projects.

Cautionary Note to US Investors Concerning Estimates of Measured, Indicated and Inferred Resources
There are differences between the standards and terms used for reporting mineral reserves and resources in Canada, and in the United States pursuant to the United States Securities and Exchange Commission’s (the “SEC”). The terms mineral resource, measured mineral resource, indicated mineral resource and inferred mineral resource are defined by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) and the CIM Definition Standards on Mineral Resources and Mineral Reserves adopted by the CIM Council, and must be disclosed according to Canadian securities regulations.
These standards differ from the requirements of the SEC applicable to domestic United States reporting companies. Accordingly, information contained in this news release with respect to mineral deposits may not be comparable to similar information made public by United States companies subject to the SEC’s reporting and disclosure requirements.

Mineral Reserve Notes

Eldorado reports Mineral Reserves in accordance with CIM Definition Standards. Mineral Reserves for the operating sites (Efemcukuru, Kisladag, Olympias, and the Triangle Mine within the Lamaque Complex) were determined using a long-term gold price of $1,400/oz while Mineral Reserves for the Skouries and Perama Hill projects were determined based on a $1,300/oz gold price. A reserve test is undertaken every year to confirm future undiscounted cash flow from reserve mine plan is positive.

1.   Long-Term Metal Price Assumptions

  • Gold price: $1,400/oz

  • Silver price: $19.00/oz

  • Copper price: $2.75/lb

  • Lead price: $2,000/t

  • Zinc price: $2,500/t

2.   Cut-off Grades

Efemcukuru: $123.62/t NSR (long hole stoping), $126.60/t NSR (drift and fill); Kisladag: 0.17 g/t Au Recoverable; Lamaque (Triangle Mine): 5.06 g/t Au; Olympias: $217.63/t NSR; Perama Hill: 0.81 g/t Au; Skouries: $10.60/t NSR (open pit), $33.33/t NSR (underground).

3.   Qualified Persons

The following persons, all of whom are qualified persons under NI 43-101, have approved the disclosure contained within this release:

Asset

Mining Type(s)

Qualified Person

Company

Efemcukuru

Underground

Mike Tsafaras, P.Eng., Director, Underground Mine Planning

Eldorado Gold

Kisladag

Open Pit

Herb Ley, SME-RM, Senior Project Manager

Stantec

Lamaque Complex

Underground

Jessy Thelland, géo (OGQ No. 758)., Technical Services Director Lamaque

Eldorado Gold

Olympias

Underground

Victor Vdovin, P.Eng., Head of Technical Services, Kassandra

Eldorado Gold

Skouries

Open Pit

Victor Vdovin, P.Eng., Head of Technical Services, Kassandra

Eldorado Gold

Skouries

Underground

Mike Tsafaras, P.Eng., Director, Underground Mine Planning

Eldorado Gold

Perama Hill

Open Pit

Herb Ley, SME-RM, Senior Project Manager

Stantec


Mineral Resource Notes

Eldorado reports Mineral Resources in accordance with CIM Definition Standards. All Mineral Resources are assessed for reasonable prospects for eventual economic extraction (RPEEE). The Resource cut-off grades or values (e.g. gold equivalent) are determined using a long-term gold price ($1,800/oz) and modifying factors derived in the resource to reserve conversion process (or by comparison to similar projects for our resource-only properties). These values are then used to create constraining volumes that provide limits to the reported Resources. Resource grades are reported undiluted from within the constraining volumes that satisfy RPEEE. Due to the presence of narrow veins, any future potential conversion of Resources to Reserves at Ormaque will reflect expected lower grades to fully represent modifying factors associated with mining.

Open Pit Resources used pit shells created with the long-term gold price to constrain reportable model blocks. Underground Resources were constrained by volumes whose design was guided by a combination of the reporting cut-off grade or value, contiguous areas of mineralization and mineability. Eldorado’s Mineral Resources are inclusive of Reserves.

