SVBL - Silver Bull Resources, Inc.

Other OTC - Other OTC Delayed Price. Currency in USD
0.0621
+0.0001 (+0.16%)
As of 10:22AM EST. Market open.
Stock chart is not supported by your current browser
Previous Close0.0620
Open0.0650
Bid0.0000 x 0
Ask0.0000 x 0
Day's Range0.0620 - 0.0660
52 Week Range0.0600 - 0.1400
Volume71,991
Avg. Volume204,820
Market Cap15.428M
Beta (5Y Monthly)0.34
PE Ratio (TTM)N/A
EPS (TTM)-0.0170
Earnings DateN/A
Forward Dividend & YieldN/A (N/A)
Ex-Dividend DateN/A
1y Target Est0.75
  • GlobeNewswire

    Silver Bull Intercepts 17.1 Meters of Mineralization Grading 120g/t Silver and 0.43% Copper, Including 2.25 Meters Grading 198g/t Silver and 1.66% Copper on the Sierra Mojada Project in Coahuila, Mexico

    VANCOUVER, British Columbia, Oct. 04, 2019 -- Silver Bull Resources, Inc. (TSX: SVB, OTCQB: SVBL) (“Silver Bull”) is pleased to provide results from an additional 11 drill.

  • Reuters

    Mining firm Silver Bull says its Mexico Sierra Mojada project 'illegally' blockaded

    Canadian mining firm Silver Bull Resources said in a statement on Monday that it has temporarily suspended work at its Sierra Mojada project in northern Mexico due to a blockade by a cooperative of local miners. Silver Bull said it is in an ongoing legal battle with the cooperative, called Sociedad Cooperativa de Exploracion Minera Mineros Nortenos, which "illegally blocked" access to the project before a final court ruling is issued on the conflict. Silver Bull is exploring for silver and zinc at the project.

  • Reuters

    Mining firm Silver Bull says its Mexico Sierra Mojada project "illegally" blockaded

    Canadian mining firm Silver Bull Resources said in a statement on Monday that it has temporarily suspended work at its Sierra Mojada project in northern Mexico due to a blockade by a cooperative of local miners. Silver Bull said it is in an ongoing legal battle with the cooperative, called Sociedad Cooperativa de Exploracion Minera Mineros Nortenos, which "illegally blocked" access to the project before a final court ruling is issued on the conflict. Silver Bull is exploring for silver and zinc at the project.

  • GlobeNewswire

    Silver Bull Halts Operations at the Sierra Mojada Project Due to Blockade

    Silver Bull Resources, Inc. (TSX: SVB, OTCQB: SVBL) (“Silver Bull”) has temporarily halted all work on the Sierra Mojada project due to a blockade by a cooperative of local miners called Sociedad Cooperativa de Exploración Minera Mineros Norteños, S.C.L. (“Mineros Norteños”). Silver Bull has an agreement with Mineros Norteños on two mineral licences which cover the eastern part of the Sierra Mojada deposit. Since 2014, Silver Bull has been fighting a law suit by Mineros Norteños seeking payment of the Royalty, including interest at a rate of 6% per annum since August 30, 2004, even though no revenue has been produced from the applicable mining concessions.

  • GlobeNewswire

    Silver Bull Makes New Discovery and Intercepts 13.25 Meters of Massive Sulphide Grading 9.05% Zinc, 2.12% Lead and 16g/t Silver, Including 5.85 Meters Grading 11.93% Zinc, 2.83% Lead and 24g/t Silver in Coahuila, Mexico

    Silver Bull Resources, Inc. (TSX: SVB, OTCQB: SVBL) (“Silver Bull”) is pleased to provide results from an additional 5 drill holes on the Sierra Mojada Project in Coahuila, Northern Mexico. The Drill Program: Under a joint venture option agreement with South32 Ltd (“South32”), Silver Bull is conducting an initial 8,000 meter surface drill program targeting a series of possible sulphide extensions at depth to the main deposit, as well as a series of never before tested targets within the wider area.

  • GlobeNewswire

    Silver Bull Extends Sierra Mojada Strike Length by 950m, Intersects 1.35 Meters of Mineralization Grading 10.47% Zinc, 8.25% Lead, & 586g/t Silver, and 1.8 Meters Grading 12.2% Zinc, 1.4% Lead & 53g/t Silver in Coahuila, Mexico

    Silver Bull Resources, Inc. (TSX: SVB, OTCQB: SVBL) (“Silver Bull”) is pleased to provide results from its first two drill holes on the Sierra Mojada Project in Coahuila, Northern Mexico. The Drill Program: Under a joint venture option agreement with South32, Silver Bull is conducting an initial 8,000 meter surface drill program targeting a series of possible sulphide extensions at depth to the main deposit, as well as a series of never before tested targets within the wider area.

  • GlobeNewswire

    South32 Maintains Option on the Sierra Mojada Project

    Silver Bull Resources, Inc. (OTCQB: SVBL, TSX: SVB) (“Silver Bull”) is pleased to announce it has received notice from South32 that it wishes to maintain its option on the Sierra Mojada Project by funding an additional US$3 million in exploration. Silver Bull has a drill program underway on the project and a full update will be released to the market shortly. South32 Joint Venture Option: In June 2018 Silver Bull signed an agreement with a wholly owned subsidiary of South32 whereby Silver Bull has granted South32 an option to form a 70/30 joint venture with respect to the Sierra Mojada Project.

  • GlobeNewswire

    Silver Bull Announces Voting Results From 2019 Annual Shareholder Meeting

    VANCOUVER, British Columbia, April 19, 2019 -- Silver Bull Resources, Inc. (TSX: SVB; OTCQB: SVBL) (“Silver Bull” or the ”Company”) is pleased to announce the detailed voting.

  • GlobeNewswire

    Silver Bull Receives Drill Permits and Announces the Start of an Initial 8,000 Meter Drill Program on the Sierra Mojada Project, Coahuila, Mexico.

    Silver Bull Resources, Inc. (OTCQB: SVBL, TSX: SVB) (“Silver Bull”) is pleased to announce it has received the appropriate drill permits from the Mexican Government, and has commenced an initial 8,000 meter surface drill program targeting a series of the sulphide extensions at depth to the main deposit, as well as a series of never before tested targets within the wider area. The drill program is conducted under the Joint Venture Option with South32. South32 Joint Venture Option: In June 2018 Silver Bull signed an agreement with South32 whereby Silver Bull has granted South32 an option to form a 70/30 joint venture with respect to the Sierra Mojada Project.

  • GlobeNewswire

    Silver Bull Provides Corporate Update and Announces the Imminent Start of an 8,000 Meter Drill Program on the Sierra Mojada Project, Coahuila, Mexico

    Silver Bull Resources, Inc. (OTCQB: SVBL, TSX: SVB) (“Silver Bull”) is pleased to provide a corporate update on the Sierra Mojada project and announce the imminent start of an 8,000 meter surface drill program to target a series of the sulphide extension at depth of the main deposit already defined at Sierra Mojada as well as a series of never before tested targets within the wider area. The start of this drill program caps off an extremely successful 2018 for Silver Bull which was marked by a number of key milestones. South32 Joint Venture Option: In June 2018 Silver Bull signed an agreement with a wholly owned subsidiary of South32 Limited (ASX/JSE/LSE: S32) (“South32”) whereby Silver Bull has granted South32 an option to form a 70/30 joint venture with respect to the Sierra Mojada Project.