1.   Long-Term Metal Price Assumptions:

  • Gold price: $1,800/oz

  • Silver price: $24/oz

  • Copper price: $3.25/lb

  • Lead price: $2,200/t

  • Zinc price: $2,800/t

2. Mineral Resource Reporting and demonstration of Reasonable Prospects for Eventual Economic Extraction:

The Mineral Resources used a long term look gold metal price of $1,800/oz for the determination of resource cut-off grades or values. This guided execution of the next step where constraining surfaces or volumes were created to control resource reporting. Open pit-only projects (Kisladag, Perama Hill, Perama South, and Certej) used pit shells created with the long-term gold price to constrain reportable model blocks. Underground Resources were constrained by 3D volumes whose design was guided by the reporting cut-off grade or value, contiguous areas of mineralization and mineability. Only material internal to these volumes were eligible for reporting. Projects with both open pit and underground resources have the open pit Resources constrained by either the permit (Skouries), and pit shell, or by an open pit/underground economic crossover surface, and underground Resources constrained by a reporting shape.

3.   Cut-off Grades

Certej: 0.60 g/t Au; Efemcukuru: 2.5 g/t Au; Kisladag: 0.25 g/t Au (in-situ); Lamaque (Triangle Mine): 3.0 g/t Au; Ormaque: 3.5 g/t Au; Olympias: $125/t NSR; Perama Hill and Perama South: 0.50 g/t Au; Piavitsa: 4.0 g/t Au; Sapes: 2.5 g/t Au (underground), 1.0 g/t Au (open pit); Skouries: 0.30 g/t Au Equivalent grade (open pit), 0.70 g/t Au Equivalent grade (underground) (=Au g/t + 1.25*Cu%); Stratoni: $200/t NSR.

4.   Qualified Persons

The following persons, all of whom are qualified persons under NI 43-101, have approved the disclosure contained within this release:

Asset

Mining Type(s)

Qualified Person

Company

Efemcukuru

Underground

Ertan Uludag, P.Geo., Manager, Resource Geology

Eldorado Gold

Kisladag

Open Pit

Ertan Uludag, P.Geo., Manager, Resource Geology

Eldorado Gold

Lamaque Complex

Underground

Jessy Thelland, géo (OGQ No. 758)., Technical Services Director Lamaque

Eldorado Gold

Ormaque

Underground

Jessy Thelland, géo (OGQ No. 758)., Technical Services Director Lamaque

Eldorado Gold

Olympias

Underground

Ertan Uludag, P.Geo., Manager, Resource Geology

Eldorado Gold

Skouries

Open Pit

Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation

Eldorado Gold

Skouries

Underground

Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation

Eldorado Gold

Perama Hill

Open Pit

Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation

Eldorado Gold

Perama South

Open Pit

Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation

Eldorado Gold

Piavitsa

Underground

Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation

Eldorado Gold

Sapes

Underground and Open Pit

Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation

Eldorado Gold

Stratoni

Underground

Ertan Uludag, P.Geo., Manager, Resource Geology

Eldorado Gold

Certej

Open Pit

Sean McKinley, P.Geo., Manager, Mine Geology & Reconciliation

Eldorado Gold


Cautionary Note about Forward-looking Statements and Information

Certain of the statements made and information provided in this press release are forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward-looking statements and forward-looking information can be identified by the use of words such as “anticipates”, “believes”, “budget”, “continue”, “estimates”, “expects”, “forecasts”, “foresee”, “future”, “goal”, “guidance”, “intends”, “opportunity”, “outlook”, “plans”, “potential”, “strive”, “target” or “underway” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “can”, “could”, “likely”, “may”, “might”, “will” or “would” be taken, occur or be achieved.

Forward-looking statements or information contained in this release include, but are not limited to, statements or information with respect to: our mineral reserves and mineral resources; the sale of the Certej project; our plans with respect to the declaration of reserves at Ormaque, mine design plans at Perama Hill, our expectation as to our future financial and operating performance, which in turn is underpinned by the disclosed outlook on long term metal prices; and our strategy, plans and goals. uncertainties and other factors, which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

We have made certain assumptions about the forward-looking statements and information, including assumptions about: ability to obtain all required approvals and permits in a timely manner and our ability to comply with all the conditions that are imposed in such approvals and permits; changes in input costs, exchange rates, development and gold; the geopolitical, economic, permitting and legal climate that we operate in; our preliminary gold production and our guidance, benefits of the completion of the decline at the Lamaque Complex, the improvements at Kisladag and the optimization of Greek operations; tax expenses in Turkiye; how the world-wide economic and social impact of COVID-19 is managed and the duration and extent of the COVID-19 pandemic; timing, cost and results of our construction and exploration; the geopolitical, economic, permitting and legal climate that we operate in; the future price of gold and other commodities; the global concentrate market; exchange rates; anticipated values, costs, expenses and working capital requirements; production and metallurgical recoveries; mineral reserves and resources; and the impact of acquisitions, dispositions, suspensions or delays on our business and the ability to achieve our goals. In addition, except where otherwise stated, we have assumed a continuation of existing business operations on substantially the same basis as exists at the time of this release.

Even though our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statement or information will prove to be accurate. Many assumptions may be difficult to predict and are beyond our control.

Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors include, among others, the following: operational performance rates including but not limited to development rates, production drilling activity, and stope sequencing; increases in the non-fixed portion of the financing costs or adverse changes to the Term Facility funding the Skouries project; failure or delays to receive necessary approvals or otherwise satisfy the conditions to the continued drawdown of the Term Facility; the proceeds of the Term Facility not being available to the Company or Hellas; ability to execute on the project plan relating to Skouries which in turn depends on, among other things, the pace of contract awards, labour productivity levels, and ability to achieve the social impacts and benefits contemplated; ability to meet production, expenditure and cost guidance; inability to achieve the expected benefits of the completion of the decline at the Lamaque Complex, performance improvements at Kisladag including but not limited to solution flow, irrigation areas and permeability, and the optimization of Greek operations; inability to assess income tax expenses in Turkiye; inability to obtain required approvals and permits in a timely manner; inability to maintain our social license to operate including our inability to successful obtain regional community support and complete all required community consultations; inability to meet production guidance; risks relating to the ongoing COVID-19 pandemic and any future pandemic, epidemic, endemic or similar public health threats; risks relating to our operations being located in foreign jurisdictions; climate change; liquidity and financing risks; development risks; indebtedness, including current and future operating restrictions, implications of a change of control, ability to meet debt service obligations, the implications of defaulting on obligations and change in credit ratings; environmental matters; waste disposal; the global economic environment; government regulation; reliance on a limited number of smelters and off-takers; commodity price risk; mineral tenure; delays in obtaining or renewing approvals, tenures and permits, the nature of the conditions imposed by government and our ability to comply with those conditions; risks relating to environmental sustainability and governance practices and performance; non-governmental organizations; corruption, bribery and sanctions; litigation and contracts; information technology systems; estimation of mineral reserves and mineral resources; production and processing estimates; credit risk; actions of activist shareholders; price volatility, volume fluctuations and dilution risk in respect of our shares; reliance on infrastructure, commodities and consumables; currency risk; inflation risk; interest rate risk; tax matters; dividends; financial reporting, including relating to the carrying value of our assets and changes in reporting standards; labour, including relating to employee/union relations, employee misconduct, key personnel, skilled workforce, expatriates and contractors; reclamation and long-term obligations; regulated substances; necessary equipment; co-ownership of our properties; acquisitions, including integration risks, and dispositions; the unavailability of insurance; conflicts of interest; compliance with privacy legislation; reputational issues; competition. The reader is directed to carefully review the detailed risk discussion in our most recent Annual Information Form & Form 40-F filed on SEDAR and EDGAR under our Company name, which discussion is incorporated by reference in this release, for a fuller understanding of the risks and uncertainties that affect our business and operations.

The inclusion of forward-looking statements and information is designed to help you understand management’s current views of our near- and longer-term prospects, and it may not be appropriate for other purposes.

There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company’s business contained in the Company’s reports filed with the securities regulatory authorities in Canada and the United States.


Advertisement